Contract Outputs
Location: Svay Rieng \ Romeas Haek Budget Year: 2006
Chantrea
Kampong Rou
Rumduol
Romeas Haek
Svay Chrum
Svay Rieng
Svay Teab
Romeas Haek, Ampil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200401/06/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
36,828,800 |
| Trapeang Popel |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
6,800,000 |
3.500 Width (m) |
600.000 Earth fill m3 |
6,800,000 |
| Trapeang Pikar |
2 |
202 |
Laterite road |
1.92 [ 1.92 ] |
Km |
6,800,000 |
3.500 Width (m) |
11,496.000 Earth fill m3 |
13,028,800 |
| Srae Ruessei |
3 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
6,800,000 |
4.000 Width (m) |
6,055.000 Earth fill m3 |
13,600,000 |
| Traok |
4 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
6,800,000 |
4.000 Width (m) |
5,501.000 Earth fill m3 |
3,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,828,800 |
| Contract ID |
200401/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,941,600 |
| Tuek Vil |
1 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
64,720 |
1.000 Diameter (m) |
5.000 Length (m) |
323,600 |
| Tbaeng |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
64,720 |
0.800 Diameter (m) |
5.000 Length (m) |
194,160 |
| Ta Mau |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
64,720 |
0.800 Diameter (m) |
5.000 Length (m) |
194,160 |
| Trapeang Bei |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
64,720 |
0.600 Diameter (m) |
5.000 Length (m) |
129,440 |
| Trapeang Popel |
5 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
64,720 |
0.600 Diameter (m) |
5.000 Length (m) |
194,160 |
| Trapeang Pikar |
6 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
64,720 |
0.600 Diameter (m) |
5.000 Length (m) |
258,880 |
| Ampil |
7 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
64,720 |
0.600 Diameter (m) |
4.000 Length (m) |
194,160 |
| Romeas Haek |
8 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
64,720 |
0.600 Diameter (m) |
5.000 Length (m) |
194,160 |
| Traok |
9 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
64,720 |
0.600 Diameter (m) |
5.000 Length (m) |
258,880 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,941,600 |
Romeas Haek, Andoung Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200402/06/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
31,587,500 |
| Trapeang Bos |
1 |
201 |
Earth road |
0.63 [ 0.63 ] |
Km |
15,000,000 |
4.000 Width (m) |
1,628.000 Earth fill m3 |
9,450,000 |
| Ream Sena |
2 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
11,500,000 |
4.000 Width (m) |
2,998.480 Earth fill m3 |
12,650,000 |
| Roung Snao |
3 |
201 |
Earth road |
0.83 [ 0.83 ] |
Km |
11,500,000 |
4.000 Width (m) |
2,248.860 Earth fill m3 |
9,487,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,587,500 |
Romeas Haek, Andoung Trabaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200403/06/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
29,500,000 |
| Kamraeng |
1 |
202 |
Laterite road |
3.05 [ 3.05 ] |
Km |
7,213,115 |
3.500 Width (m) |
1,830.000 Earth fill m3 |
22,000,001 |
| Trapeang Smach |
2 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Trapeang Smach |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,500,001 |
| Contract ID |
200403/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,774,800 |
| Tuol Chres |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,733 |
0.600 Diameter (m) |
5.000 Length (m) |
197,199 |
| Kamraeng |
2 |
211 |
Single pipe culvert |
6.00 [ 6.00 ] |
Place |
65,733 |
0.600 Diameter (m) |
5.000 Length (m) |
394,398 |
| Tuol |
3 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
65,733 |
0.800 Diameter (m) |
5.000 Length (m) |
262,932 |
| Chik Dei |
4 |
211 |
Single pipe culvert |
6.00 [ 6.00 ] |
Place |
65,733 |
0.800 Diameter (m) |
5.000 Length (m) |
394,398 |
| Andoung Trabaek |
5 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
65,733 |
0.600 Diameter (m) |
5.000 Length (m) |
328,665 |
| Trapeang Smach |
6 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,733 |
0.600 Diameter (m) |
5.000 Length (m) |
197,199 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,774,791 |
Romeas Haek, Angk Prasrae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200404/06/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
38,997,900 |
| Samraong |
1 |
202 |
Laterite road |
0.47 [ 0.47 ] |
Km |
6,920,000 |
2.500 Width (m) |
209.680 Earth fill m3 |
3,224,720 |
| Trapeang Pring |
2 |
202 |
Laterite road |
1.36 [ 1.36 ] |
Km |
6,920,000 |
2.500 Width (m) |
609.680 Earth fill m3 |
9,376,600 |
| Trapeang Rumdenh |
3 |
202 |
Laterite road |
1.27 [ 1.27 ] |
Km |
6,920,000 |
2.500 Width (m) |
569.640 Earth fill m3 |
8,760,720 |
| Angk Prasrae |
4 |
202 |
Laterite road |
1.37 [ 1.37 ] |
Km |
6,920,000 |
2.500 Width (m) |
614.000 Earth fill m3 |
9,445,800 |
| Angk Prasrae |
5 |
201 |
Earth road |
1.37 [ 1.37 ] |
Km |
6,000,000 |
3.000 Width (m) |
2,941.000 Earth fill m3 |
8,190,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,997,840 |
| Contract ID |
200404/06/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
1,997,600 |
| Trapeang Thum |
1 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
1,377,655 |
4.000 Width (m) |
437.000 Earth fill m3 |
1,997,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,997,600 |
Romeas Haek, Chantrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200405/06/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
70,434,000 |
| Ta Phor |
1 |
201 |
Earth road |
1.90 [ 1.90 ] |
Km |
18,000,000 |
4.000 Width (m) |
6,930.900 Earth fill m3 |
34,200,000 |
| Trapeang Thlok Khang Tboung |
2 |
201 |
Earth road |
2.01 [ 2.01 ] |
Km |
18,000,000 |
4.000 Width (m) |
7,343.100 Earth fill m3 |
36,234,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
70,434,000 |
| Contract ID |
200405/06/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
21,246,500 |
| Prey Roluos |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
12,700,000 |
4.000 Width (m) |
3,662.000 Earth fill m3 |
16,446,500 |
| Prey Roluos |
2 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,246,500 |
| Contract ID |
200405/06/03 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
4,400,000 |
| Ta Phor |
1 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,400,000 |
| Contract ID |
200405/06/04 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
1,967,200 |
| Prey Totueng |
1 |
201 |
Earth road |
1.55 [ 1.55 ] |
Km |
1,269,161 |
4.000 Width (m) |
428.000 Earth fill m3 |
1,967,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,967,200 |
Romeas Haek, Chrey Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200406/06/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
73,052,700 |
| Prey Chheu Teal |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
17,980,000 |
4.000 Width (m) |
3,143.000 Earth fill m3 |
17,980,000 |
| Dang Kdar |
2 |
201 |
Earth road |
0.28 [ 0.28 ] |
Km |
17,980,000 |
4.000 Width (m) |
890.000 Earth fill m3 |
5,088,340 |
| Srah |
4 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
17,980,000 |
5.000 Width (m) |
3,513.000 Earth fill m3 |
17,980,000 |
| Dang Kdar |
4 |
201 |
Earth road |
1.78 [ 1.78 ] |
Km |
17,980,000 |
5.000 Width (m) |
6,253.000 Earth fill m3 |
32,004,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
73,052,740 |
| Contract ID |
200406/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
14,100,000 |
| Khpob Trach |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Prey Romiet |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Prey Romiet |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Thmei |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Dak Por |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Prey Rumdenh |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Chong Prey |
7 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,100,000 |
| Contract ID |
200406/06/03 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,975,400 |
| Prey Romiet |
1 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
1,013,027 |
4.000 Width (m) |
84.000 Earth fill m3 |
607,816 |
| Thmei |
2 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
1,013,027 |
4.000 Width (m) |
315.000 Earth fill m3 |
1,367,586 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,975,403 |
Romeas Haek, Doung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200407/06/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
58,665,600 |
| Trapeang Rumpeak |
1 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
13,095,000 |
4.000 Width (m) |
2,777.000 Earth fill m3 |
9,166,500 |
| Chea Theach |
2 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
13,095,000 |
4.000 Width (m) |
4,165.000 Earth fill m3 |
19,642,500 |
| Svay Pok |
3 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
13,095,000 |
4.000 Width (m) |
4,443.000 Earth fill m3 |
3,928,500 |
| Poun |
4 |
201 |
Earth road |
1.98 [ 1.98 ] |
Km |
13,095,000 |
4.000 Width (m) |
1,057.000 Earth fill m3 |
25,928,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
58,665,600 |
| Contract ID |
200407/06/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
22,690,000 |
| Trapeang Rumpeak |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,050,000 |
| Thlok Pring |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,050,000 |
| Poun |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,050,000 |
| Poun |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,870,000 |
1.000 Diameter (m) |
6.000 Length (m) |
2,870,000 |
| Prich |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,240,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,480,000 |
| Prich |
6 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,920,000 |
0.800 Diameter (m) |
4.000 Length (m) |
3,840,000 |
| Chea Theach |
8 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,350,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,690,000 |
| Contract ID |
200407/06/03 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
1,929,500 |
| Thmei |
1 |
201 |
Earth road |
1.55 [ 1.55 ] |
Km |
1,244,839 |
4.000 Width (m) |
417.000 Earth fill m3 |
1,929,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,929,500 |
Romeas Haek, Kampong Trach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200408/06/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
60,490,000 |
| Ta Trav |
1 |
202 |
Laterite road |
1.87 [ 1.87 ] |
Km |
6,387,539 |
3.000 Width (m) |
924.000 Earth fill m3 |
11,944,698 |
| Chong Ou |
2 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
6,387,539 |
3.000 Width (m) |
867.000 Earth fill m3 |
9,581,309 |
| Ta Hang |
3 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
6,387,539 |
3.000 Width (m) |
871.000 Earth fill m3 |
9,581,309 |
| Chheu Phleung |
4 |
202 |
Laterite road |
3.05 [ 3.05 ] |
Km |
6,387,539 |
3.000 Width (m) |
1,575.000 Earth fill m3 |
19,481,994 |
| Prey Kralanh |
5 |
202 |
Laterite road |
1.55 [ 1.55 ] |
Km |
6,387,539 |
3.000 Width (m) |
735.000 Earth fill m3 |
9,900,685 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
60,489,994 |
| Contract ID |
200408/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,977,000 |
| Khla Lout |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,900 |
0.600 Diameter (m) |
5.000 Length (m) |
197,700 |
| Prey Khcheay |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
65,900 |
0.600 Diameter (m) |
5.000 Length (m) |
131,800 |
| Kampong Trach |
3 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
65,900 |
0.600 Diameter (m) |
5.000 Length (m) |
263,600 |
| Chong Ou |
4 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,900 |
0.600 Diameter (m) |
5.000 Length (m) |
197,700 |
| Chheu Phleung |
5 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
65,900 |
0.600 Diameter (m) |
5.000 Length (m) |
263,600 |
| Ta Hang |
6 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
65,900 |
0.600 Diameter (m) |
5.000 Length (m) |
329,500 |
| Pramat Pram |
7 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,900 |
0.600 Diameter (m) |
5.000 Length (m) |
197,700 |
| Ta Trav |
8 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
65,900 |
0.800 Diameter (m) |
5.000 Length (m) |
263,600 |
| Ta Khob |
9 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
65,900 |
0.800 Diameter (m) |
5.000 Length (m) |
131,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,977,000 |
Romeas Haek, Kokir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200409/06/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
26,499,800 |
| Kokir |
1 |
202 |
Laterite road |
3.77 [ 3.77 ] |
Km |
7,031,000 |
3.500 Width (m) |
2,898.000 Earth fill m3 |
26,499,839 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,499,839 |
Romeas Haek, Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200410/06/01 |
TSO |
Soem Saravuth |
Project Type |
Education |
71,400,000 |
| Thlok Veay Ti Pir |
1 |
322 |
Brick school with fibro roof |
3.00 [ 3.00 ] |
School room |
23,800,000 |
24.000 Length (m) |
9.000 Width (m) |
71,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
71,400,000 |
| Contract ID |
200410/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,990,900 |
| Ta Menh |
1 |
201 |
Earth road |
1.75 [ 1.75 ] |
Km |
1,137,657 |
4.000 Width (m) |
415.000 Earth fill m3 |
1,990,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,990,900 |
Romeas Haek, Mukh Da
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200411/06/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
63,066,600 |
| Mukh Da |
1 |
201 |
Earth road |
1.69 [ 1.69 ] |
Km |
16,200,000 |
4.000 Width (m) |
4,784.000 Earth fill m3 |
27,297,000 |
| Thnal Totueng |
2 |
201 |
Earth road |
2.21 [ 2.21 ] |
Km |
16,200,000 |
4.000 Width (m) |
6,629.000 Earth fill m3 |
35,769,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
63,066,600 |
| Contract ID |
200411/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
7,999,200 |
| Romiet |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
999,900 |
0.600 Diameter (m) |
5.000 Length (m) |
2,999,700 |
| Thnal Totueng |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
999,900 |
0.600 Diameter (m) |
5.000 Length (m) |
1,999,800 |
| Bos Kabbas |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
999,900 |
0.600 Diameter (m) |
5.000 Length (m) |
1,999,800 |
| Mukh Da |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
999,900 |
0.600 Diameter (m) |
5.000 Length (m) |
999,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,999,200 |
| Contract ID |
200411/06/03 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,958,500 |
| Bos Kabbas |
1 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
1,350,690 |
4.000 Width (m) |
427.000 Earth fill m3 |
1,958,501 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,958,501 |
Romeas Haek, Mream
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200412/06/01 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
89,027,400 |
| Mream Khang Tboung |
1 |
203 |
Gravel road |
1.10 [ 1.10 ] |
Km |
19,740,000 |
3.000 Width (m) |
568.000 Earth fill m3 |
21,714,000 |
| Ak Muol |
2 |
203 |
Gravel road |
1.25 [ 1.25 ] |
Km |
19,740,000 |
3.000 Width (m) |
645.000 Earth fill m3 |
24,675,000 |
| Lbaeuk |
3 |
203 |
Gravel road |
1.05 [ 1.05 ] |
Km |
19,740,000 |
3.000 Width (m) |
551.000 Earth fill m3 |
20,727,000 |
| Ta Pang |
4 |
203 |
Gravel road |
1.11 [ 1.11 ] |
Km |
19,740,000 |
3.000 Width (m) |
603.000 Earth fill m3 |
21,911,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
89,027,400 |
| Contract ID |
200412/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,974,200 |
| Trapeang Choar |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
6.000 Length (m) |
197,421 |
| Ak Muol |
2 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
5.000 Length (m) |
263,228 |
| Ampil |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
5.000 Length (m) |
197,421 |
| Thmea |
4 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
3.000 Length (m) |
197,421 |
| Trapeang Trasak |
5 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
5.000 Length (m) |
197,421 |
| Chrung Popel |
6 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
5.000 Length (m) |
197,421 |
| Mream Khang Cheung |
7 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
5.000 Length (m) |
263,228 |
| Ta Tru |
8 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
3.000 Length (m) |
197,421 |
| Lbaeuk |
9 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
65,807 |
0.600 Diameter (m) |
4.000 Length (m) |
263,228 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,974,210 |
Romeas Haek, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200413/06/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
72,218,400 |
| Sambuor |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
16,736,000 |
4.000 Width (m) |
1,567.540 Earth fill m3 |
8,368,000 |
| Souphi |
2 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
16,736,000 |
4.000 Width (m) |
5,016.130 Earth fill m3 |
26,777,600 |
| Traok |
3 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
16,736,000 |
4.000 Width (m) |
2,194.560 Earth fill m3 |
11,715,200 |
| Tmat Pong |
4 |
201 |
Earth road |
0.35 [ 0.35 ] |
Km |
16,736,000 |
4.000 Width (m) |
1,097.280 Earth fill m3 |
5,857,600 |
| Tmat Pong |
5 |
220 |
Box culvert (general) |
1.00 [ 1.00 ] |
Place |
19,500,000 |
2.000 Total Span (m) |
5.000 Width(m) |
19,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
72,218,400 |
| Contract ID |
200413/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,975,500 |
| Tmat Pong |
1 |
201 |
Earth road |
1.55 [ 1.55 ] |
Km |
1,274,516 |
4.000 Width (m) |
417.000 Earth fill m3 |
1,975,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,975,500 |
Romeas Haek, Sambatt Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200414/06/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
67,861,500 |
| Bet Ting |
1 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
16,100,000 |
4.000 Width (m) |
3,428.390 Earth fill m3 |
17,710,000 |
| Lbaeuk |
2 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
16,100,000 |
4.000 Width (m) |
2,960.880 Earth fill m3 |
15,295,000 |
| Bet Ting |
3 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
16,100,000 |
4.000 Width (m) |
3,197.020 Earth fill m3 |
16,100,000 |
| Chamkar Kaoh |
4 |
201 |
Earth road |
1.17 [ 1.17 ] |
Km |
16,100,000 |
4.000 Width (m) |
3,724.530 Earth fill m3 |
18,756,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
67,861,500 |
| Contract ID |
200414/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
7,700,000 |
| Bet Ting |
1 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,400,000 |
| Lbaeuk |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,700,000 |
| Contract ID |
200414/06/03 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,998,200 |
| Tuol Srama |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
1,051,684 |
4.000 Width (m) |
200.000 Earth fill m3 |
1,051,684 |
| Bet Ting |
2 |
201 |
Earth road |
0.90 [ 0.90 ] |
Km |
1,051,684 |
4.000 Width (m) |
170.000 Earth fill m3 |
946,516 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,998,200 |
Romeas Haek, Trapeang Sdau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200415/06/01 |
TSO |
Sen Sovann |
Project Type |
Irrigation |
54,690,000 |
| Ta Kot |
1 |
410 |
Earth dam |
0.60 [ 0.60 ] |
Km |
66,150,000 |
1.500 Max. height (m) |
9,363.000 Volume (m3) |
39,690,000 |
| Ta Kot |
2 |
251 |
Drift |
1.00 [ 1.00 ] |
Place |
15,000,000 |
40.000 Length (m) |
4.000 Width (m) |
15,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
54,690,000 |
| Contract ID |
200415/06/02 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
37,057,500 |
| Trapeang Chhneang |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
12,150,000 |
4.000 Width (m) |
4,019.510 Earth fill m3 |
18,225,000 |
| Trapeang Skon Thmei |
2 |
201 |
Earth road |
1.55 [ 1.55 ] |
Km |
12,150,000 |
4.000 Width (m) |
4,153.490 Earth fill m3 |
18,832,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,057,500 |
| Contract ID |
200415/06/03 |
TSO |
Sen Sovann |
Project Type |
Rural Transport |
1,993,200 |
| Svay Tontuem |
1 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
1,476,444 |
4.000 Width (m) |
438.000 Earth fill m3 |
1,993,199 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,993,199 |
Romeas Haek, Tras
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200416/06/01 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
52,999,000 |
| Veal Veaeng |
1 |
202 |
Laterite road |
1.45 [ 1.45 ] |
Km |
8,721,244 |
3.500 Width (m) |
762.000 Earth fill m3 |
12,645,804 |
| Popul |
2 |
202 |
Laterite road |
2.87 [ 2.87 ] |
Km |
8,721,244 |
3.500 Width (m) |
1,506.000 Earth fill m3 |
25,029,970 |
| Serei Ao |
3 |
202 |
Laterite road |
1.76 [ 1.76 ] |
Km |
8,721,244 |
3.500 Width (m) |
1,391.000 Earth fill m3 |
15,323,226 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,999,000 |
| Contract ID |
200416/06/02 |
TSO |
Soem Saravuth |
Project Type |
Rural Transport |
1,964,300 |
| Trapeang Banteay |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
203,202 |
| Voat |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
33,867 |
0.600 Diameter (m) |
5.000 Length (m) |
67,734 |
| Mreaks Teab |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
203,202 |
| Ta Suos |
4 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
270,936 |
| Popel |
5 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
203,202 |
| Popul |
6 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
203,202 |
| Veal Veaeng |
7 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
203,202 |
| Veal Tmat |
8 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
135,468 |
| Serei Ao |
9 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
203,202 |
| Boeng |
10 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
67,734 |
0.600 Diameter (m) |
5.000 Length (m) |
203,202 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,896,552 |