Contract Outputs

Location: Svay Rieng \ Svay Chrum Budget Year: 2006

Chantrea    Kampong Rou    Rumduol    Romeas Haek    Svay Chrum    Svay Rieng    Svay Teab   

Svay Chrum, Angk Ta Sou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200501/06/01 TSO On Kea Project Type Education 63,000,000
Svay Ming 1 322 Brick school with fibro roof 3.00 [ 3.00 ] School room 21,000,000 24.000 Length (m) 9.000 Width (m) 63,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  63,000,000
Contract ID 200501/06/02 TSO On Kea Project Type Rural Transport 4,060,000
Boeng 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,060,000 1.000 Diameter (m) 5.000 Length (m) 4,060,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,060,000
Contract ID 200501/06/03 TSO On Kea Project Type Rural Transport 986,500
Roka 1 201 Earth road 1.10 [ 1.10 ] Km 896,818 4.000 Width (m) 397.000 Earth fill m3 986,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  986,500

Svay Chrum, Basak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200502/06/01 TSO On Kea Project Type Irrigation 59,999,900
Basak 1 420 Canal 2.32 [ 2.32 ] Km 25,873,180 1.500 Depth (m) 29,657.000 Volume (m3) 59,999,904
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  59,999,904
Contract ID 200502/06/02 TSO On Kea Project Type Rural Transport 2,862,600
Pou Ta Ros 1 201 Earth road 2.50 [ 2.50 ] Km 862,240 4.000 Width (m) 282.500 Earth fill m3 2,155,600
Basak 2 201 Earth road 0.82 [ 0.82 ] Km 862,195 4.000 Width (m) 285.500 Earth fill m3 707,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,862,600

Svay Chrum, Chambak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200503/06/01 TSO On Kea Project Type Irrigation 81,579,300
Ampov Prey 1 420 Canal 1.55 [ 1.55 ] Km 41,900,000 1.000 Depth (m) 31,150.000 Volume (m3) 64,945,000
Tuol Khpos 2 420 Canal 0.40 [ 0.40 ] Km 41,900,000 1.000 Depth (m) 20,700.000 Volume (m3) 16,634,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  81,579,300
Contract ID 200503/06/02 TSO On Kea Project Type Rural Transport 1,837,500
Angk Sala 1 201 Earth road 0.36 [ 0.36 ] Km 919,722 4.000 Width (m) 12.610 Earth fill m3 331,100
Tuol Chres 2 201 Earth road 1.64 [ 1.64 ] Km 919,658 4.000 Width (m) 192.600 Earth fill m3 1,506,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,837,500

Svay Chrum, Chamlang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200504/06/01 TSO On Kea Project Type Rural Transport 69,594,700
Veal Lngeut 1 203 Gravel road 0.45 [ 0.45 ] Km 34,300,000 3.500 Width (m) 1,215.000 Earth fill m3 15,435,000
Chie Ruessei 2 203 Gravel road 1.58 [ 1.58 ] Km 34,300,000 3.500 Width (m) 4,261.000 Earth fill m3 54,159,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  69,594,700
Contract ID 200504/06/02 TSO On Kea Project Type Rural Transport 33,142,200
Traok 1 201 Earth road 0.50 [ 0.50 ] Km 19,029,200 4.000 Width (m) 2,290.000 Earth fill m3 9,514,600
Ta Chey 2 201 Earth road 0.57 [ 0.57 ] Km 19,029,200 4.000 Width (m) 2,000.000 Earth fill m3 10,846,644
Traok 3 203 Gravel road 0.50 [ 0.50 ] Km 16,830,000 3.500 Width (m) 342.000 Earth fill m3 8,415,000
Ta Chey 4 203 Gravel road 0.20 [ 0.20 ] Km 16,830,000 3.500 Width (m) 120.000 Earth fill m3 3,366,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,142,244
Contract ID 200504/06/03 TSO On Kea Project Type Rural Transport 3,492,000
Traok 1 201 Earth road 0.70 [ 0.70 ] Km 2,934,572 4.000 Width (m) 392.000 Earth fill m3 2,054,200
Chambak Kuy 2 201 Earth road 0.49 [ 0.49 ] Km 2,934,286 4.000 Width (m) 392.000 Earth fill m3 1,437,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,492,001

Svay Chrum, Ta Suos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200505/06/01 TSO On Kea Project Type Rural Transport 121,251,400
Svay K'aer 1 203 Gravel road 1.98 [ 1.98 ] Km 19,780,000 3.500 Width (m) 1,885.000 Earth fill m3 39,065,500
Chambak Kaong 2 203 Gravel road 3.36 [ 3.36 ] Km 19,780,000 3.500 Width (m) 2,043.000 Earth fill m3 66,361,900
Boeng Andaeng 3 203 Gravel road 0.80 [ 0.80 ] Km 19,780,000 3.500 Width (m) 1,860.000 Earth fill m3 15,824,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  121,251,400
Contract ID 200505/06/02 TSO On Kea Project Type Rural Transport 1,077,800
Ta Pa 1 201 Earth road 1.80 [ 1.80 ] Km 598,778 4.000 Width (m) 178.000 Earth fill m3 1,077,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,077,800

Svay Chrum, Chek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200506/06/01 TSO On Kea Project Type Irrigation 117,142,000
Chek 1 420 Canal 3.00 [ 3.00 ] Km 33,469,150 2.200 Depth (m) 41,019.000 Volume (m3) 100,407,450
Chambak 2 420 Canal 0.44 [ 0.50 ] Km 33,469,200 2.200 Depth (m) 6,836.000 Volume (m3) 16,734,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  117,142,050
Contract ID 200506/06/02 TSO On Kea Project Type Rural Transport 8,000,000
Chek 1 211 Single pipe culvert 5.00 [ 5.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 5,000,000
Meloung 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Thmol 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,000,000
Contract ID 200506/06/03 TSO On Kea Project Type Rural Transport 1,473,300
Meloung 1 201 Earth road 0.64 [ 0.64 ] Km 1,234,992 4.000 Width (m) 145.600 Earth fill m3 794,100
Totea 2 201 Earth road 0.55 [ 0.55 ] Km 1,234,909 4.000 Width (m) 185.000 Earth fill m3 679,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,473,300

Svay Chrum, Chheu Teal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200507/06/01 TSO On Kea Project Type Rural Transport 86,212,500
Traok 1 201 Earth road 0.95 [ 0.95 ] Km 15,250,000 4.000 Width (m) 2,485.000 Earth fill m3 14,487,500
Nearea Ten 2 201 Earth road 1.30 [ 1.30 ] Km 15,250,000 4.000 Width (m) 3,385.000 Earth fill m3 19,825,000
Traok 3 203 Gravel road 0.95 [ 0.95 ] Km 19,600,000 3.500 Width (m) 540.000 Earth fill m3 18,620,000
Nearea Ten 4 203 Gravel road 1.30 [ 1.30 ] Km 19,600,000 3.500 Width (m) 780.000 Earth fill m3 25,480,000
Traok 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Nearea Ten 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.600 Diameter (m) 5.000 Length (m) 1,800,000
Prey Roka 7 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Nearea Ten 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.800 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  86,212,500
Contract ID 200507/06/02 TSO On Kea Project Type Rural Transport 1,391,100
Sangkae 1 201 Earth road 1.55 [ 1.55 ] Km 772,839 4.000 Width (m) 142.000 Earth fill m3 1,197,900
Poun Kak 2 201 Earth road 0.25 [ 0.25 ] Km 772,800 4.000 Width (m) 71.500 Earth fill m3 193,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,391,100

Svay Chrum, Doun Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200508/06/01 TSO On Kea Project Type Rural Transport 79,105,000
Doun Sar 1 201 Earth road 0.88 [ 0.88 ] Km 10,000,000 4.000 Width (m) 1,550.000 Earth fill m3 8,750,000
Prey Pou 2 201 Earth road 1.29 [ 1.29 ] Km 10,000,000 4.000 Width (m) 2,280.000 Earth fill m3 12,850,000
Rumpoat Chruk 3 201 Earth road 0.90 [ 0.90 ] Km 10,000,000 4.000 Width (m) 1,600.000 Earth fill m3 9,000,000
Doung Preah 4 201 Earth road 0.19 [ 0.19 ] Km 10,000,000 4.000 Width (m) 329.000 Earth fill m3 1,850,000
Doun Sar 5 203 Gravel road 0.88 [ 0.88 ] Km 21,700,000 3.500 Width (m) 525.000 Earth fill m3 18,987,500
Prey Pou 6 203 Gravel road 1.28 [ 1.28 ] Km 21,700,000 3.500 Width (m) 771.000 Earth fill m3 27,667,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  79,105,000
Contract ID 200508/06/02 TSO On Kea Project Type Rural Transport 3,067,700
Doung Preah 1 201 Earth road 1.40 [ 1.40 ] Km 1,676,357 4.000 Width (m) 475.000 Earth fill m3 2,346,900
Chensa 2 201 Earth road 0.43 [ 0.43 ] Km 1,676,279 4.000 Width (m) 97.600 Earth fill m3 720,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,067,700

Svay Chrum, Kouk Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200509/06/01 TSO On Kea Project Type Rural Transport 38,870,000
Doun Leaeb 1 203 Gravel road 2.18 [ 2.30 ] Km 16,900,000 3.500 Width (m) 1,900.000 Earth fill m3 38,870,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,870,000
Contract ID 200509/06/02 TSO On Kea Project Type Rural Transport 18,196,800
Svat Prahut 1 201 Earth road 1.34 [ 1.34 ] Km 13,600,000 4.000 Width (m) 3,801.000 Earth fill m3 18,196,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,196,800
Contract ID 200509/06/03 TSO On Kea Project Type Rural Transport 24,067,200
Kdompi 1 201 Earth road 1.78 [ 1.78 ] Km 10,900,000 4.000 Width (m) 4,101.000 Earth fill m3 19,402,000
Angk Kabbas 2 201 Earth road 0.43 [ 0.43 ] Km 10,900,000 4.000 Width (m) 986.000 Earth fill m3 4,665,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,067,200
Contract ID 200509/06/04 TSO On Kea Project Type Rural Transport 14,000,000
Angk Kabbas 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 6.000 Length (m) 1,000,000
Angk Kabbas 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Tbaeng 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Svat Prahut 4 220 Box culvert (general) 1.00 [ 1.00 ] Place 8,000,000 1.500 Total Span (m) 5.000 Width(m) 8,000,000
Chambak Thloeng 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 10.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,000,000
Contract ID 200509/06/05 TSO On Kea Project Type Rural Transport 2,462,300
Svat Prahut 1 201 Earth road 0.80 [ 0.80 ] Km 875,000 4.000 Width (m) 118.000 Earth fill m3 700,000
Chambak Thloeng 2 201 Earth road 1.30 [ 1.30 ] Km 875,000 4.000 Width (m) 154.000 Earth fill m3 1,137,500
Tbaeng 3 201 Earth road 0.71 [ 0.71 ] Km 875,070 4.000 Width (m) 161.000 Earth fill m3 624,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,462,300

Svay Chrum, Kraol Kou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200510/06/01 TSO On Kea Project Type Irrigation 107,400,000
Boeng Rae Khang Tboung 1 420 Canal 0.25 [ 0.25 ] Km 19,000,000 1.800 Depth (m) 1.787 Volume (m3) 4,750,000
Prey Thnong 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 1.000 Diameter (m) 6.000 Length (m) 4,000,000
Boeng Rae Khang Cheung 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 1.000 Diameter (m) 7.000 Length (m) 2,000,000
Kraol Kou 4 420 Canal 0.52 [ 1.50 ] Km 19,000,000 1.800 Depth (m) 13,942.000 Volume (m3) 28,500,000
Boeng Rae Khang Cheung 5 420 Canal 2.05 [ 2.05 ] Km 15,000,000 1.800 Depth (m) 14,705.000 Volume (m3) 30,750,000
Prey Thnong 6 420 Canal 2.20 [ 2.20 ] Km 17,000,000 1.800 Depth (m) 15,781.000 Volume (m3) 37,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  107,400,000
Contract ID 200510/06/02 TSO On Kea Project Type Rural Transport 4,847,000
Ruessei Chuor Cheung 1 201 Earth road 2.60 [ 2.60 ] Km 1,010,000 4.000 Width (m) 765.000 Earth fill m3 2,626,000
Ruessei Chuor Tboung 2 201 Earth road 2.20 [ 2.20 ] Km 1,009,545 4.000 Width (m) 287.000 Earth fill m3 2,220,999
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,846,999

Svay Chrum, Kruos

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200511/06/01 TSO On Kea Project Type Rural Transport 38,344,600
Samraong 1 201 Earth road 0.83 [ 0.83 ] Km 12,200,000 4.000 Width (m) 2,096.000 Earth fill m3 10,101,600
Rovieng 2 201 Earth road 2.32 [ 2.32 ] Km 12,200,000 4.000 Width (m) 6,034.000 Earth fill m3 28,243,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,344,600

Svay Chrum, Pouthi Reach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200512/06/01 TSO On Kea Project Type Irrigation 97,532,000
Chensa 1 420 Canal 1.03 [ 1.03 ] Km 19,475,100 2.000 Depth (m) 15,690.000 Volume (m3) 19,961,978
Tbaeng 2 420 Canal 1.08 [ 1.08 ] Km 19,475,100 2.000 Depth (m) 11,244.530 Volume (m3) 20,935,733
Prasat 3 420 Canal 1.05 [ 1.05 ] Km 19,475,100 2.000 Depth (m) 10,983.020 Volume (m3) 20,448,855
Ta Mom 4 420 Canal 0.39 [ 1.05 ] Km 19,475,100 2.000 Depth (m) 10,983.000 Volume (m3) 20,448,855
Anhchanh 5 420 Canal 0.00 [ 0.50 ] Km 19,475,100 2.000 Depth (m) 5,230.000 Volume (m3) 9,737,550
Prasat 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 1.000 Diameter (m) 6.000 Length (m) 2,000,000
Prasat 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 1.000 Diameter (m) 9.000 Length (m) 2,000,000
Ta Mom 8 211 Single pipe culvert 0.00 [ 1.00 ] Place 2,000,000 1.000 Diameter (m) 6.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  97,532,970
Contract ID 200512/06/02 TSO On Kea Project Type Rural Transport 2,997,700
Prey Damloung 1 201 Earth road 2.75 [ 2.75 ] Km 1,090,073 4.000 Width (m) 642.000 Earth fill m3 2,997,701
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,997,701

Svay Chrum, Svay Angk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200513/06/01 TSO On Kea Project Type Irrigation 27,000,000
Andoung 1 420 Canal 1.72 [ 1.72 ] Km 15,743,440 1.700 Depth (m) 12,718.000 Volume (m3) 27,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,000,000
Contract ID 200513/06/02 TSO On Kea Project Type Irrigation 35,725,000
Thnong 1 420 Canal 1.20 [ 1.20 ] Km 20,500,000 2.000 Depth (m) 14,812.000 Volume (m3) 24,600,000
Svay Ph'aem 2 420 Canal 0.45 [ 0.45 ] Km 25,000,000 2.000 Depth (m) 9,158.000 Volume (m3) 11,125,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,725,000
Contract ID 200513/06/03 TSO On Kea Project Type Rural Transport 16,000,000
Kandal 1 201 Earth road 0.60 [ 0.60 ] Km 17,582,418 4.000 Width (m) 2,810.770 Earth fill m3 10,549,451
Sampoar 2 201 Earth road 0.31 [ 0.31 ] Km 17,582,418 4.000 Width (m) 1,452.230 Earth fill m3 5,450,550
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,000,000
Contract ID 200513/06/04 TSO On Kea Project Type Rural Transport 2,585,600
Svay Ph'aem 1 201 Earth road 0.60 [ 0.60 ] Km 891,667 4.000 Width (m) 114.000 Earth fill m3 535,000
Sampoar 2 201 Earth road 1.10 [ 1.10 ] Km 891,636 4.000 Width (m) 206.000 Earth fill m3 980,800
Kandal 3 201 Earth road 1.20 [ 1.20 ] Km 891,500 4.000 Width (m) 155.000 Earth fill m3 1,069,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,585,599

Svay Chrum, Svay Chrum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200514/06/01 TSO On Kea Project Type Irrigation 35,999,200
Khmot 1 420 Canal 0.75 [ 0.75 ] Km 18,488,300 1.500 Depth (m) 4,437.000 Volume (m3) 13,866,225
Svay Chrum 2 420 Canal 0.77 [ 0.77 ] Km 18,488,300 1.500 Depth (m) 6,210.000 Volume (m3) 14,272,968
Khmot 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,485,000 1.000 Diameter (m) 6.000 Length (m) 4,970,000
Svay Chrum 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,890,000 1.000 Diameter (m) 8.000 Length (m) 2,890,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,999,193

Svay Chrum, Svay Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200515/06/01 TSO On Kea Project Type Rural Transport 30,100,000
Svay Doun Ei 1 203 Gravel road 0.75 [ 0.75 ] Km 17,200,000 3.500 Width (m) 450.000 Earth fill m3 12,900,000
Chamreh 2 203 Gravel road 1.00 [ 1.00 ] Km 17,200,000 3.500 Width (m) 600.000 Earth fill m3 17,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,100,000
Contract ID 200515/06/02 TSO On Kea Project Type Rural Transport 59,999,900
Popear 1 203 Gravel road 1.75 [ 1.75 ] Km 27,998,100 3.500 Width (m) 1,850.000 Earth fill m3 48,996,675
Krang Leav 2 203 Gravel road 0.39 [ 0.39 ] Km 27,998,100 3.200 Width (m) 1,709.000 Earth fill m3 11,003,253
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  59,999,928
Contract ID 200515/06/03 TSO On Kea Project Type Rural Transport 1,842,700
Popear 1 211 Single pipe culvert 4.00 [ 4.00 ] Place 65,800 0.800 Diameter (m) 4.000 Length (m) 263,200
Chamreh 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 65,800 0.800 Diameter (m) 4.000 Length (m) 263,200
Traok Thum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 65,800 0.800 Diameter (m) 4.000 Length (m) 65,800
Traok Thum 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 66,100 1.000 Diameter (m) 4.000 Length (m) 66,100
Svay Chek 5 211 Single pipe culvert 4.00 [ 4.00 ] Place 65,800 0.800 Diameter (m) 4.000 Length (m) 263,200
Dak Po 6 211 Single pipe culvert 8.00 [ 8.00 ] Place 65,800 0.800 Diameter (m) 4.000 Length (m) 526,400
Traok Touch 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 65,800 0.800 Diameter (m) 4.000 Length (m) 65,800
Tuol Trea 8 211 Single pipe culvert 5.00 [ 5.00 ] Place 65,800 0.800 Diameter (m) 4.000 Length (m) 329,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,842,700

Svay Chrum, Svay Yea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200516/06/01 TSO On Kea Project Type Irrigation 98,558,000
Svay Chumrov 1 420 Canal 1.10 [ 1.10 ] Km 41,800,000 2.200 Depth (m) 17,996.000 Volume (m3) 45,980,000
Prey Ph'ong 2 420 Canal 1.00 [ 1.00 ] Km 41,800,000 2.200 Depth (m) 16,360.000 Volume (m3) 41,800,000
Sikar 3 420 Canal 0.21 [ 0.21 ] Km 41,800,000 2.200 Depth (m) 3,436.000 Volume (m3) 8,778,000
Svay Chumrov 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 1.000 Diameter (m) 6.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  98,558,000
Contract ID 200516/06/02 TSO On Kea Project Type Rural Transport 3,836,900
Sikar 1 201 Earth road 0.90 [ 0.90 ] Km 1,065,778 4.000 Width (m) 252.000 Earth fill m3 959,200
Prey Ph'ong 2 201 Earth road 1.10 [ 1.10 ] Km 1,065,818 4.000 Width (m) 206.000 Earth fill m3 1,172,400
Svay Yea 3 201 Earth road 0.80 [ 0.80 ] Km 1,065,750 4.000 Width (m) 201.000 Earth fill m3 852,600
Kien Ta Siv 4 201 Earth road 0.80 [ 0.80 ] Km 1,065,875 4.000 Width (m) 128.000 Earth fill m3 852,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,836,900

Svay Chrum, Thlok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 200517/06/01 TSO On Kea Project Type Education 65,970,000
Thum 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 21,990,000 24.000 Length (m) 9.000 Width (m) 65,970,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  65,970,000
Contract ID 200517/06/02 TSO On Kea Project Type Rural Transport 10,670,100
Thlok 1 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,180,000 0.600 Diameter (m) 5.000 Length (m) 3,540,000
Samdei 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,180,000 0.600 Diameter (m) 5.000 Length (m) 1,180,000
Thum 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,196,700 0.800 Diameter (m) 5.000 Length (m) 1,196,700
Thlok 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,196,700 0.800 Diameter (m) 4.000 Length (m) 1,196,700
Thum 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,196,700 0.800 Diameter (m) 4.000 Length (m) 1,196,700
Ampov Prey 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,180,000 0.600 Diameter (m) 6.000 Length (m) 1,180,000
Doun Tong 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,180,000 0.600 Diameter (m) 4.000 Length (m) 1,180,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,670,100
Contract ID 200517/06/03 TSO On Kea Project Type Rural Transport 4,837,500
Doun Tong 2 201 Earth road 1.70 [ 1.70 ] Km 1,457,059 4.000 Width (m) 339.000 Earth fill m3 2,477,000
Samdei 2 201 Earth road 1.62 [ 1.62 ] Km 1,457,099 4.000 Width (m) 698.400 Earth fill m3 2,360,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,837,501