Contract Outputs

Location: Battambang Budget Year: 2005

Banan    Thma Koul    Battambang    Bavel    Aek Phnum    Moung Ruessei    Rotonak Mondol    Sangkae    Samlout    Sampov Lun    Phnum Proek    Kamrieng    Koas Krala   

Banan, Kantueu Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020101/05/01 TSO Sar Sarin Project Type Rural Domestic Water Supplies 6,900,000
Tuol Thnong 1 141 Pond with no filter 1.00 [ 1.00 ] Place 6,900,000 3.000 Depth (m) 2,373.000 Volume (m3) 6,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,900,000
Contract ID 020101/05/02 TSO Sar Sarin Project Type Rural Transport 16,511,900
Kampong Ampil 1 202 Laterite road 1.21 [ 1.46 ] Km 11,322,705 2.500 Width (m) 150.000 Earth fill m3 16,511,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,511,900

Banan, Kantueu Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020102/05/01 TSO Sar Sarin Project Type Rural Transport 24,046,400
Chhay Rumpoat 1 201 Earth road 1.47 [ 1.91 ] Km 11,565,021 4.000 Width (m) 6,580.000 Earth fill m3 22,046,400
Kampang Kaeut 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,046,400

Banan, Bay Damram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020103/05/01 TSO Sar Sarin Project Type Rural Transport 26,310,300
Sdau 1 201 Earth road 1.35 [ 1.92 ] Km 12,074,234 4.000 Width (m) 7,556.000 Earth fill m3 23,210,300
Ta Song 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,550,000 0.800 Diameter (m) 5.000 Length (m) 3,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,310,300

Banan, Chheu Teal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020104/05/01 TSO Sar Sarin Project Type Rural Transport 11,641,100
Khnar 1 202 Laterite road 1.50 [ 1.55 ] Km 7,527,384 2.500 Width (m) 150.000 Earth fill m3 11,641,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,641,100
Contract ID 020104/05/02 TSO Sar Sarin Project Type Rural Transport 24,956,900
Kampong Chamlang 1 201 Earth road 1.30 [ 1.30 ] Km 8,921,283 4.000 Width (m) 3,565.000 Earth fill m3 11,597,668
Kampong Chamlang 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,550,000 0.800 Diameter (m) 5.000 Length (m) 3,100,000
Bat Sala 3 201 Earth road 0.42 [ 1.15 ] Km 8,921,847 4.000 Width (m) 1,219.000 Earth fill m3 10,259,232
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,956,900

Banan, Chaeng Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020105/05/01 TSO Sar Sarin Project Type Rural Transport 14,911,400
Doang 1 202 Laterite road 0.00 [ 0.36 ] Km 7,737,004 3.000 Width (m) 150.000 Earth fill m3 2,768,300
Doang 2 202 Laterite road 0.45 [ 0.45 ] Km 7,735,556 3.000 Width (m) 150.000 Earth fill m3 3,481,000
Doang 3 202 Laterite road 0.40 [ 0.40 ] Km 7,735,750 3.000 Width (m) 150.000 Earth fill m3 3,094,300
Doang 4 202 Laterite road 0.50 [ 0.50 ] Km 7,735,600 3.000 Width (m) 150.000 Earth fill m3 3,867,800
Doang 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,911,400
Contract ID 020105/05/02 TSO Sar Sarin Project Type Rural Transport 10,883,300
Changhour Svay 1 201 Earth road 0.38 [ 0.48 ] Km 19,474,093 4.000 Width (m) 2,624.000 Earth fill m3 9,283,300
Changhour Svay 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 1,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,883,300

Banan, Phnum Sampov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020106/05/01 TSO Sar Sarin Project Type Irrigation 7,000,000
Sampov Lech 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 7,000,000 2.000 Total span (m) 1.200 Width (m) 7,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,000,000
Contract ID 020106/05/02 TSO Sar Sarin Project Type Irrigation 18,900,000
Sampov Kaeut 1 420 Canal 1.46 [ 1.46 ] Km 12,980,769 1.200 Depth (m) 5,766.000 Volume (m3) 18,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,900,000
Contract ID 020106/05/03 TSO Sar Sarin Project Type Irrigation 3,441,200
Sampov Kaeut 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,720,600 0.800 Diameter (m) 5.000 Length (m) 3,441,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,441,200

Banan, Snoeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020107/05/01 TSO Sar Sarin Project Type Rural Transport 36,729,800
Snoeng Lech 1 202 Laterite road 1.43 [ 1.43 ] Km 7,756,421 2.500 Width (m) 150.000 Earth fill m3 11,052,900
Snoeng Lech 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 4,400,000
Snoeng Lech 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Kor 4 202 Laterite road 0.51 [ 0.51 ] Km 7,756,471 2.500 Width (m) 150.000 Earth fill m3 3,955,800
Kor 5 202 Laterite road 0.45 [ 0.45 ] Km 7,756,444 2.500 Width (m) 150.000 Earth fill m3 3,490,400
Samraong 6 202 Laterite road 0.97 [ 1.24 ] Km 7,756,685 2.500 Width (m) 150.000 Earth fill m3 9,630,700
Samraong 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 2,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,729,800

Banan, Ta Kream

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020108/05/01 TSO Sar Sarin Project Type Rural Transport 40,437,600
Slab Pang 1 201 Earth road 2.41 [ 3.59 ] Km 8,988,155 4.000 Width (m) 7,150.000 Earth fill m3 32,248,600
Slab Pang 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,239,000 1.000 Diameter (m) 5.000 Length (m) 4,478,000
Slab Pang 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,711,000 1.000 Diameter (m) 5.000 Length (m) 3,711,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,437,600

Thma Koul, Ta Pung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020201/05/01 TSO Vay Sokunthea Project Type Irrigation 37,521,000
Paoy Samraong 1 420 Canal 0.80 [ 0.80 ] Km 14,008,019 1.000 Depth (m) 2,645.000 Volume (m3) 11,136,375
Tumpung Tboung 2 420 Canal 1.30 [ 1.43 ] Km 14,003,550 1.000 Depth (m) 4,326.000 Volume (m3) 20,081,090
Ang Tboung 3 420 Canal 0.45 [ 0.45 ] Km 14,007,856 1.000 Depth (m) 1,497.000 Volume (m3) 6,303,535
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,521,000

Thma Koul, Ta Meun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020202/05/01 TSO Vay Sokunthea Project Type Rural Transport 24,344,300
Kouk Trab 1 202 Laterite road 1.40 [ 1.40 ] Km 10,700,000 3.000 Width (m) 150.000 Earth fill m3 14,980,000
Ta Sei 2 202 Laterite road 0.30 [ 0.30 ] Km 10,700,000 3.000 Width (m) 150.000 Earth fill m3 3,210,000
Thma Koul Cheung 3 202 Laterite road 0.30 [ 0.35 ] Km 10,696,011 3.000 Width (m) 150.000 Earth fill m3 3,754,300
Kouk Trab 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,344,300
Contract ID 020202/05/02 TSO Vay Sokunthea Project Type Irrigation 13,085,200
Tumneab 1 420 Canal 0.50 [ 0.50 ] Km 11,792,036 1.000 Depth (m) 1,074.000 Volume (m3) 5,896,018
Thmei 2 420 Canal 0.65 [ 0.65 ] Km 6,977,535 1.000 Depth (m) 1,396.000 Volume (m3) 4,535,398
Ta Sei 3 420 Canal 0.21 [ 0.29 ] Km 9,057,283 1.000 Depth (m) 442.000 Volume (m3) 2,653,784
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,085,200

Thma Koul, Ou Ta Ki

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020203/05/01 TSO Vay Sokunthea Project Type Irrigation 37,345,400
Ou Ta Ki 1 420 Canal 0.60 [ 0.60 ] Km 12,255,390 1.000 Depth (m) 1,007.000 Volume (m3) 7,390,000
Popeal Khae 2 420 Canal 1.48 [ 1.86 ] Km 4,986,760 1.000 Depth (m) 2,475.000 Volume (m3) 9,265,400
Tras 3 420 Canal 1.48 [ 1.48 ] Km 4,986,505 1.000 Depth (m) 2,475.000 Volume (m3) 7,390,000
Veal Trea 4 420 Canal 1.48 [ 1.48 ] Km 8,980,419 1.000 Depth (m) 2,473.000 Volume (m3) 13,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,345,400

Thma Koul, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020204/05/01 TSO Vay Sokunthea Project Type Irrigation 33,504,000
Prey Totueng 1 420 Canal 3.69 [ 3.88 ] Km 8,626,159 1.000 Depth (m) 7,569.000 Volume (m3) 33,504,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,504,000

Thma Koul, Anlong Run

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020205/05/01 TSO Vay Sokunthea Project Type Rural Transport 22,893,800
Kruos 1 202 Laterite road 1.10 [ 1.10 ] Km 8,334,243 3.000 Width (m) 0.000 Earth fill m3 9,167,667
Char 2 202 Laterite road 0.80 [ 0.80 ] Km 8,334,584 3.000 Width (m) 0.000 Earth fill m3 6,667,667
Souphi 3 202 Laterite road 0.79 [ 0.75 ] Km 9,449,084 3.000 Width (m) 0.000 Earth fill m3 7,058,466
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,893,800

Thma Koul, Chrouy Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020206/05/01 TSO Vay Sokunthea Project Type Irrigation 29,295,000
Chrouy Sdau 1 420 Canal 1.12 [ 1.12 ] Km 8,290,170 1.000 Depth (m) 2,194.000 Volume (m3) 9,276,700
Nikom Knong 2 420 Canal 1.12 [ 1.30 ] Km 8,288,272 1.000 Depth (m) 2,194.000 Volume (m3) 10,741,600
Nikom Krau 3 420 Canal 1.12 [ 1.12 ] Km 8,290,170 1.000 Depth (m) 2,194.000 Volume (m3) 9,276,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,295,000

Thma Koul, Boeng Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020207/05/01 TSO Vay Sokunthea Project Type Rural Transport 18,662,300
Boeng Pring 1 202 Laterite road 0.33 [ 0.33 ] Km 9,446,246 3.000 Width (m) 150.000 Earth fill m3 3,145,600
Ou Nhor 2 202 Laterite road 1.47 [ 1.51 ] Km 9,443,265 3.000 Width (m) 150.000 Earth fill m3 14,231,000
Boeng Pring 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,285,700 0.600 Diameter (m) 5.000 Length (m) 1,285,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,662,300
Contract ID 020207/05/02 TSO Vay Sokunthea Project Type Irrigation 12,261,800
Paoy Ta Sek 1 420 Canal 0.91 [ 0.96 ] Km 12,826,151 1.000 Depth (m) 2,725.000 Volume (m3) 12,261,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,261,800

Thma Koul, Kouk Khmum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020208/05/01 TSO Vay Sokunthea Project Type Rural Transport 30,255,300
Kien Kaes Pir 1 202 Laterite road 1.38 [ 1.38 ] Km 10,675,381 3.000 Width (m) 150.000 Earth fill m3 14,700,000
Chranieng 2 202 Laterite road 0.50 [ 0.50 ] Km 10,677,600 3.000 Width (m) 150.000 Earth fill m3 5,338,800
Kandal Cheung 3 202 Laterite road 0.60 [ 0.60 ] Km 10,666,666 3.000 Width (m) 150.000 Earth fill m3 6,400,000
Kouk Khmum 4 202 Laterite road 0.30 [ 0.36 ] Km 10,660,615 3.000 Width (m) 150.000 Earth fill m3 3,816,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,255,299

Thma Koul, Bansay Traeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020209/05/01 TSO Vay Sokunthea Project Type Irrigation 27,799,000
Thmei 1 420 Canal 1.40 [ 1.49 ] Km 16,699,663 1.000 Depth (m) 4,904.000 Volume (m3) 24,799,000
Thmei 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 1.000 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,799,000

Thma Koul, Rung Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020210/05/01 TSO Vay Sokunthea Project Type Rural Transport 14,971,200
Ballang Kraom 1 202 Laterite road 1.20 [ 1.23 ] Km 12,221,388 3.000 Width (m) 150.000 Earth fill m3 14,971,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,971,200
Contract ID 020210/05/02 TSO Vay Sokunthea Project Type Irrigation 15,679,200
Prakeab 1 420 Canal 0.53 [ 0.63 ] Km 9,275,014 1.000 Depth (m) 3,513.000 Volume (m3) 5,852,534
Preah Ponlea 2 420 Canal 0.53 [ 0.53 ] Km 9,270,440 1.000 Depth (m) 3,513.000 Volume (m3) 4,913,333
Tuol 3 420 Canal 0.53 [ 0.53 ] Km 9,270,440 1.000 Depth (m) 3,513.000 Volume (m3) 4,913,333
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,679,200

Battambang, Tuol Ta Aek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020301/05/01 TSO Keo Veasna Project Type Rural Transport 13,493,700
Tuol Ta Aek 1 202 Laterite road 0.62 [ 0.65 ] Km 12,512,986 3.000 Width (m) 0.000 Earth fill m3 8,108,415
Dangkao Teab 2 202 Laterite road 0.34 [ 0.34 ] Km 12,527,309 3.000 Width (m) 340.000 Earth fill m3 4,259,285
Dangkao Teab 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,126,000 0.600 Diameter (m) 5.000 Length (m) 1,126,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,493,700
Contract ID 020301/05/02 TSO Keo Veasna Project Type Urban Drainage and Flood Protection 20,445,100
Ou Ta Kam Muoy 1 420 Canal 0.89 [ 0.89 ] Km 3,217,568 1.000 Depth (m) 888.000 Volume (m3) 2,857,200
Ou Ta Kam Pir 2 420 Canal 1.00 [ 1.00 ] Km 3,217,582 1.000 Depth (m) 1,001.000 Volume (m3) 3,220,800
Ou Ta Kam Bei 3 420 Canal 0.43 [ 0.43 ] Km 3,217,442 1.000 Depth (m) 430.000 Volume (m3) 1,383,500
Tuol Ta Aek 4 420 Canal 0.82 [ 0.93 ] Km 3,217,584 1.000 Depth (m) 820.000 Volume (m3) 2,982,700
Ou Ta Kam Muoy 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,100,000 0.600 Diameter (m) 4.000 Length (m) 2,200,000
Ou Ta Kam Bei 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Tuol Ta Aek 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.600 Diameter (m) 5.000 Length (m) 1,900,000
Ou Ta Kam Pir 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Ou Ta Kam Pir 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 6.000 Length (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,444,200
Contract ID 020301/05/03 TSO Keo Veasna Project Type Urban Drainage and Flood Protection 1,670,000
Ou Ta Kam Pir 1 542 Foul water sewer 1.00 [ 1.00 ] Line 1,670,000 1.000 1.000 1,670,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,670,000

Battambang, Preaek Preah Sdach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020302/05/01 TSO Keo Veasna Project Type Rural Transport 32,719,000
Dabbei Meakkakra 1 202 Laterite road 0.49 [ 0.49 ] Km 19,367,140 3.000 Width (m) 1,085.000 Earth fill m3 9,548,000
Dabbei Meakkakra 2 202 Laterite road 0.32 [ 0.32 ] Km 12,914,465 3.000 Width (m) 89.000 Earth fill m3 4,106,800
Baek Chan Thmei 3 202 Laterite road 0.36 [ 0.36 ] Km 12,913,889 3.000 Width (m) 87.000 Earth fill m3 4,649,000
Chamkar Ruessei 4 202 Laterite road 0.55 [ 0.54 ] Km 12,914,471 3.000 Width (m) 344.000 Earth fill m3 6,960,900
Chamkar Ruessei 5 202 Laterite road 0.01 [ 0.09 ] Km 12,914,444 3.000 Width (m) 344.000 Earth fill m3 1,162,300
Dabbei Meakkakra 6 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,722,000 0.800 Diameter (m) 5.000 Length (m) 5,166,000
Chamkar Ruessei 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,126,000 0.600 Diameter (m) 5.000 Length (m) 1,126,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,719,000

Battambang, Rotanak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020303/05/01 TSO Keo Veasna Project Type Rural Transport 34,095,000
Rumchek Buon 1 202 Laterite road 1.38 [ 1.38 ] Km 14,574,128 4.000 Width (m) 453.000 Earth fill m3 20,054,000
Rotanak 4 202 Laterite road 0.14 [ 0.14 ] Km 10,280,172 3.000 Width (m) 453.000 Earth fill m3 1,387,823
Rumchek Buon 5 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,126,000 0.600 Diameter (m) 5.000 Length (m) 3,378,000
Souphi Muoy 6 202 Laterite road 0.43 [ 0.43 ] Km 10,281,824 3.000 Width (m) 453.000 Earth fill m3 4,369,775
Rumchek Pram 6 202 Laterite road 0.14 [ 0.24 ] Km 10,280,172 3.000 Width (m) 88.000 Earth fill m3 2,436,401
Rumchek Buon 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,469,000 1.000 Diameter (m) 5.000 Length (m) 2,469,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,094,999

Battambang, Chamkar Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020304/05/01 TSO Keo Veasna Project Type Rural Drainage and Flood Protection 30,520,900
Chamkar Samraong Muoy 1 420 Canal 0.13 [ 0.84 ] Km 19,067,086 1.200 Depth (m) 563.000 Volume (m3) 15,921,017
Voat Rumduol 4 420 Canal 1.20 [ 1.20 ] Km 5,898,943 1.000 Depth (m) 1,200.000 Volume (m3) 7,078,731
Phka Sla 5 420 Canal 0.86 [ 0.86 ] Km 5,898,943 1.000 Depth (m) 860.000 Volume (m3) 5,073,091
Voat Lieb 7 420 Canal 0.42 [ 0.42 ] Km 5,898,942 1.000 Depth (m) 415.000 Volume (m3) 2,448,061
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,520,900

Battambang, Sla Kaet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020305/05/01 TSO Keo Veasna Project Type Rural Transport 23,193,500
Chrey Kaong 1 202 Laterite road 0.50 [ 0.50 ] Km 15,055,254 3.000 Width (m) 344.000 Earth fill m3 7,527,627
Dam Spey 2 202 Laterite road 0.30 [ 0.30 ] Km 15,055,247 3.000 Width (m) 200.000 Earth fill m3 4,516,574
Chrey Kaong 3 202 Laterite road 0.66 [ 0.67 ] Km 15,058,307 4.000 Width (m) 87.000 Earth fill m3 10,149,299
Chrey Kaong 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,193,500

Battambang, Kdol Doun Teav

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020306/05/01 TSO Keo Veasna Project Type Irrigation 7,543,000
Ou Ta Nob 1 420 Canal 0.34 [ 0.35 ] Km 21,613,181 1.500 Depth (m) 1,341.000 Volume (m3) 7,543,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,543,000
Contract ID 020306/05/02 TSO Keo Veasna Project Type Rural Transport 18,550,000
Chong Preaek 1 202 Laterite road 1.00 [ 1.00 ] Km 13,690,036 3.000 Width (m) 934.000 Earth fill m3 13,621,586
Ou Ta Nob 2 202 Laterite road 0.36 [ 0.36 ] Km 13,690,036 3.000 Width (m) 0.000 Earth fill m3 4,928,413
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,549,999

Battambang, Ou Mal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020307/05/01 TSO Keo Veasna Project Type Irrigation 26,886,000
Ou Mal 1 420 Canal 1.00 [ 1.00 ] Km 15,873,000 0.450 Depth (m) 1,625.000 Volume (m3) 15,873,000
Sala Balat 2 420 Canal 0.47 [ 0.57 ] Km 15,895,945 1.300 Depth (m) 10,218.000 Volume (m3) 9,013,001
Sala Balat 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 1.000 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,886,001

Battambang, Voat Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020308/05/01 TSO Keo Veasna Project Type Irrigation 30,356,200
Chrab Krasang 1 420 Canal 3.90 [ 3.90 ] Km 6,534,487 0.500 Depth (m) 6,089.000 Volume (m3) 25,484,500
Ballang 2 420 Canal 0.24 [ 0.38 ] Km 12,991,200 0.500 Depth (m) 732.000 Volume (m3) 4,871,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,356,200

Battambang, Ou Char

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020309/05/01 TSO Keo Veasna Project Type Urban Drainage and Flood Protection 4,407,700
Ou Char 1 420 Canal 0.65 [ 0.66 ] Km 6,648,115 1.000 Depth (m) 969.000 Volume (m3) 4,407,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,407,700
Contract ID 020309/05/02 TSO Keo Veasna Project Type Rural Transport 13,700,000
Ang 1 201 Earth road 0.78 [ 0.78 ] Km 12,948,718 4.000 Width (m) 2,293.000 Earth fill m3 10,100,000
Ang 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,300,000 0.600 Diameter (m) 8.000 Length (m) 2,600,000
Ang 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,700,000
Contract ID 020309/05/03 TSO Keo Veasna Project Type Rural Transport 13,040,500
Ou Char 1 202 Laterite road 0.29 [ 0.32 ] Km 10,708,263 3.000 Width (m) 203.000 Earth fill m3 3,437,352
Anhchanh 2 202 Laterite road 0.30 [ 0.30 ] Km 10,737,128 3.000 Width (m) 203.000 Earth fill m3 3,178,190
Andoung Chenh 3 202 Laterite road 0.25 [ 0.25 ] Km 10,708,263 3.000 Width (m) 203.000 Earth fill m3 2,677,066
Kab Kou Thmei 4 202 Laterite road 0.35 [ 0.35 ] Km 10,708,263 3.000 Width (m) 203.000 Earth fill m3 3,747,892
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,040,500

Battambang, Svay Pao

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020310/05/01 TSO Keo Veasna Project Type Rural Transport 33,572,800
Mphey Osakphea 1 202 Laterite road 0.29 [ 0.29 ] Km 22,789,116 3.000 Width (m) 248.000 Earth fill m3 6,700,000
Preaek Moha Tep 2 202 Laterite road 0.85 [ 0.85 ] Km 14,954,353 4.000 Width (m) 248.000 Earth fill m3 12,711,200
Kammeakkar 3 202 Laterite road 0.90 [ 0.95 ] Km 14,954,337 4.000 Width (m) 248.000 Earth fill m3 14,161,757
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,572,957

Bavel, Bavel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020401/05/01 TSO Choeum Yon Project Type Rural Transport 8,300,000
Kampong Pnov 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 8,300,000 2.000 Total Span (m) 1.000 Width(m) 8,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,300,000
Contract ID 020401/05/02 TSO Choeum Yon Project Type Rural Transport 20,884,800
Kampong Pnov 1 201 Earth road 0.41 [ 0.41 ] Km 26,209,024 4.000 Width (m) 3,449.600 Earth fill m3 10,745,700
Stueng Dach 2 201 Earth road 0.93 [ 1.34 ] Km 7,593,125 4.000 Width (m) 1,971.600 Earth fill m3 10,139,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,884,800
Contract ID 020401/05/03 TSO Choeum Yon Project Type Rural Transport 15,417,300
Svay Chrum 1 202 Laterite road 1.00 [ 1.53 ] Km 10,070,085 3.000 Width (m) 0.000 Earth fill m3 15,417,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,417,300

Bavel, Khnach Romeas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020402/05/01 TSO Choeum Yon Project Type Rural Transport 9,749,700
Rung Ampil 1 201 Earth road 0.40 [ 0.80 ] Km 11,005,912 4.000 Width (m) 1,776.000 Earth fill m3 8,749,700
Rung Ampil 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,749,700
Contract ID 020402/05/02 TSO Choeum Yon Project Type Rural Transport 21,017,800
Ballang Leu 1 202 Laterite road 0.80 [ 0.80 ] Km 10,020,000 3.000 Width (m) 330.000 Earth fill m3 8,016,000
Prey Sangha 2 202 Laterite road 0.60 [ 0.60 ] Km 10,020,000 3.000 Width (m) 247.500 Earth fill m3 6,012,000
Kaoh Ream 3 202 Laterite road 0.33 [ 0.37 ] Km 10,008,696 3.000 Width (m) 134.060 Earth fill m3 3,683,200
Khnach Romeas 4 202 Laterite road 0.33 [ 0.33 ] Km 10,020,000 3.000 Width (m) 136.120 Earth fill m3 3,306,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,017,800

Bavel, Lvea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020403/05/01 TSO Choeum Yon Project Type Rural Transport 29,564,800
Lvea Chas 1 201 Earth road 2.65 [ 3.10 ] Km 6,588,000 4.000 Width (m) 4,919.700 Earth fill m3 20,422,800
Lvea Chas 2 211 Single pipe culvert 2.00 [ 5.00 ] Place 1,828,400 0.800 Diameter (m) 5.000 Length (m) 9,142,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,564,800

Bavel, Prey Khpos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020404/05/01 TSO Choeum Yon Project Type Rural Transport 30,409,000
Ta Mat 1 202 Laterite road 1.50 [ 1.50 ] Km 8,686,000 3.000 Width (m) 495.000 Earth fill m3 13,029,000
Dangkao Pen 3 202 Laterite road 0.63 [ 0.70 ] Km 8,685,021 3.000 Width (m) 232.000 Earth fill m3 6,088,200
Sranal 4 202 Laterite road 1.30 [ 1.30 ] Km 8,686,000 3.000 Width (m) 429.000 Earth fill m3 11,291,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,409,000

Bavel, Ampil Pram Daeum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020405/05/01 TSO Choeum Yon Project Type Irrigation 2,520,000
Ta Khiev 1 420 Canal 0.30 [ 0.30 ] Km 8,400,000 3.000 Depth (m) 850.500 Volume (m3) 2,520,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,520,000
Contract ID 020405/05/02 TSO Choeum Yon Project Type Rural Transport 22,022,900
Ta Khiev 1 201 Earth road 0.96 [ 1.16 ] Km 10,037,759 4.000 Width (m) 2,344.000 Earth fill m3 11,643,800
Doung 2 201 Earth road 0.50 [ 1.03 ] Km 10,037,814 4.000 Width (m) 1,933.800 Earth fill m3 10,379,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,022,900

Bavel, Kdol Tahen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020406/05/01 TSO Choeum Yon Project Type Rural Transport 6,874,900
Tuol Krasang 1 201 Earth road 0.40 [ 0.53 ] Km 11,001,685 4.000 Width (m) 1,062.000 Earth fill m3 5,874,900
Tuol Krasang 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,874,900
Contract ID 020406/06/02 TSO Choeum Yon Project Type Rural Transport 29,960,000
Toul Snal 1 202 Laterite road 2.00 [ 2.00 ] Km 7,365,000 3.000 Width (m) 825.000 Earth fill m3 14,730,000
Brab Hoeb 2 202 Laterite road 1.82 [ 1.82 ] Km 7,365,014 3.000 Width (m) 748.680 Earth fill m3 13,367,500
Brab Hoeb 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,250,000 0.600 Diameter (m) 5.000 Length (m) 1,250,000
Tomnob Takoun 4 202 Laterite road 0.08 [ 0.08 ] Km 7,379,518 3.000 Width (m) 0.000 Earth fill m3 612,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,960,000

Aek Phnum, Preaek Norint

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020501/05/01 TSO Mey Savuth Project Type Rural Transport 32,467,600
Sdei 1 202 Laterite road 0.28 [ 0.28 ] Km 10,125,357 3.000 Width (m) 1.500 Earth fill m3 2,835,100
Rohal Suong 2 202 Laterite road 1.65 [ 1.65 ] Km 10,125,273 3.000 Width (m) 1.500 Earth fill m3 16,706,700
Duong Mea 3 202 Laterite road 0.70 [ 0.70 ] Km 10,125,429 3.000 Width (m) 1.500 Earth fill m3 7,087,800
Ansang Sak 4 202 Laterite road 0.48 [ 0.58 ] Km 10,125,477 3.000 Width (m) 1.500 Earth fill m3 5,842,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,472,000

Aek Phnum, Samraong Knong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020502/05/01 TSO Mey Savuth Project Type Rural Transport 30,039,000
Samraong Snao 1 201 Earth road 0.60 [ 0.64 ] Km 28,676,516 4.000 Width (m) 4,199.000 Earth fill m3 18,439,000
Samraong Ou Trea 2 201 Earth road 0.46 [ 0.46 ] Km 15,217,391 4.000 Width (m) 1,649.000 Earth fill m3 7,000,000
Samraong Ou Trea 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,300,000 1.000 Diameter (m) 5.000 Length (m) 4,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,039,000

Aek Phnum, Preaek Khpob

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020503/05/01 TSO Mey Savuth Project Type Rural Transport 26,546,200
Ou Kambot 1 202 Laterite road 0.75 [ 0.75 ] Km 9,372,667 3.000 Width (m) 0.000 Earth fill m3 7,029,500
Khvet 2 202 Laterite road 1.90 [ 1.90 ] Km 9,372,737 3.000 Width (m) 0.000 Earth fill m3 17,808,200
Preaek Khpos 3 202 Laterite road 0.12 [ 0.18 ] Km 9,387,365 3.000 Width (m) 0.000 Earth fill m3 1,708,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,546,200

Aek Phnum, Preaek Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020504/05/01 TSO Mey Savuth Project Type Rural Transport 27,737,900
Bak Amraek 1 202 Laterite road 0.67 [ 0.67 ] Km 11,120,299 3.000 Width (m) 0.000 Earth fill m3 7,450,600
Bak Amraek 2 202 Laterite road 1.76 [ 1.82 ] Km 11,122,423 3.000 Width (m) 1.500 Earth fill m3 20,287,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,737,900

Aek Phnum, Peam Aek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020505/05/01 TSO Mey Savuth Project Type Irrigation 25,500,000
Doun Teav 1 442 Concrete weir with gates 1.00 [ 1.00 ] Place 23,180,000 9.500 Length (m) 4.500 Height (m) 23,180,000
Doun Teav 2 420 Canal 0.03 [ 0.03 ] Km 89,230,769 1.500 Depth (m) 400.000 Volume (m3) 2,320,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,500,000

Aek Phnum, Prey Chas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020506/05/01 TSO Mey Savuth Project Type Education 15,400,000
Anlong Sandan 1 310 Wooden school (general) 2.00 [ 2.00 ] School room 5,997,000 9.500 Length (m) 6.500 Width (m) 11,994,000
Anlong Sandan 2 740 School furniture 2.00 [ 2.00 ] School room 1,703,000 0.000 Students 0.000 3,406,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,400,000

Aek Phnum, Kaoh Chiveang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020507/05/01 TSO Mey Savuth Project Type Social Interventions 26,060,000
Preaek Toal 1 360 Community buildings 1.00 [ 1.00 ] Building 26,060,000 12.500 Length (m) 8.000 Width (m) 26,060,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,060,000

Moung Ruessei, Moung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020601/05/01 TSO Ma Sareun Project Type Rural Transport 30,848,900
Ou Krabau 1 201 Earth road 1.56 [ 1.68 ] Km 14,666,805 5.000 Width (m) 5,333.000 Earth fill m3 24,698,900
Ou Krabau 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Ou Krabau 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Ou Krabau 4 211 Single pipe culvert 2.00 [ 1.00 ] Place 1,150,000 0.600 Diameter (m) 5.000 Length (m) 1,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,848,900

Moung Ruessei, Kear

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020602/05/01 TSO Ma Sareun Project Type Irrigation 33,718,900
Pou Muoy 1 420 Canal 2.51 [ 2.56 ] Km 13,186,899 1.000 Depth (m) 7,569.000 Volume (m3) 33,718,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,718,900

Moung Ruessei, Prey Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020603/05/01 TSO Ma Sareun Project Type Rural Transport 33,048,600
Kalaom Phluk 1 201 Earth road 0.90 [ 0.90 ] Km 16,176,339 4.000 Width (m) 4,074.000 Earth fill m3 14,494,000
Kalaom Phluk 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.800 Diameter (m) 5.000 Length (m) 1,900,000
Kalaom Phluk 3 212 Double pipe culvert 2.00 [ 2.00 ] Place 3,100,000 0.800 Diameter (m) 5.000 Length (m) 6,200,000
Cham Ro'a 4 201 Earth road 0.53 [ 0.57 ] Km 16,172,408 4.000 Width (m) 1,209.000 Earth fill m3 9,202,100
Cham Ro'a 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,252,500 0.600 Diameter (m) 5.000 Length (m) 1,252,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,048,600

Moung Ruessei, Ruessei Krang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020604/05/01 TSO Ma Sareun Project Type Rural Transport 31,744,000
Tuol Snuol 1 201 Earth road 3.06 [ 2.71 ] Km 11,239,956 4.000 Width (m) 9,891.000 Earth fill m3 30,494,000
Tuol Snuol 3 211 Single pipe culvert 2.00 [ 1.00 ] Place 700,000 0.800 Diameter (m) 5.000 Length (m) 700,000
Tuol Snuol 4 211 Single pipe culvert 2.00 [ 1.00 ] Place 550,000 0.600 Diameter (m) 5.000 Length (m) 550,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,744,000

Moung Ruessei, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020605/05/01 TSO Ma Sareun Project Type Irrigation 28,874,000
Chrey Muoy 1 410 Earth dam 0.07 [ 0.07 ] Km 97,083,333 3.300 Max. height (m) 1,634.000 Volume (m3) 6,990,000
Chrey Pir 2 420 Canal 1.90 [ 1.96 ] Km 8,703,006 0.640 Depth (m) 3,722.000 Volume (m3) 17,084,000
Chrey Pir 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,800,000 0.800 Diameter (m) 10.000 Length (m) 4,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,874,000

Moung Ruessei, Ta Loas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020606/05/01 TSO Ma Sareun Project Type Irrigation 26,403,000
Chong Pralay 1 420 Canal 3.10 [ 3.10 ] Km 6,598,065 0.500 Depth (m) 4,556.000 Volume (m3) 20,454,000
Ma Naok 2 420 Canal 0.28 [ 0.36 ] Km 6,598,315 0.500 Depth (m) 405.000 Volume (m3) 2,349,000
Stueng Thmei 3 212 Double pipe culvert 2.00 [ 2.00 ] Place 1,800,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,403,000

Moung Ruessei, Kakaoh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020607/05/01 TSO Ly Oubol Project Type Rural Transport 30,478,900
Srae Ou 1 202 Laterite road 1.86 [ 1.90 ] Km 15,126,002 3.000 Width (m) 1.500 Earth fill m3 28,678,900
Srae Ou 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 900,000 0.600 Diameter (m) 5.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,478,900

Moung Ruessei, Prey Touch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020608/05/01 TSO Ly Oubol Project Type Irrigation 27,902,700
Dob Krasang 1 420 Canal 1.80 [ 1.91 ] Km 12,068,573 1.500 Depth (m) 4,793.000 Volume (m3) 23,002,700
Dob Krasang 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,030,000 0.800 Diameter (m) 5.000 Length (m) 3,030,000
Prean Nil 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,870,000 0.800 Diameter (m) 5.000 Length (m) 1,870,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,902,700

Moung Ruessei, Robas Mongkol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020609/05/01 TSO Ma Sareun Project Type Rural Transport 30,041,900
Koun K'aek Muoy 1 202 Laterite road 2.58 [ 2.63 ] Km 11,431,469 3.000 Width (m) 472.000 Earth fill m3 30,041,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,041,900

Moung Ruessei, Prek Chik

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020610/05/01 TSO Ma Sareun Project Type Irrigation 29,445,600
Prek Chik 1 420 Canal 1.99 [ 2.04 ] Km 13,424,448 0.800 Depth (m) 5,840.000 Volume (m3) 27,345,600
Khnach Ampor 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 5.000 Length (m) 2,100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,445,600

Moung Ruessei, Prey Tralach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020611/05/01 TSO Ma Sareun Project Type Rural Transport 40,986,800
Toul Svay 1 202 Laterite road 2.34 [ 2.84 ] Km 14,447,233 3.500 Width (m) 3,589.000 Earth fill m3 40,986,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,986,800

Rotonak Mondol, Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020701/05/01 TSO Hin Dara Project Type Rural Transport 16,507,000
Sdau 1 202 Laterite road 2.32 [ 2.32 ] Km 7,121,225 3.000 Width (m) 956.170 Earth fill m3 16,507,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,507,000
Contract ID 020701/05/02 TSO Hin Dara Project Type Rural Transport 15,464,000
O Khmum 1 201 Earth road 0.69 [ 0.77 ] Km 10,575,389 4.000 Width (m) 1,604.720 Earth fill m3 8,164,200
O Khmum 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
O Khmum 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
O Khmum 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,200,000 1.000 Diameter (m) 5.000 Length (m) 4,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,464,200

Rotonak Mondol, Andaeuk Haeb

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020702/05/01 TSO Hin Dara Project Type Rural Transport 23,271,400
Andaeuk Haeb 1 202 Laterite road 3.11 [ 3.17 ] Km 7,343,452 3.000 Width (m) 1,280.000 Earth fill m3 23,271,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,271,400

Rotonak Mondol, Phlov Meas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020703/05/01 TSO Hin Dara Project Type Rural Transport 22,039,500
Ou Lmun 1 201 Earth road 1.18 [ 1.24 ] Km 10,702,910 4.000 Width (m) 2,749.680 Earth fill m3 13,239,500
Ou Lmun 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Ou Lmun 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,900,000 0.600 Diameter (m) 5.000 Length (m) 1,900,000
Ou Lmun 4 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,900,000 0.800 Diameter (m) 5.000 Length (m) 5,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,039,500

Rotonak Mondol, Traeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020704/05/01 TSO Hin Dara Project Type Rural Domestic Water Supplies 25,103,000
Phcheav 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,059,200 33.000 Depth (m) 0.100 Diameter (mm) 5,059,200
Chi Sang 2 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,059,200 33.000 Depth (m) 0.100 Diameter (mm) 5,059,200
Svay Sa 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,059,200 33.000 Depth (m) 0.100 Diameter (mm) 5,059,200
Kilou 4 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,059,200 33.000 Depth (m) 0.100 Diameter (mm) 5,059,200
Ta Krok 5 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,866,200 33.000 Depth (m) 0.100 Diameter (mm) 4,866,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,103,000

Sangkae, Anlong Vil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020801/05/01 TSO Oum Naram Project Type Irrigation 26,400,000
Ou Muni Muoy 1 420 Canal 0.55 [ 0.55 ] Km 12,149,103 0.560 Depth (m) 2,102.000 Volume (m3) 6,682,006
Ou Muni Pir 2 420 Canal 1.62 [ 1.62 ] Km 12,149,103 0.600 Depth (m) 3,122.000 Volume (m3) 19,717,994
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,400,000
Contract ID 020801/05/02 TSO Oum Naram Project Type Rural Transport 12,057,000
Ou Muni Muoy 1 202 Laterite road 0.77 [ 0.85 ] Km 14,150,259 4.000 Width (m) 1.500 Earth fill m3 12,057,436
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,057,436

Sangkae, Norea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020802/05/01 TSO Oum Naram Project Type Rural Transport 22,760,000
Balat 1 202 Laterite road 0.50 [ 0.21 ] Km 10,000,000 3.000 Width (m) 150.000 Earth fill m3 2,090,000
Ta Kok 3 202 Laterite road 1.06 [ 1.06 ] Km 14,566,038 4.000 Width (m) 150.000 Earth fill m3 15,440,000
Ta Kok 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 5,230,000 1.000 Diameter (m) 0.800 Length (m) 5,230,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,760,000

Sangkae, Ta Pon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020803/05/01 TSO Oum Naram Project Type Rural Transport 30,319,350
Svay Sa 1 202 Laterite road 2.25 [ 2.31 ] Km 11,252,152 3.000 Width (m) 150.000 Earth fill m3 25,969,966
Svay Sa 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,560,000 0.800 Diameter (m) 5.000 Length (m) 2,560,000
Svay Sa 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,790,000 1.000 Diameter (m) 5.000 Length (m) 1,790,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,319,966

Sangkae, Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020804/05/01 TSO Oum Naram Project Type Rural Transport 26,205,300
Ta Haen Pir 1 202 Laterite road 1.40 [ 1.40 ] Km 11,042,857 3.000 Width (m) 150.000 Earth fill m3 15,460,000
Ta Haen Muoy 2 202 Laterite road 0.55 [ 0.60 ] Km 10,909,457 3.000 Width (m) 150.000 Earth fill m3 6,505,309
Ta Haen Pir 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,100,000 0.600 Diameter (m) 5.000 Length (m) 1,100,000
Ta Haen Pir 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,140,000 0.800 Diameter (m) 7.000 Length (m) 3,140,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,205,309

Sangkae, Kampong Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020805/05/01 TSO Oum Naram Project Type Irrigation 27,058,100
Andoung Trach 1 410 Earth dam 0.96 [ 1.19 ] Km 18,394,595 0.950 Max. height (m) 4,908.000 Volume (m3) 21,839,902
Andoung Trach 2 452 Single pipe Culvert with gate 1.00 [ 2.00 ] Place 2,609,100 0.800 Diameter (m) 5.000 Width (m) 5,218,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,058,102

Sangkae, Kampong Preang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020806/05/01 TSO Oum Naram Project Type Education 20,930,000
Sala Trav 1 321 Brick school with tile roof 1.00 [ 1.00 ] School room 20,000,000 8.000 Length (m) 9.000 Width (m) 20,000,000
Sala Trav 2 740 School furniture 1.00 [ 1.00 ] School room 930,000 40.000 Students 0.000 930,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,930,000

Sangkae, Reang Kesei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020807/05/01 TSO Oum Naram Project Type Rural Transport 24,573,800
Tuol Snuol 1 202 Laterite road 1.72 [ 1.76 ] Km 12,452,306 3.000 Width (m) 150.000 Earth fill m3 21,873,720
Tuol Snuol 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,700,000 1.000 Diameter (m) 5.000 Length (m) 2,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,573,720

Sangkae, Ou Dambang Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020808/05/01 TSO Oum Naram Project Type Rural Transport 32,983,600
Baoh Pou 1 202 Laterite road 0.67 [ 0.67 ] Km 11,127,820 3.000 Width (m) 150.000 Earth fill m3 7,400,000
Ou Khcheay 2 202 Laterite road 1.20 [ 1.20 ] Km 11,166,667 3.000 Width (m) 150.000 Earth fill m3 13,400,000
Ou Sralau 3 202 Laterite road 0.61 [ 0.63 ] Km 11,111,111 3.000 Width (m) 150.000 Earth fill m3 6,966,667
Ou Khcheay 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,739,000 0.800 Diameter (m) 6.000 Length (m) 5,217,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,983,667

Sangkae, Ou Dambang Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020809/09/01 TSO Oum Naram Project Type Rural Transport 30,045,100
Dambouk Khpos 1 201 Earth road 1.43 [ 2.10 ] Km 11,169,522 4.000 Width (m) 4,516.000 Earth fill m3 23,506,258
Dambouk Khpos 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,329,075 0.600 Diameter (m) 5.000 Length (m) 1,329,075
Dambouk Khpos 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 868,950 0.800 Diameter (m) 5.000 Length (m) 868,950
Dambouk Khpos 4 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,170,425 0.800 Diameter (m) 5.000 Length (m) 4,340,850
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,045,133

Sangkae, Voat Ta Muem

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020810/05/01 TSO Oum Naram Project Type Irrigation 26,492,200
Anlong Lvea 1 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 22,992,200 1.000 Diameter (m) 5.000 Width (m) 22,992,200
Anlong Lvea 2 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 3,500,000 0.600 Diameter (m) 5.000 Width (m) 3,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,492,200

Samlout, Ou Samrel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020902/05/01 TSO Chea Tem Project Type Rural Transport 18,768,700
Ou Rumchek Kraom 1 201 Earth road 0.50 [ 0.50 ] Km 10,390,000 4.000 Width (m) 6,250.000 Earth fill m3 5,195,000
Ou Rumchek Leu 2 201 Earth road 0.81 [ 0.85 ] Km 10,390,000 4.000 Width (m) 6,250.000 Earth fill m3 8,873,060
Ou Rumchek Kraom 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,292,000 0.600 Diameter (m) 5.000 Length (m) 2,584,000
Ou Rumchek Leu 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,117,000 0.800 Diameter (m) 5.000 Length (m) 2,117,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,769,060

Samlout, Mean Cheay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020904/05/01 TSO Chea Tem Project Type Rural Domestic Water Supplies 17,800,000
Sre Chi Pao 1 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Ta Non 2 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Sre Sdao 3 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Kampong Touk 4 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Kam Chat 5 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,800,000

Samlout, Samlout

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020905/05/01 TSO Chea Tem Project Type Rural Transport 21,665,000
Ou Chrab 1 202 Laterite road 0.95 [ 0.95 ] Km 9,786,404 3.500 Width (m) 0.000 Earth fill m3 9,306,870
Bueng Run 2 202 Laterite road 1.00 [ 1.05 ] Km 9,790,000 3.500 Width (m) 0.000 Earth fill m3 10,250,130
Bueng Run 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,108,000 0.800 Diameter (m) 5.000 Length (m) 2,108,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,665,000

Samlout, Sung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020906/05/01 TSO Chea Tem Project Type Rural Transport 20,157,100
Kandal 1 202 Laterite road 0.50 [ 0.50 ] Km 9,790,000 3.500 Width (m) 0.000 Earth fill m3 4,895,000
Shuong Pir 2 202 Laterite road 0.50 [ 0.50 ] Km 9,790,000 3.500 Width (m) 0.000 Earth fill m3 4,895,000
Kanh Chaang 3 202 Laterite road 0.67 [ 0.71 ] Km 9,790,000 3.500 Width (m) 0.000 Earth fill m3 6,970,480
Kandal 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,293,000 0.600 Diameter (m) 5.000 Length (m) 1,293,000
Kanh Chaang 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,104,000 0.800 Diameter (m) 5.000 Length (m) 2,104,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,157,480

Samlout, Ta Sanh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020907/05/01 TSO Chea Tem Project Type Rural Transport 21,988,400
Ou Sngout 1 201 Earth road 0.50 [ 0.50 ] Km 10,320,000 4.000 Width (m) 6,250.000 Earth fill m3 5,160,000
Ou Tontim 2 201 Earth road 1.26 [ 1.33 ] Km 10,322,105 4.000 Width (m) 6,250.000 Earth fill m3 13,728,400
Ou Tontim 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,320,000 0.600 Diameter (m) 5.000 Length (m) 1,320,000
Ou Tontim 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,780,000 0.800 Diameter (m) 5.000 Length (m) 1,780,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,988,400

Sampov Lun, Sampou Lun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021001/05/01 TSO Hor Hak Project Type Rural Transport 16,589,600
Tuol Chrey 1 203 Gravel road 0.45 [ 0.45 ] Km 13,930,000 4.000 Width (m) 776.500 Earth fill m3 6,268,500
Tuol Chrey 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,198,000 0.600 Diameter (m) 5.000 Length (m) 2,396,000
Thnal Bambaek 3 203 Gravel road 0.40 [ 0.42 ] Km 13,938,915 4.000 Width (m) 920.000 Earth fill m3 5,910,100
Thnal Bambaek 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,015,000 0.600 Diameter (m) 5.000 Length (m) 2,015,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,589,600

Sampov Lun, Angkor Ban

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021002/05/01 TSO Hor Hak Project Type Rural Transport 16,676,200
Pralay Prak 1 203 Gravel road 0.40 [ 0.40 ] Km 15,040,000 4.000 Width (m) 648.000 Earth fill m3 6,016,000
Pralay Prak 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,198,000 0.600 Diameter (m) 5.000 Length (m) 1,198,000
Pralay Prak 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,015,000 0.600 Diameter (m) 5.000 Length (m) 2,015,000
Kbal Hong 4 203 Gravel road 0.31 [ 0.34 ] Km 15,033,333 4.000 Width (m) 547.000 Earth fill m3 5,051,200
Kbal Hong 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,198,000 0.600 Diameter (m) 5.000 Length (m) 2,396,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,676,200

Sampov Lun, Ta Sda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021003/05/01 TSO Hor Hak Project Type Rural Transport 18,050,600
Veal Vong 1 203 Gravel road 0.94 [ 0.96 ] Km 14,565,073 4.000 Width (m) 1,489.000 Earth fill m3 14,011,600
Veal Vong 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,415,000 0.600 Diameter (m) 7.000 Length (m) 1,415,000
Veal Vong 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,312,000 0.600 Diameter (m) 5.000 Length (m) 2,624,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,050,600

Sampov Lun, Santepheap

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021004/05/01 TSO Hor Hak Project Type Rural Transport 19,387,100
Trapeang Prolit 1 203 Gravel road 1.34 [ 1.37 ] Km 12,381,200 4.000 Width (m) 1,752.000 Earth fill m3 16,925,100
Trapeang Prolit 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,283,000 0.600 Diameter (m) 5.000 Length (m) 1,283,000
Trapeang Prolit 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,179,000 0.600 Diameter (m) 7.000 Length (m) 1,179,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,387,100

Sampov Lun, Serei Maen Cheay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021005/05/01 TSO Hor Hak Project Type Rural Transport 19,660,700
Chheu Teal 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,046,900 0.600 Diameter (m) 5.000 Length (m) 2,046,900
Chheu Teal 3 203 Gravel road 1.17 [ 1.20 ] Km 12,649,833 4.000 Width (m) 2,158.000 Earth fill m3 15,179,800
Chheu Teal 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,217,000 0.600 Diameter (m) 5.000 Length (m) 2,434,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,660,700

Sampov Lun, Chrey Sema

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021006/05/01 TSO Hor Hak Project Type Rural Transport 18,307,700
Spean Youl 1 203 Gravel road 0.96 [ 1.00 ] Km 13,044,925 4.000 Width (m) 1,860.000 Earth fill m3 12,979,700
Ou Lvea 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,274,000 0.600 Diameter (m) 5.000 Length (m) 1,274,000
Ou Lvea 3 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,027,000 0.600 Diameter (m) 5.000 Length (m) 4,054,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,307,700

Phnum Proek, Phnum Proek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021101/05/01 TSO Hul Sina Project Type Rural Transport 18,957,000
Phnum Proek 1 203 Gravel road 1.38 [ 1.41 ] Km 12,111,869 4.000 Width (m) 2,641.000 Earth fill m3 17,041,400
Phnum Proek 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,915,600 0.800 Diameter (m) 5.000 Length (m) 1,915,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,957,000

Phnum Proek, Pech Chenda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021102/05/01 TSO Hul Sina Project Type Rural Transport 29,752,600
Ou 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 29,752,600 6.000 4.000 29,752,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,752,600

Phnum Proek, Chakrei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021103/05/01 TSO Hul Sina Project Type Rural Transport 31,555,900
Tuol 1 203 Gravel road 1.90 [ 1.95 ] Km 14,090,000 4.000 Width (m) 4,044.000 Earth fill m3 27,475,500
Tuol 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,040,200 0.800 Diameter (m) 5.000 Length (m) 4,080,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,555,900

Phnum Proek, Barang Thleak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021104/05/01 TSO Hul Sina Project Type Rural Transport 11,202,600
Barang Thleak 1 203 Gravel road 0.77 [ 0.80 ] Km 14,055,960 4.000 Width (m) 3,167.000 Earth fill m3 11,202,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,202,600
Contract ID 021104/05/02 TSO Hul Sina Project Type Rural Transport 8,150,000
Khvav 1 220 Box culvert (general) 1.00 [ 1.00 ] Place 8,150,000 2.000 Total Span (m) 5.000 Width(m) 8,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,150,000

Phnum Proek, Ou Rumduol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021105/05/01 TSO Hul Sina Project Type Rural Transport 20,739,500
Oulahong 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 20,739,500 21.000 3.500 20,739,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,739,500

Kamrieng, Kamrieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021201/05/01 TSO Mout Roun Project Type Rural Transport 22,076,000
Ouchrey 1 203 Gravel road 0.66 [ 0.69 ] Km 13,017,366 4.000 Width (m) 952.650 Earth fill m3 8,995,000
Rokabos 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,269,000 0.600 Diameter (m) 5.000 Length (m) 1,269,000
Ouchrey 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,269,000 0.600 Diameter (m) 5.000 Length (m) 1,269,000
Rokabos 5 203 Gravel road 0.66 [ 0.66 ] Km 13,108,232 4.000 Width (m) 904.400 Earth fill m3 8,599,000
Ouchrey 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,944,000 0.800 Diameter (m) 5.000 Length (m) 1,944,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,076,000

Kamrieng, Boeng Reang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021202/05/01 TSO Mout Roun Project Type Rural Transport 22,239,200
Ou Krouch 1 203 Gravel road 1.50 [ 1.50 ] Km 9,382,000 4.000 Width (m) 180.000 Earth fill m3 14,073,000
Doung 2 203 Gravel road 0.60 [ 0.66 ] Km 9,373,633 4.000 Width (m) 180.000 Earth fill m3 6,186,598
Svay 3 203 Gravel road 0.21 [ 0.21 ] Km 9,382,000 4.000 Width (m) 172.400 Earth fill m3 1,979,602
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,239,200

Kamrieng, Ou Da

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021203/05/01 TSO Mout Roun Project Type Rural Transport 22,785,700
Ou Da 1 201 Earth road 1.00 [ 1.00 ] Km 7,678,000 4.000 Width (m) 1,855.850 Earth fill m3 7,678,000
Kandal 2 201 Earth road 0.44 [ 0.52 ] Km 7,682,819 4.000 Width (m) 798.640 Earth fill m3 3,979,700
Svay Chrum 3 201 Earth road 1.00 [ 1.00 ] Km 7,678,000 4.000 Width (m) 1,855.850 Earth fill m3 7,678,000
Ou Da 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,150,000 0.600 Diameter (m) 5.000 Length (m) 1,150,000
Kandal 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,150,000 0.600 Diameter (m) 5.000 Length (m) 1,150,000
Svay Chrum 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,150,000 0.600 Diameter (m) 5.000 Length (m) 1,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,785,700

Kamrieng, Trang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021204/05/01 TSO Mout Roun Project Type Rural Transport 20,888,000
Phnommoyrouy 1 201 Earth road 2.65 [ 2.74 ] Km 7,637,294 4.000 Width (m) 4,835.000 Earth fill m3 20,888,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,888,000

Kamrieng, Ta Saen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021205/05/01 TSO Mout Roun Project Type Rural Transport 20,818,000
Ou Toek Thla 1 201 Earth road 2.67 [ 2.78 ] Km 7,025,765 4.000 Width (m) 4,705.000 Earth fill m3 19,524,600
Ou Toek Thla 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,293,400 0.600 Diameter (m) 5.000 Length (m) 1,293,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,818,000

Kamrieng, Ta Krai

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021206/05/01 TSO Mout Roun Project Type Rural Transport 7,767,000
Kampong Chamlong Krom 1 201 Earth road 1.00 [ 1.00 ] Km 7,767,000 4.000 Width (m) 1,862.000 Earth fill m3 7,767,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,767,000
Contract ID 021206/05/02 TSO Mout Roun Project Type Rural Transport 17,066,000
Kam Prang 1 203 Gravel road 1.05 [ 1.05 ] Km 9,507,500 3.500 Width (m) 0.000 Earth fill m3 9,982,875
Sras Toeuk Thmey 2 203 Gravel road 0.68 [ 0.75 ] Km 9,507,500 3.500 Width (m) 0.000 Earth fill m3 7,083,088
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,065,963

Koas Krala, Thipakdei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021301/05/01 TSO Ly Oubol Project Type Rural Domestic Water Supplies 26,075,000
Kouk Poun 1 141 Pond with no filter 1.00 [ 1.00 ] Place 8,691,700 3.000 Depth (m) 2,484.000 Volume (m3) 8,691,700
Ta Thok 2 141 Pond with no filter 1.00 [ 1.00 ] Place 8,691,700 3.000 Depth (m) 2,484.000 Volume (m3) 8,691,700
Samraog 3 141 Pond with no filter 1.00 [ 1.00 ] Place 8,691,600 3.000 Depth (m) 2,484.000 Volume (m3) 8,691,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,075,000

Koas Krala, Koas Krala

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021302/05/01 TSO Ly Oubol Project Type Rural Domestic Water Supplies 9,000,000
Damnak Kakaoh 1 141 Pond with no filter 1.00 [ 1.00 ] Place 9,000,000 3.000 Depth (m) 2,484.000 Volume (m3) 9,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,000,000
Contract ID 021302/05/02 TSO Ly Oubol Project Type Rural Transport 11,741,500
Voat 1 202 Laterite road 0.68 [ 0.79 ] Km 7,314,013 3.000 Width (m) 1.500 Earth fill m3 5,741,500
Voat 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Toul Ta Muem 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Thmei 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Tuol Balangk 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Prey Popel 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,741,500

Koas Krala, Hab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021303/05/01 TSO Ly Oubol Project Type Rural Transport 19,711,500
Kouk Trom 1 201 Earth road 1.07 [ 1.32 ] Km 14,978,343 4.000 Width (m) 150.000 Earth fill m3 19,711,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,711,500

Koas Krala, Doun Ba

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021304/05/01 TSO Ly Oubol Project Type Rural Transport 20,678,600
Kouk Roka 1 202 Laterite road 1.97 [ 1.98 ] Km 8,204,940 3.000 Width (m) 1.500 Earth fill m3 16,278,600
Doun Ba 2 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,600,000 0.800 Diameter (m) 5.000 Length (m) 3,200,000
Prey Phnheas 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,678,600

Koas Krala, Preah Phos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021305/05/01 TSO Ly Oubol Project Type Rural Transport 19,522,700
Kab Prich 1 202 Laterite road 1.76 [ 1.81 ] Km 8,184,815 3.000 Width (m) 150.000 Earth fill m3 14,822,700
Kab Prich 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Kab Prich 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.800 Diameter (m) 5.000 Length (m) 1,700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,522,700

Koas Krala, Chhnal Moan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 021306/05/01 TSO Ly Oubol Project Type Rural Transport 19,023,750
Prey Sen 1 201 Earth road 0.90 [ 1.35 ] Km 13,331,176 4.000 Width (m) 3,650.000 Earth fill m3 18,023,750
Chnal Mean 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,023,750