Contract Outputs

Location: Battambang \ Samlout Budget Year: 2005

Banan    Thma Koul    Battambang    Bavel    Aek Phnum    Moung Ruessei    Rotonak Mondol    Sangkae    Samlout    Sampov Lun    Phnum Proek    Kamrieng    Koas Krala   

Samlout, Ou Samrel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020902/05/01 TSO Chea Tem Project Type Rural Transport 18,768,700
Ou Rumchek Kraom 1 201 Earth road 0.50 [ 0.50 ] Km 10,390,000 4.000 Width (m) 6,250.000 Earth fill m3 5,195,000
Ou Rumchek Leu 2 201 Earth road 0.81 [ 0.85 ] Km 10,390,000 4.000 Width (m) 6,250.000 Earth fill m3 8,873,060
Ou Rumchek Kraom 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,292,000 0.600 Diameter (m) 5.000 Length (m) 2,584,000
Ou Rumchek Leu 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,117,000 0.800 Diameter (m) 5.000 Length (m) 2,117,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,769,060

Samlout, Mean Cheay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020904/05/01 TSO Chea Tem Project Type Rural Domestic Water Supplies 17,800,000
Sre Chi Pao 1 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Ta Non 2 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Sre Sdao 3 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Kampong Touk 4 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Kam Chat 5 141 Pond with no filter 1.00 [ 1.00 ] Place 3,560,000 3.000 Depth (m) 741.000 Volume (m3) 3,560,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,800,000

Samlout, Samlout

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020905/05/01 TSO Chea Tem Project Type Rural Transport 21,665,000
Ou Chrab 1 202 Laterite road 0.95 [ 0.95 ] Km 9,786,404 3.500 Width (m) 0.000 Earth fill m3 9,306,870
Bueng Run 2 202 Laterite road 1.00 [ 1.05 ] Km 9,790,000 3.500 Width (m) 0.000 Earth fill m3 10,250,130
Bueng Run 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,108,000 0.800 Diameter (m) 5.000 Length (m) 2,108,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,665,000

Samlout, Sung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020906/05/01 TSO Chea Tem Project Type Rural Transport 20,157,100
Kandal 1 202 Laterite road 0.50 [ 0.50 ] Km 9,790,000 3.500 Width (m) 0.000 Earth fill m3 4,895,000
Shuong Pir 2 202 Laterite road 0.50 [ 0.50 ] Km 9,790,000 3.500 Width (m) 0.000 Earth fill m3 4,895,000
Kanh Chaang 3 202 Laterite road 0.67 [ 0.71 ] Km 9,790,000 3.500 Width (m) 0.000 Earth fill m3 6,970,480
Kandal 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,293,000 0.600 Diameter (m) 5.000 Length (m) 1,293,000
Kanh Chaang 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,104,000 0.800 Diameter (m) 5.000 Length (m) 2,104,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,157,480

Samlout, Ta Sanh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 020907/05/01 TSO Chea Tem Project Type Rural Transport 21,988,400
Ou Sngout 1 201 Earth road 0.50 [ 0.50 ] Km 10,320,000 4.000 Width (m) 6,250.000 Earth fill m3 5,160,000
Ou Tontim 2 201 Earth road 1.26 [ 1.33 ] Km 10,322,105 4.000 Width (m) 6,250.000 Earth fill m3 13,728,400
Ou Tontim 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,320,000 0.600 Diameter (m) 5.000 Length (m) 1,320,000
Ou Tontim 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,780,000 0.800 Diameter (m) 5.000 Length (m) 1,780,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,988,400