Contract Outputs
Location: Svay Rieng \ Svay Teab Budget Year: 2006
Chantrea
Kampong Rou
Rumduol
Romeas Haek
Svay Chrum
Svay Rieng
Svay Teab
Svay Teab, Chrak Mtes
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200701/06/01 |
TSO |
Prak Dara |
Project Type |
Irrigation |
27,750,000 |
| Sameakki |
1 |
420 |
Canal |
1.20 [ 1.20 ] |
Km |
18,500,000 |
1.800 Depth (m) |
9,455.000 Volume (m3) |
22,200,000 |
| Thnal Totueng |
2 |
420 |
Canal |
0.30 [ 0.30 ] |
Km |
18,500,000 |
1.800 Depth (m) |
1,335.000 Volume (m3) |
5,550,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,750,000 |
Svay Teab, Kokir Saom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200702/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
38,002,800 |
| Tbaeng |
1 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
14,200,000 |
4.000 Width (m) |
1,300.000 Earth fill m3 |
4,260,000 |
| Tbaeng |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Chheu Teal |
3 |
201 |
Earth road |
1.83 [ 1.83 ] |
Km |
14,200,000 |
4.000 Width (m) |
8,090.000 Earth fill m3 |
26,042,800 |
| Chheu Teal |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,300,000 |
| Chheu Teal |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,002,800 |
| Contract ID |
200702/06/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
2,597,300 |
| Tuol Angk |
1 |
201 |
Earth road |
1.60 [ 1.60 ] |
Km |
1,527,813 |
4.000 Width (m) |
278.000 Earth fill m3 |
2,444,501 |
| Bat Thang |
2 |
201 |
Earth road |
0.10 [ 0.10 ] |
Km |
1,528,000 |
4.000 Width (m) |
13.000 Earth fill m3 |
152,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,597,301 |
Svay Teab, Kandieng Reay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200703/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
48,099,800 |
| Banteay |
1 |
203 |
Gravel road |
1.50 [ 1.50 ] |
Km |
29,240,000 |
3.500 Width (m) |
3,082.980 Earth fill m3 |
43,860,000 |
| Kandieng Reay |
2 |
203 |
Gravel road |
0.15 [ 0.15 ] |
Km |
29,240,000 |
3.500 Width (m) |
1,747.020 Earth fill m3 |
4,239,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,099,800 |
Svay Teab, Monourom
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200704/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
42,027,400 |
| Ou Ta Mou |
1 |
203 |
Gravel road |
0.40 [ 0.40 ] |
Km |
22,260,250 |
4.500 Width (m) |
819.000 Earth fill m3 |
8,904,100 |
| Monourom |
2 |
203 |
Gravel road |
1.35 [ 1.49 ] |
Km |
22,260,280 |
4.500 Width (m) |
2,293.000 Earth fill m3 |
33,123,297 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,027,397 |
| Contract ID |
200704/06/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
1,368,500 |
| Monourom |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
2,272,000 |
4.000 Width (m) |
163.000 Earth fill m3 |
1,249,600 |
| Monourom |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
43,900 |
1.000 Diameter (m) |
7.000 Length (m) |
43,900 |
| Ou Ta Mou |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
40,000 |
0.800 Diameter (m) |
5.000 Length (m) |
40,000 |
| Ou Ta Mou |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
35,000 |
0.600 Diameter (m) |
7.000 Length (m) |
35,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,368,500 |
Svay Teab, Popeaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200705/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
40,699,100 |
| Kampout Mreak |
1 |
203 |
Gravel road |
0.80 [ 0.80 ] |
Km |
19,399,000 |
3.500 Width (m) |
480.000 Earth fill m3 |
15,519,200 |
| Thlok Pring |
2 |
203 |
Gravel road |
1.30 [ 1.30 ] |
Km |
19,399,000 |
3.500 Width (m) |
1,750.200 Earth fill m3 |
25,179,902 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,699,102 |
| Contract ID |
200705/06/02 |
TSO |
Prak Dara |
Project Type |
Irrigation |
15,796,300 |
| Svay Koy |
1 |
420 |
Canal |
1.30 [ 1.30 ] |
Km |
12,151,000 |
1.600 Depth (m) |
6,834.000 Volume (m3) |
15,796,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,796,300 |
| Contract ID |
200705/06/03 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
1,891,100 |
| Thlok Pring |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
1,260,733 |
4.000 Width (m) |
232.000 Earth fill m3 |
1,891,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,891,100 |
Svay Teab, Prey Ta Ei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200706/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
26,315,000 |
| Trapeang Ta Ei |
1 |
203 |
Gravel road |
1.10 [ 1.10 ] |
Km |
19,000,000 |
3.500 Width (m) |
660.000 Earth fill m3 |
20,900,000 |
| Trapeang Sbov |
2 |
203 |
Gravel road |
0.29 [ 0.29 ] |
Km |
19,000,000 |
3.500 Width (m) |
600.000 Earth fill m3 |
5,415,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,315,000 |
| Contract ID |
200706/06/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
24,094,400 |
| Trapeang Chak |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
20,180,000 |
4.000 Width (m) |
1,400.000 Earth fill m3 |
10,090,000 |
| Trapeang Chak |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Trapeang Phlang |
3 |
201 |
Earth road |
0.58 [ 0.58 ] |
Km |
20,180,000 |
4.000 Width (m) |
1,578.000 Earth fill m3 |
11,704,400 |
| Trapeang Phlang |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,300,000 |
0.800 Diameter (m) |
6.000 Length (m) |
1,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,094,400 |
Svay Teab, Prasout
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200707/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
28,047,700 |
| Prey Totueng |
1 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
11,791,800 |
4.000 Width (m) |
1,850.000 Earth fill m3 |
14,739,750 |
| Chheu Teal |
2 |
201 |
Earth road |
0.94 [ 0.94 ] |
Km |
11,791,800 |
4.000 Width (m) |
3,700.000 Earth fill m3 |
11,107,876 |
| Chheu Teal |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,047,626 |
| Contract ID |
200707/06/02 |
TSO |
Prak Dara |
Project Type |
Irrigation |
62,612,500 |
| Angk Svay |
1 |
420 |
Canal |
1.75 [ 1.75 ] |
Km |
24,250,000 |
2.000 Depth (m) |
18,431.400 Volume (m3) |
42,437,500 |
| Pou Vong |
2 |
420 |
Canal |
0.30 [ 0.30 ] |
Km |
24,250,000 |
2.000 Depth (m) |
3,159.700 Volume (m3) |
7,275,000 |
| Angk Svay |
3 |
211 |
Single pipe culvert |
6.00 [ 6.00 ] |
Place |
2,150,000 |
1.000 Diameter (m) |
5.000 Length (m) |
12,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
62,612,500 |
| Contract ID |
200707/06/03 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
20,485,400 |
| Prey Ta Yueng |
1 |
201 |
Earth road |
1.55 [ 1.55 ] |
Km |
10,008,390 |
4.000 Width (m) |
2,600.000 Earth fill m3 |
15,513,005 |
| Prey Ta Yueng |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Prey Totueng |
3 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
10,008,560 |
4.000 Width (m) |
1,052.000 Earth fill m3 |
3,973,398 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,486,403 |
| Contract ID |
200707/06/04 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
2,270,400 |
| Angk Ta Mouk |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
1,261,400 |
4.000 Width (m) |
63.000 Earth fill m3 |
630,700 |
| Prey Tuol |
2 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
1,261,400 |
4.000 Width (m) |
75.000 Earth fill m3 |
630,700 |
| Prey Ta Yueng |
3 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
1,261,250 |
4.000 Width (m) |
118.000 Earth fill m3 |
1,009,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,270,400 |
Svay Teab, Romeang Thkaol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200708/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
24,192,400 |
| Baek Chan |
1 |
201 |
Earth road |
1.47 [ 1.47 ] |
Km |
12,920,000 |
4.000 Width (m) |
3,971.000 Earth fill m3 |
18,992,400 |
| Baek Chan |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,300,000 |
| Baek Chan |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,900,000 |
0.800 Diameter (m) |
6.000 Length (m) |
1,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,192,400 |
Svay Teab, Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200709/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
61,997,800 |
| Tuol Angkob |
1 |
203 |
Gravel road |
0.90 [ 0.90 ] |
Km |
33,169,000 |
3.500 Width (m) |
1,900.000 Earth fill m3 |
29,852,100 |
| Tuol Angkob |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Thmei |
3 |
203 |
Gravel road |
0.94 [ 0.94 ] |
Km |
33,169,000 |
3.500 Width (m) |
3,008.000 Earth fill m3 |
31,145,691 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
61,997,791 |
| Contract ID |
200709/06/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
39,298,500 |
| Tuol Angkob |
1 |
202 |
Laterite road |
2.05 [ 2.05 ] |
Km |
19,170,000 |
3.500 Width (m) |
1,383.000 Earth fill m3 |
39,298,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,298,500 |
| Contract ID |
200709/06/03 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
1,230,700 |
| Tuol Angkob |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
646,300 |
2.000 Total Span (m) |
3.000 Width(m) |
646,300 |
| Thmei |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
48,700 |
0.800 Diameter (m) |
4.000 Length (m) |
48,700 |
| Prey Samphor |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
48,700 |
0.600 Diameter (m) |
5.000 Length (m) |
48,700 |
| Prey Samphor |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
48,700 |
0.800 Diameter (m) |
5.000 Length (m) |
48,700 |
| Ou K'am |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
48,700 |
0.800 Diameter (m) |
5.000 Length (m) |
48,700 |
| Sangkruoh |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
48,700 |
0.600 Diameter (m) |
4.000 Length (m) |
48,700 |
| Sangkruoh |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
48,700 |
0.800 Diameter (m) |
4.000 Length (m) |
48,700 |
| Prey Totueng |
9 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
48,700 |
0.800 Diameter (m) |
4.000 Length (m) |
146,100 |
| Prey Samphor |
10 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
48,700 |
0.600 Diameter (m) |
5.000 Length (m) |
97,400 |
| Trapeang Ampil |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
48,700 |
0.600 Diameter (m) |
4.000 Length (m) |
48,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,230,700 |
Svay Teab, Sangkhoar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200710/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
32,408,500 |
| Thmei |
1 |
203 |
Gravel road |
0.30 [ 0.30 ] |
Km |
15,700,000 |
3.500 Width (m) |
180.000 Earth fill m3 |
4,710,000 |
| Bak Ronoas |
2 |
203 |
Gravel road |
1.00 [ 1.00 ] |
Km |
15,700,000 |
3.500 Width (m) |
600.000 Earth fill m3 |
15,700,000 |
| Thlok |
3 |
203 |
Gravel road |
0.55 [ 0.55 ] |
Km |
15,700,000 |
3.500 Width (m) |
330.000 Earth fill m3 |
8,635,000 |
| Thlok |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
1.000 Diameter (m) |
8.000 Length (m) |
2,500,000 |
| Chambak Peam |
5 |
203 |
Gravel road |
0.06 [ 0.06 ] |
Km |
15,700,000 |
3.500 Width (m) |
300.000 Earth fill m3 |
863,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,408,500 |
Svay Teab, Svay Rumpea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
200711/06/01 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
71,458,600 |
| Kak |
1 |
203 |
Gravel road |
2.13 [ 2.13 ] |
Km |
19,669,000 |
3.500 Width (m) |
1,404.000 Earth fill m3 |
41,816,294 |
| Angkrong |
2 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
11,746,500 |
4.000 Width (m) |
1,900.000 Earth fill m3 |
5,873,250 |
| Angkrong |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Tuol Ampil |
4 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
11,746,500 |
4.000 Width (m) |
3,558.000 Earth fill m3 |
19,969,050 |
| Tuol Ampil |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,600,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
71,458,594 |
| Contract ID |
200711/06/02 |
TSO |
Prak Dara |
Project Type |
Rural Transport |
1,884,800 |
| Angkrong |
1 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
1,108,706 |
4.000 Width (m) |
209.500 Earth fill m3 |
1,884,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,884,800 |