Contract Outputs
Location: Battambang \ Battambang Budget Year: 2005
Banan
Thma Koul
Battambang
Bavel
Aek Phnum
Moung Ruessei
Rotonak Mondol
Sangkae
Samlout
Sampov Lun
Phnum Proek
Kamrieng
Koas Krala
Battambang, Tuol Ta Aek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020301/05/01 |
TSO |
Keo Veasna |
Project Type |
Rural Transport |
13,493,700 |
| Tuol Ta Aek |
1 |
202 |
Laterite road |
0.62 [ 0.65 ] |
Km |
12,512,986 |
3.000 Width (m) |
0.000 Earth fill m3 |
8,108,415 |
| Dangkao Teab |
2 |
202 |
Laterite road |
0.34 [ 0.34 ] |
Km |
12,527,309 |
3.000 Width (m) |
340.000 Earth fill m3 |
4,259,285 |
| Dangkao Teab |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,126,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,126,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,493,700 |
| Contract ID |
020301/05/02 |
TSO |
Keo Veasna |
Project Type |
Urban Drainage and Flood Protection |
20,445,100 |
| Ou Ta Kam Muoy |
1 |
420 |
Canal |
0.89 [ 0.89 ] |
Km |
3,217,568 |
1.000 Depth (m) |
888.000 Volume (m3) |
2,857,200 |
| Ou Ta Kam Pir |
2 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
3,217,582 |
1.000 Depth (m) |
1,001.000 Volume (m3) |
3,220,800 |
| Ou Ta Kam Bei |
3 |
420 |
Canal |
0.43 [ 0.43 ] |
Km |
3,217,442 |
1.000 Depth (m) |
430.000 Volume (m3) |
1,383,500 |
| Tuol Ta Aek |
4 |
420 |
Canal |
0.82 [ 0.93 ] |
Km |
3,217,584 |
1.000 Depth (m) |
820.000 Volume (m3) |
2,982,700 |
| Ou Ta Kam Muoy |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,200,000 |
| Ou Ta Kam Bei |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Tuol Ta Aek |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,900,000 |
| Ou Ta Kam Pir |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Ou Ta Kam Pir |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,700,000 |
0.800 Diameter (m) |
6.000 Length (m) |
1,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,444,200 |
| Contract ID |
020301/05/03 |
TSO |
Keo Veasna |
Project Type |
Urban Drainage and Flood Protection |
1,670,000 |
| Ou Ta Kam Pir |
1 |
542 |
Foul water sewer |
1.00 [ 1.00 ] |
Line |
1,670,000 |
1.000 |
1.000 |
1,670,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,670,000 |
Battambang, Preaek Preah Sdach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020302/05/01 |
TSO |
Keo Veasna |
Project Type |
Rural Transport |
32,719,000 |
| Dabbei Meakkakra |
1 |
202 |
Laterite road |
0.49 [ 0.49 ] |
Km |
19,367,140 |
3.000 Width (m) |
1,085.000 Earth fill m3 |
9,548,000 |
| Dabbei Meakkakra |
2 |
202 |
Laterite road |
0.32 [ 0.32 ] |
Km |
12,914,465 |
3.000 Width (m) |
89.000 Earth fill m3 |
4,106,800 |
| Baek Chan Thmei |
3 |
202 |
Laterite road |
0.36 [ 0.36 ] |
Km |
12,913,889 |
3.000 Width (m) |
87.000 Earth fill m3 |
4,649,000 |
| Chamkar Ruessei |
4 |
202 |
Laterite road |
0.55 [ 0.54 ] |
Km |
12,914,471 |
3.000 Width (m) |
344.000 Earth fill m3 |
6,960,900 |
| Chamkar Ruessei |
5 |
202 |
Laterite road |
0.01 [ 0.09 ] |
Km |
12,914,444 |
3.000 Width (m) |
344.000 Earth fill m3 |
1,162,300 |
| Dabbei Meakkakra |
6 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,722,000 |
0.800 Diameter (m) |
5.000 Length (m) |
5,166,000 |
| Chamkar Ruessei |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,126,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,126,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,719,000 |
Battambang, Rotanak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020303/05/01 |
TSO |
Keo Veasna |
Project Type |
Rural Transport |
34,095,000 |
| Rumchek Buon |
1 |
202 |
Laterite road |
1.38 [ 1.38 ] |
Km |
14,574,128 |
4.000 Width (m) |
453.000 Earth fill m3 |
20,054,000 |
| Rotanak |
4 |
202 |
Laterite road |
0.14 [ 0.14 ] |
Km |
10,280,172 |
3.000 Width (m) |
453.000 Earth fill m3 |
1,387,823 |
| Rumchek Buon |
5 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,126,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,378,000 |
| Souphi Muoy |
6 |
202 |
Laterite road |
0.43 [ 0.43 ] |
Km |
10,281,824 |
3.000 Width (m) |
453.000 Earth fill m3 |
4,369,775 |
| Rumchek Pram |
6 |
202 |
Laterite road |
0.14 [ 0.24 ] |
Km |
10,280,172 |
3.000 Width (m) |
88.000 Earth fill m3 |
2,436,401 |
| Rumchek Buon |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,469,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,469,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,094,999 |
Battambang, Chamkar Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020304/05/01 |
TSO |
Keo Veasna |
Project Type |
Rural Drainage and Flood Protection |
30,520,900 |
| Chamkar Samraong Muoy |
1 |
420 |
Canal |
0.13 [ 0.84 ] |
Km |
19,067,086 |
1.200 Depth (m) |
563.000 Volume (m3) |
15,921,017 |
| Voat Rumduol |
4 |
420 |
Canal |
1.20 [ 1.20 ] |
Km |
5,898,943 |
1.000 Depth (m) |
1,200.000 Volume (m3) |
7,078,731 |
| Phka Sla |
5 |
420 |
Canal |
0.86 [ 0.86 ] |
Km |
5,898,943 |
1.000 Depth (m) |
860.000 Volume (m3) |
5,073,091 |
| Voat Lieb |
7 |
420 |
Canal |
0.42 [ 0.42 ] |
Km |
5,898,942 |
1.000 Depth (m) |
415.000 Volume (m3) |
2,448,061 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,520,900 |
Battambang, Sla Kaet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020305/05/01 |
TSO |
Keo Veasna |
Project Type |
Rural Transport |
23,193,500 |
| Chrey Kaong |
1 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
15,055,254 |
3.000 Width (m) |
344.000 Earth fill m3 |
7,527,627 |
| Dam Spey |
2 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
15,055,247 |
3.000 Width (m) |
200.000 Earth fill m3 |
4,516,574 |
| Chrey Kaong |
3 |
202 |
Laterite road |
0.66 [ 0.67 ] |
Km |
15,058,307 |
4.000 Width (m) |
87.000 Earth fill m3 |
10,149,299 |
| Chrey Kaong |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,193,500 |
Battambang, Kdol Doun Teav
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020306/05/01 |
TSO |
Keo Veasna |
Project Type |
Irrigation |
7,543,000 |
| Ou Ta Nob |
1 |
420 |
Canal |
0.34 [ 0.35 ] |
Km |
21,613,181 |
1.500 Depth (m) |
1,341.000 Volume (m3) |
7,543,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,543,000 |
| Contract ID |
020306/05/02 |
TSO |
Keo Veasna |
Project Type |
Rural Transport |
18,550,000 |
| Chong Preaek |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
13,690,036 |
3.000 Width (m) |
934.000 Earth fill m3 |
13,621,586 |
| Ou Ta Nob |
2 |
202 |
Laterite road |
0.36 [ 0.36 ] |
Km |
13,690,036 |
3.000 Width (m) |
0.000 Earth fill m3 |
4,928,413 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,549,999 |
Battambang, Ou Mal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020307/05/01 |
TSO |
Keo Veasna |
Project Type |
Irrigation |
26,886,000 |
| Ou Mal |
1 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
15,873,000 |
0.450 Depth (m) |
1,625.000 Volume (m3) |
15,873,000 |
| Sala Balat |
2 |
420 |
Canal |
0.47 [ 0.57 ] |
Km |
15,895,945 |
1.300 Depth (m) |
10,218.000 Volume (m3) |
9,013,001 |
| Sala Balat |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,886,001 |
Battambang, Voat Kor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020308/05/01 |
TSO |
Keo Veasna |
Project Type |
Irrigation |
30,356,200 |
| Chrab Krasang |
1 |
420 |
Canal |
3.90 [ 3.90 ] |
Km |
6,534,487 |
0.500 Depth (m) |
6,089.000 Volume (m3) |
25,484,500 |
| Ballang |
2 |
420 |
Canal |
0.24 [ 0.38 ] |
Km |
12,991,200 |
0.500 Depth (m) |
732.000 Volume (m3) |
4,871,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,356,200 |
Battambang, Ou Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020309/05/01 |
TSO |
Keo Veasna |
Project Type |
Urban Drainage and Flood Protection |
4,407,700 |
| Ou Char |
1 |
420 |
Canal |
0.65 [ 0.66 ] |
Km |
6,648,115 |
1.000 Depth (m) |
969.000 Volume (m3) |
4,407,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,407,700 |
| Contract ID |
020309/05/02 |
TSO |
Keo Veasna |
Project Type |
Rural Transport |
13,700,000 |
| Ang |
1 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
12,948,718 |
4.000 Width (m) |
2,293.000 Earth fill m3 |
10,100,000 |
| Ang |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
8.000 Length (m) |
2,600,000 |
| Ang |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,700,000 |
| Contract ID |
020309/05/03 |
TSO |
Keo Veasna |
Project Type |
Rural Transport |
13,040,500 |
| Ou Char |
1 |
202 |
Laterite road |
0.29 [ 0.32 ] |
Km |
10,708,263 |
3.000 Width (m) |
203.000 Earth fill m3 |
3,437,352 |
| Anhchanh |
2 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
10,737,128 |
3.000 Width (m) |
203.000 Earth fill m3 |
3,178,190 |
| Andoung Chenh |
3 |
202 |
Laterite road |
0.25 [ 0.25 ] |
Km |
10,708,263 |
3.000 Width (m) |
203.000 Earth fill m3 |
2,677,066 |
| Kab Kou Thmei |
4 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
10,708,263 |
3.000 Width (m) |
203.000 Earth fill m3 |
3,747,892 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,040,500 |
Battambang, Svay Pao
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
020310/05/01 |
TSO |
Keo Veasna |
Project Type |
Rural Transport |
33,572,800 |
| Mphey Osakphea |
1 |
202 |
Laterite road |
0.29 [ 0.29 ] |
Km |
22,789,116 |
3.000 Width (m) |
248.000 Earth fill m3 |
6,700,000 |
| Preaek Moha Tep |
2 |
202 |
Laterite road |
0.85 [ 0.85 ] |
Km |
14,954,353 |
4.000 Width (m) |
248.000 Earth fill m3 |
12,711,200 |
| Kammeakkar |
3 |
202 |
Laterite road |
0.90 [ 0.95 ] |
Km |
14,954,337 |
4.000 Width (m) |
248.000 Earth fill m3 |
14,161,757 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,572,957 |