Contract Outputs
Location: Kampong Cham Budget Year: 2008
Batheay
Chamkar Leu
Cheung Prey
Dambae
Kampong Cham
Kampong Siem
Kang Meas
Kaoh Soutin
Krouch Chhmar
Memot
Ou Reang Ov
Ponhea Kraek
Prey Chhor
Srei Santhor
Stueng Trang
Tboung Khmum
Batheay, Batheay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030101/08/01 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
89,990,000 |
| Batheay |
1 |
201 |
Earth road |
2.60 [ 2.60 ] |
Km |
19,925,907 |
4.000 Width (m) |
6,884.000 Earth fill m3 |
51,787,432 |
| Svay Pok |
2 |
201 |
Earth road |
1.32 [ 1.32 ] |
Km |
19,925,907 |
4.000 Width (m) |
4,358.000 Earth fill m3 |
26,202,568 |
| Batheay |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
6,000,000 |
1.000 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Svay Pok |
4 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
89,990,000 |
Batheay, Chbar Ampov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030102/08/01 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
47,400,000 |
| Anlong Chrey |
1 |
201 |
Earth road |
1.37 [ 1.37 ] |
Km |
20,537,262 |
4.000 Width (m) |
3,481.000 Earth fill m3 |
28,156,586 |
| Stueng Chveng |
2 |
201 |
Earth road |
0.94 [ 0.94 ] |
Km |
20,537,261 |
4.000 Width (m) |
2,700.000 Earth fill m3 |
19,243,414 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,400,000 |
| Contract ID |
030102/08/02 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
20,250,000 |
| Tuol Chan |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
20,250,000 |
4.000 Width (m) |
1,640.000 Earth fill m3 |
20,250,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,250,000 |
Batheay, Chealea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030103/08/01 |
TSO |
Cheas Teng |
Project Type |
Urban Domestic Water Supplies |
23,500,000 |
| Chea Lea |
1 |
140 |
Ponds (general) |
1.00 [ 1.00 ] |
Place |
23,500,000 |
2.930 Depth (m) |
3,423.000 Volume (m3) |
23,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,500,000 |
| Contract ID |
030103/08/02 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
19,599,000 |
| Baek Peang |
1 |
202 |
Laterite road |
0.75 [ 0.75 ] |
Km |
26,132,000 |
3.500 Width (m) |
394.000 Earth fill m3 |
19,599,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,599,000 |
Batheay, Cheung Prey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030104/08/01 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
46,471,000 |
| Cheung Prey |
1 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
32,856,800 |
4.000 Width (m) |
5,671.000 Earth fill m3 |
41,071,000 |
| Cheung Prey |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,471,000 |
Batheay, Me Pring
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030105/08/01 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
68,179,200 |
| Tang Thlaeung |
1 |
201 |
Earth road |
1.61 [ 1.61 ] |
Km |
22,200,000 |
4.000 Width (m) |
4,840.000 Earth fill m3 |
35,719,800 |
| Tang Roleang |
2 |
201 |
Earth road |
1.33 [ 1.33 ] |
Km |
22,200,000 |
4.000 Width (m) |
3,846.000 Earth fill m3 |
29,459,400 |
| Tang Thlaeung |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
68,179,200 |
Batheay, Ph'av
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030106/08/01 |
TSO |
IM SARAN |
Project Type |
Irrigation |
40,233,000 |
| Tang Boeng |
1 |
410 |
Earth dam |
2.40 [ 2.40 ] |
Km |
16,763,750 |
0.800 Max. height (m) |
5,782.000 Volume (m3) |
40,233,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,233,000 |
| Contract ID |
030106/08/02 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
20,000,000 |
| Ph'av |
1 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
23,255,810 |
3.500 Width (m) |
921.000 Earth fill m3 |
6,976,743 |
| Ba Kal |
2 |
202 |
Laterite road |
0.56 [ 0.56 ] |
Km |
23,255,810 |
3.500 Width (m) |
294.000 Earth fill m3 |
13,023,254 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,999,997 |
Batheay, Sambour
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030107/08/01 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
60,100,000 |
| Sambour |
1 |
201 |
Earth road |
1.82 [ 1.82 ] |
Km |
24,739,440 |
4.000 Width (m) |
5,780.000 Earth fill m3 |
45,099,999 |
| Sambour |
2 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
8,000,000 |
| Sambour |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,500,000 |
1.000 Diameter (m) |
5.000 Length (m) |
7,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
60,099,999 |
| Contract ID |
030107/08/02 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
34,900,000 |
| Sangkaeub |
1 |
202 |
Laterite road |
0.82 [ 0.82 ] |
Km |
24,068,970 |
4.000 Width (m) |
764.000 Earth fill m3 |
19,688,417 |
| Veal |
2 |
202 |
Laterite road |
0.86 [ 0.63 ] |
Km |
24,068,960 |
4.000 Width (m) |
1,300.000 Earth fill m3 |
15,211,583 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,900,000 |
Batheay, Sandaek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030108/08/01 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
64,600,000 |
| Kampal |
2 |
202 |
Laterite road |
2.90 [ 2.90 ] |
Km |
22,275,862 |
4.000 Width (m) |
3,313.000 Earth fill m3 |
64,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
64,600,000 |
Batheay, Tang Krang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030109/08/01 |
TSO |
Cheas Teng |
Project Type |
Irrigation |
45,800,000 |
| Kampong Preah |
1 |
410 |
Earth dam |
0.63 [ 0.63 ] |
Km |
40,952,380 |
0.630 Max. height (m) |
2,171.000 Volume (m3) |
25,799,999 |
| Kampong Preah |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
20,000,000 |
2.000 Total span (m) |
2.000 Width (m) |
20,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,799,999 |
Batheay, Tang Krasang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030110/08/01 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
51,692,600 |
| Chan |
1 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
20,600,000 |
4.000 Width (m) |
3,684.000 Earth fill m3 |
27,768,800 |
| Khtum |
2 |
201 |
Earth road |
0.18 [ 0.18 ] |
Km |
20,600,000 |
4.000 Width (m) |
515.000 Earth fill m3 |
3,605,000 |
| Chi Neang |
3 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
20,600,000 |
4.000 Width (m) |
2,201.000 Earth fill m3 |
12,318,800 |
| Chan |
4 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
8,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,692,600 |
Batheay, Trab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030111/08/01 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
35,925,000 |
| Phnum Touch |
1 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
18,068,960 |
4.000 Width (m) |
3,743.000 Earth fill m3 |
26,199,992 |
| Phnum Touch |
2 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
1,945,000 |
0.600 Diameter (m) |
5.000 Length (m) |
9,725,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,924,992 |
Batheay, Tumnob
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030112/08/01 |
TSO |
Cheas Teng |
Project Type |
Rural Transport |
37,094,700 |
| Rung |
1 |
202 |
Laterite road |
0.66 [ 0.66 ] |
Km |
29,016,800 |
4.000 Width (m) |
1,449.000 Earth fill m3 |
19,209,122 |
| Prayuk |
2 |
202 |
Laterite road |
0.51 [ 0.51 ] |
Km |
29,016,800 |
4.000 Width (m) |
1,027.000 Earth fill m3 |
14,885,618 |
| Prayuk |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Prayuk |
4 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.400 |
0.000 |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,094,740 |
Chamkar Leu, Bos Khnaor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030201/08/01 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
38,499,600 |
| Saray |
1 |
201 |
Earth road |
0.26 [ 0.26 ] |
Km |
15,248,000 |
4.000 Width (m) |
415.000 Earth fill m3 |
3,964,480 |
| Prasaeur |
2 |
201 |
Earth road |
0.51 [ 0.51 ] |
Km |
15,248,000 |
4.000 Width (m) |
834.000 Earth fill m3 |
7,700,240 |
| Bos Khnor |
3 |
201 |
Earth road |
0.85 [ 0.85 ] |
Km |
15,248,000 |
3.500 Width (m) |
1,210.000 Earth fill m3 |
12,960,800 |
| Chranaom |
4 |
201 |
Earth road |
0.26 [ 0.26 ] |
Km |
15,248,000 |
3.000 Width (m) |
637.000 Earth fill m3 |
3,964,480 |
| Chranaom |
5 |
201 |
Earth road |
0.32 [ 0.32 ] |
Km |
15,248,000 |
2.000 Width (m) |
338.000 Earth fill m3 |
4,909,856 |
| Chranaom |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,499,856 |
| Contract ID |
030201/08/02 |
TSO |
Ou Chhengloch |
Project Type |
Rural Drainage and Flood Protection |
19,800,000 |
| Veal Thnong |
1 |
410 |
Earth dam |
0.15 [ 0.15 ] |
Km |
52,000,000 |
1.280 Max. height (m) |
707.000 Volume (m3) |
7,800,000 |
| Veal Thnong |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
6,000,000 |
1.000 Diameter (m) |
10.000 Width (m) |
6,000,000 |
| Veal Thnong |
3 |
252 |
Vented causeway |
1.00 [ 1.00 ] |
Place |
6,000,000 |
15.000 Length (m) |
1.000 Width (m) |
6,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,800,000 |
Chamkar Leu, Chamkar Andoung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030202/08/01 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
54,812,000 |
| Chamkar Andoung |
1 |
201 |
Earth road |
2.84 [ 2.84 ] |
Km |
19,300,000 |
4.000 Width (m) |
3,607.000 Earth fill m3 |
54,812,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
54,812,000 |
Chamkar Leu, Cheyyou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030203/08/01 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
28,280,000 |
| Cheyyou |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
24,000,000 |
3.000 Width (m) |
1,627.000 Earth fill m3 |
16,800,000 |
| Spueu Ka |
2 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
24,000,000 |
3.000 Width (m) |
530.000 Earth fill m3 |
8,280,000 |
| Cheyyou |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,280,000 |
| Contract ID |
030203/08/02 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
11,232,000 |
| Trapeang Lpov |
1 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
14,400,000 |
3.500 Width (m) |
1,418.000 Earth fill m3 |
11,232,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,232,000 |
Chamkar Leu, Lvea Leu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030204/08/01 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
36,700,000 |
| Kralaeng Kaeut |
1 |
201 |
Earth road |
0.19 [ 0.19 ] |
Km |
17,476,190 |
3.000 Width (m) |
283.000 Earth fill m3 |
3,233,095 |
| Phum Bei |
2 |
201 |
Earth road |
0.21 [ 0.21 ] |
Km |
17,476,190 |
3.500 Width (m) |
407.000 Earth fill m3 |
3,582,619 |
| Lvea Cheung |
3 |
201 |
Earth road |
0.53 [ 0.53 ] |
Km |
17,476,190 |
3.000 Width (m) |
973.000 Earth fill m3 |
9,227,428 |
| Phum Bei |
4 |
201 |
Earth road |
0.46 [ 0.46 ] |
Km |
17,476,190 |
4.000 Width (m) |
1,664.000 Earth fill m3 |
7,986,619 |
| Kbal Hong Chas |
5 |
201 |
Earth road |
0.73 [ 0.73 ] |
Km |
17,476,190 |
4.000 Width (m) |
1,681.000 Earth fill m3 |
12,670,238 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,699,999 |
Chamkar Leu, Spueu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030205/08/01 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
44,600,000 |
| Spueu Lech |
1 |
202 |
Laterite road |
0.53 [ 0.53 ] |
Km |
19,910,715 |
3.500 Width (m) |
0.000 Earth fill m3 |
10,552,679 |
| Spueu Kaeut |
2 |
202 |
Laterite road |
0.25 [ 0.25 ] |
Km |
19,910,715 |
3.500 Width (m) |
0.000 Earth fill m3 |
4,977,679 |
| Peaeng Meas Tboung |
3 |
202 |
Laterite road |
0.61 [ 0.61 ] |
Km |
19,910,710 |
3.500 Width (m) |
0.000 Earth fill m3 |
12,145,533 |
| Peaeng Meas Cheung |
4 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
19,910,715 |
3.500 Width (m) |
0.000 Earth fill m3 |
3,982,143 |
| Veal |
5 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
19,910,715 |
3.500 Width (m) |
0.000 Earth fill m3 |
5,973,215 |
| Popreng |
6 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
19,910,715 |
3.500 Width (m) |
0.000 Earth fill m3 |
6,968,750 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,599,999 |
| Contract ID |
030205/08/02 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
23,150,000 |
| Ou Veay |
1 |
201 |
Earth road |
0.52 [ 0.52 ] |
Km |
18,867,156 |
3.500 Width (m) |
906.000 Earth fill m3 |
9,773,187 |
| Spueu Lech |
2 |
201 |
Earth road |
0.19 [ 0.19 ] |
Km |
18,867,156 |
3.500 Width (m) |
358.000 Earth fill m3 |
3,490,424 |
| Spueu Kaeut |
3 |
201 |
Earth road |
0.26 [ 0.26 ] |
Km |
18,867,156 |
3.500 Width (m) |
378.000 Earth fill m3 |
4,943,195 |
| Peaeng Meas Tboung |
4 |
201 |
Earth road |
0.26 [ 0.26 ] |
Km |
18,867,156 |
3.500 Width (m) |
378.000 Earth fill m3 |
4,943,195 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,150,000 |
Chamkar Leu, Svay Teab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030206/08/01 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
63,778,400 |
| Svay Teab |
1 |
201 |
Earth road |
0.57 [ 0.57 ] |
Km |
16,270,000 |
4.000 Width (m) |
872.000 Earth fill m3 |
9,338,980 |
| Svay Teab |
2 |
201 |
Earth road |
0.12 [ 0.12 ] |
Km |
16,270,000 |
3.000 Width (m) |
191.000 Earth fill m3 |
1,952,400 |
| Srae Preal |
3 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
16,270,000 |
3.000 Width (m) |
1,237.000 Earth fill m3 |
12,609,250 |
| Thnal Baek Kaeut |
4 |
201 |
Earth road |
0.67 [ 0.67 ] |
Km |
16,270,000 |
3.000 Width (m) |
1,208.000 Earth fill m3 |
10,835,820 |
| Veal Ri Lech |
5 |
201 |
Earth road |
0.36 [ 0.36 ] |
Km |
16,270,000 |
3.000 Width (m) |
756.000 Earth fill m3 |
5,775,850 |
| Pramat Dei |
6 |
201 |
Earth road |
0.47 [ 0.47 ] |
Km |
16,270,000 |
3.000 Width (m) |
740.000 Earth fill m3 |
7,646,900 |
| Tang Krang |
7 |
201 |
Earth road |
0.96 [ 0.96 ] |
Km |
16,270,000 |
3.000 Width (m) |
1,359.000 Earth fill m3 |
15,619,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
63,778,400 |
Chamkar Leu, Ta Ong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030207/08/01 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
46,200,000 |
| Ta Ong |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
17,111,111 |
4.000 Width (m) |
1,362.000 Earth fill m3 |
13,688,889 |
| Tuol Meas |
2 |
201 |
Earth road |
1.90 [ 1.90 ] |
Km |
17,111,111 |
4.000 Width (m) |
3,362.000 Earth fill m3 |
32,511,111 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,200,000 |
Chamkar Leu, Ta Prok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030208/08/01 |
TSO |
Ou Chhengloch |
Project Type |
Rural Transport |
31,315,000 |
| Srae Prang |
1 |
201 |
Earth road |
0.61 [ 0.61 ] |
Km |
13,700,000 |
3.500 Width (m) |
961.000 Earth fill m3 |
8,357,000 |
| Srae Prang |
2 |
201 |
Earth road |
0.12 [ 0.12 ] |
Km |
13,700,000 |
3.000 Width (m) |
144.000 Earth fill m3 |
1,575,500 |
| Rumchek |
3 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
13,700,000 |
3.500 Width (m) |
1,270.000 Earth fill m3 |
10,686,000 |
| Chhuk |
4 |
201 |
Earth road |
0.49 [ 0.49 ] |
Km |
13,700,000 |
3.000 Width (m) |
674.000 Earth fill m3 |
6,644,500 |
| Chhuk |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,026,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,026,000 |
| Rumchek |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,026,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,026,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,315,000 |
Cheung Prey, Khnaor Dambang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030301/08/01 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
36,340,000 |
| Knaor Dambang |
1 |
202 |
Laterite road |
1.93 [ 1.47 ] |
Km |
22,204,080 |
3.500 Width (m) |
1,013.000 Earth fill m3 |
32,639,998 |
| Knaor Dambang |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,850,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,339,998 |
Cheung Prey, Kouk Rovieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030302/08/01 |
TSO |
IM SARAN |
Project Type |
Irrigation |
25,500,000 |
| Ba Krong |
1 |
410 |
Earth dam |
0.75 [ 0.75 ] |
Km |
34,000,000 |
1.200 Max. height (m) |
4,299.000 Volume (m3) |
25,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,500,000 |
| Contract ID |
030302/08/02 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
20,925,000 |
| Ba Krong |
1 |
202 |
Laterite road |
0.70 [ 0.50 ] |
Km |
15,500,000 |
3.500 Width (m) |
367.500 Earth fill m3 |
7,750,000 |
| Totoul |
2 |
202 |
Laterite road |
0.70 [ 0.85 ] |
Km |
15,500,000 |
3.500 Width (m) |
367.500 Earth fill m3 |
13,175,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,925,000 |
Cheung Prey, Phdau Chum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030303/08/01 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
37,830,000 |
| Phdau Chum Lech |
1 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
22,142,860 |
4.000 Width (m) |
300.000 Earth fill m3 |
11,071,430 |
| Phdau Chum Kaeut |
2 |
202 |
Laterite road |
1.30 [ 0.90 ] |
Km |
22,142,860 |
4.000 Width (m) |
780.000 Earth fill m3 |
19,928,574 |
| Phdau Chum Lech |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,880,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,760,000 |
| Phdau Chum Kaeut |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,880,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,880,000 |
| Phdau Chum Lech |
5 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,190,000 |
0.400 |
0.000 |
1,190,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,830,004 |
Cheung Prey, Prey Char
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030304/08/01 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
21,285,700 |
| Siem Bay |
1 |
202 |
Laterite road |
0.40 [ 0.50 ] |
Km |
24,250,000 |
4.000 Width (m) |
240.000 Earth fill m3 |
12,125,000 |
| Prey Char Leu |
2 |
202 |
Laterite road |
0.60 [ 0.30 ] |
Km |
24,250,000 |
4.000 Width (m) |
360.000 Earth fill m3 |
7,275,000 |
| Siem Bay |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,885,700 |
0.600 Diameter (m) |
5.000 Length (m) |
1,885,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,285,700 |
| Contract ID |
030304/08/02 |
TSO |
IM SARAN |
Project Type |
Irrigation |
18,852,000 |
| Prey Char Knong |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
7,855,400 |
0.800 Diameter (m) |
6.000 Length (m) |
7,855,400 |
| Prey Char Knong |
2 |
420 |
Canal |
0.28 [ 0.28 ] |
Km |
39,273,571 |
1.600 Depth (m) |
1,599.000 Volume (m3) |
10,996,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,852,000 |
Cheung Prey, Pring Chrum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030305/08/01 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
32,500,000 |
| Pring Chum |
1 |
202 |
Laterite road |
1.00 [ 0.80 ] |
Km |
20,868,800 |
3.500 Width (m) |
525.000 Earth fill m3 |
16,695,040 |
| Trapeang Tuem |
2 |
202 |
Laterite road |
0.75 [ 0.70 ] |
Km |
20,868,800 |
3.500 Width (m) |
394.000 Earth fill m3 |
14,608,160 |
| Pring Chum |
3 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,196,800 |
0.400 |
0.000 |
1,196,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,500,000 |
Cheung Prey, Sampong Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030306/08/01 |
TSO |
IM SARAN |
Project Type |
Irrigation |
55,900,000 |
| Ampil Tvear |
1 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
34,900,000 |
1.400 Depth (m) |
5,070.000 Volume (m3) |
34,900,000 |
| Trapeang Chhuk |
2 |
420 |
Canal |
0.40 [ 0.40 ] |
Km |
34,900,000 |
1.400 Depth (m) |
2,142.000 Volume (m3) |
13,960,000 |
| Ampil Tvear |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
7,040,000 |
1.000 Diameter (m) |
5.000 Length (m) |
7,040,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
55,900,000 |
Cheung Prey, Sdaeung Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030307/08/01 |
TSO |
IM SARAN |
Project Type |
Irrigation |
40,600,000 |
| Sdaeung Chey |
1 |
420 |
Canal |
0.20 [ 0.20 ] |
Km |
203,000,000 |
1.000 Depth (m) |
6,035.000 Volume (m3) |
40,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,600,000 |
Cheung Prey, Soutip
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030308/08/01 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
46,000,000 |
| Sou Tip |
1 |
202 |
Laterite road |
1.62 [ 1.62 ] |
Km |
18,400,000 |
4.000 Width (m) |
848.000 Earth fill m3 |
29,716,000 |
| Thmei |
2 |
202 |
Laterite road |
0.89 [ 0.89 ] |
Km |
18,400,000 |
4.000 Width (m) |
431.000 Earth fill m3 |
16,284,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
46,000,000 |
Cheung Prey, Srama
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030309/08/01 |
TSO |
IM SARAN |
Project Type |
Rural Transport |
29,220,000 |
| Pra Theat |
1 |
201 |
Earth road |
0.00 [ 0.00 ] |
Km |
0 |
0.000 Width (m) |
0.000 Earth fill m3 |
0 |
| Pra Theat |
2 |
201 |
Earth road |
0.77 [ 0.57 ] |
Km |
27,200,000 |
4.000 Width (m) |
2,302.000 Earth fill m3 |
15,504,000 |
| Sangkae Pong |
3 |
201 |
Earth road |
0.33 [ 0.33 ] |
Km |
27,200,000 |
4.000 Width (m) |
1,071.000 Earth fill m3 |
8,976,000 |
| Pra Theat |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,370,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,370,000 |
| Sangkae Pong |
5 |
211 |
Single pipe culvert |
2.00 [ 1.00 ] |
Place |
2,370,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,370,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,220,000 |
| Contract ID |
030309/08/02 |
TSO |
IM SARAN |
Project Type |
Irrigation |
10,200,000 |
| Srah Angk Kam |
2 |
453 |
Double pipe culvert with gate |
1.00 [ 1.00 ] |
Place |
10,200,000 |
0.800 Diameter (m) |
5.000 Width (m) |
10,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
10,200,000 |
Cheung Prey, Trapeang Kor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030310/08/01 |
TSO |
IM SARAN |
Project Type |
Irrigation |
34,600,000 |
| S'ang |
1 |
420 |
Canal |
0.50 [ 0.50 ] |
Km |
21,925,920 |
1.200 Depth (m) |
1,317.000 Volume (m3) |
10,962,960 |
| Ang |
2 |
420 |
Canal |
0.85 [ 0.85 ] |
Km |
21,925,920 |
1.200 Depth (m) |
2,880.000 Volume (m3) |
18,637,032 |
| Ang |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
0.800 Diameter (m) |
5.000 Length (m) |
5,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,599,992 |
Dambae, Chong Cheach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030401/08/01 |
TSO |
Him huon |
Project Type |
Rural Transport |
43,000,000 |
| Cheach Thum |
1 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
45,312,500 |
3.500 Width (m) |
382.000 Earth fill m3 |
36,250,000 |
| Cheach Thum |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,250,000 |
0.600 Diameter (m) |
5.000 Length (m) |
6,750,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,000,000 |
Dambae, Dambae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030402/08/01 |
TSO |
Him huon |
Project Type |
Rural Transport |
43,500,000 |
| Trapeang Ruessei |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
21,750,000 |
4.000 Width (m) |
6,711.000 Earth fill m3 |
43,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,500,000 |
Dambae, Kouk Srok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030403/08/01 |
TSO |
Him huon |
Project Type |
Rural Transport |
43,569,000 |
| Chheu Teal Chrum |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
31,730,000 |
3.500 Width (m) |
682.000 Earth fill m3 |
41,249,000 |
| Chheu Teal Chrum |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,320,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,320,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,569,000 |
Dambae, Neang Teut
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030404/08/01 |
TSO |
Him huon |
Project Type |
Rural Transport |
40,152,000 |
| Khnor |
1 |
201 |
Earth road |
1.07 [ 0.97 ] |
Km |
37,644,320 |
4.000 Width (m) |
4,620.000 Earth fill m3 |
36,387,000 |
| Pongro |
2 |
201 |
Earth road |
0.10 [ 0.10 ] |
Km |
37,650,000 |
4.000 Width (m) |
199.000 Earth fill m3 |
3,765,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,152,000 |
Dambae, Seda
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030405/08/01 |
TSO |
Him huon |
Project Type |
Rural Transport |
49,350,000 |
| Chhung Ta Sau |
1 |
201 |
Earth road |
2.10 [ 2.10 ] |
Km |
23,500,000 |
4.000 Width (m) |
6,353.000 Earth fill m3 |
49,350,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,350,000 |
Dambae, Tuek Chrov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030406/08/01 |
TSO |
Him huon |
Project Type |
Rural Transport |
42,604,800 |
| Ph'av |
1 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
25,360,000 |
4.000 Width (m) |
4,226.000 Earth fill m3 |
34,236,000 |
| Khley |
2 |
201 |
Earth road |
0.43 [ 0.33 ] |
Km |
25,360,000 |
4.000 Width (m) |
1,089.000 Earth fill m3 |
8,368,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,604,800 |
| Contract ID |
030406/08/02 |
TSO |
Him huon |
Project Type |
Rural Transport |
28,660,000 |
| Srae Veaeng |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
20,780,000 |
4.000 Width (m) |
1,206.000 Earth fill m3 |
10,390,000 |
| Srae Veaeng |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
9,135,000 |
1.000 Diameter (m) |
6.000 Length (m) |
9,135,000 |
| Srae Veaeng |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
9,135,000 |
1.000 Diameter (m) |
7.000 Length (m) |
9,135,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,660,000 |
Dambae, Trapeang Pring
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030407/08/01 |
TSO |
Him huon |
Project Type |
Rural Transport |
39,600,000 |
| Srae Prang |
1 |
201 |
Earth road |
1.65 [ 1.65 ] |
Km |
22,000,000 |
4.000 Width (m) |
5,754.000 Earth fill m3 |
36,300,000 |
| Srae Prang |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,600,000 |
Kampong Cham, Boeng Kok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030501/08/01 |
TSO |
Kung mao |
Project Type |
Rural Transport |
39,132,000 |
| Boeng Kok Muoy |
1 |
201 |
Earth road |
1.36 [ 1.36 ] |
Km |
27,516,129 |
4.500 Width (m) |
3,714.000 Earth fill m3 |
37,532,000 |
| Boeng Kok Muoy |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,132,000 |
Kampong Cham, Kampong Cham
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030502/08/01 |
TSO |
Kung mao |
Project Type |
Urban Drainage and Flood Protection |
41,000,000 |
| Phum Prambei |
1 |
542 |
Foul water sewer |
1.00 [ 1.00 ] |
Line |
14,285,000 |
0.500 |
0.000 |
14,285,000 |
| Phum Prambuon |
2 |
542 |
Foul water sewer |
1.00 [ 1.00 ] |
Line |
18,980,000 |
0.600 |
0.000 |
18,980,000 |
| Phum Dabpram |
3 |
542 |
Foul water sewer |
1.00 [ 1.00 ] |
Line |
7,735,000 |
0.600 |
0.000 |
7,735,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,000,000 |
Kampong Cham, Sambuor Meas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030503/08/01 |
TSO |
Kung mao |
Project Type |
Rural Transport |
43,826,000 |
| Boeng Snay |
1 |
201 |
Earth road |
0.97 [ 0.97 ] |
Km |
43,397,739 |
4.500 Width (m) |
1,854.000 Earth fill m3 |
42,226,000 |
| Boeng Snay |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,600,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,826,000 |
Kampong Cham, Veal Vong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030504/08/01 |
TSO |
Kung mao |
Project Type |
Urban transport |
64,421,300 |
| Phum Pir |
1 |
201 |
Earth road |
0.10 [ 0.10 ] |
Km |
71,813,073 |
4.000 Width (m) |
516.000 Earth fill m3 |
7,181,307 |
| Phum Prammuoy |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,338 |
0.600 Diameter (m) |
7.000 Length (m) |
1,800,338 |
| Phum Buon |
3 |
201 |
Earth road |
0.51 [ 0.51 ] |
Km |
71,813,073 |
4.000 Width (m) |
630.000 Earth fill m3 |
36,552,854 |
| Phum Prammuoy |
4 |
201 |
Earth road |
0.26 [ 0.26 ] |
Km |
71,813,073 |
6.200 Width (m) |
1,063.000 Earth fill m3 |
18,886,838 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
64,421,338 |
| Contract ID |
030504/08/02 |
TSO |
Kung mao |
Project Type |
Urban transport |
14,100,000 |
| Phum Prammuoy |
1 |
541 |
Drain pipe for flood water |
1.00 [ 1.00 ] |
Line |
14,100,000 |
89.500 Length (m) |
0.600 Diameter (m) |
14,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,100,000 |
Kampong Siem, Ampil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030601/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
57,078,500 |
| Chonghuk |
1 |
201 |
Earth road |
2.33 [ 2.33 ] |
Km |
18,906,330 |
3.500 Width (m) |
2,743.000 Earth fill m3 |
44,070,655 |
| Veal Sbov |
2 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
18,906,330 |
4.000 Width (m) |
721.000 Earth fill m3 |
8,507,849 |
| Chonghuk |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
4.000 Length (m) |
3,000,000 |
| Veal Sbov |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
57,078,504 |
Kampong Siem, Han Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030602/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Irrigation |
35,332,000 |
| Moan Haeur |
1 |
410 |
Earth dam |
0.20 [ 0.20 ] |
Km |
143,887,500 |
2.270 Max. height (m) |
3,362.000 Volume (m3) |
28,777,500 |
| Moan Haeur |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
6,554,500 |
0.600 Diameter (m) |
10.000 Width (m) |
6,554,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,332,000 |
Kampong Siem, Kien Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030603/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
34,322,500 |
| Spean Thmei |
1 |
201 |
Earth road |
0.90 [ 0.90 ] |
Km |
18,269,600 |
4.000 Width (m) |
2,003.000 Earth fill m3 |
16,442,640 |
| Boeng Babos |
2 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
18,269,600 |
4.000 Width (m) |
2,250.000 Earth fill m3 |
14,615,680 |
| Boeng Babos |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,264,200 |
0.600 Diameter (m) |
6.000 Length (m) |
3,264,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,322,520 |
Kampong Siem, Kokor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030604/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
44,900,000 |
| Kokor Muoy |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
22,649,600 |
4.000 Width (m) |
3,079.000 Earth fill m3 |
22,649,600 |
| Kokor Pir |
2 |
201 |
Earth road |
0.92 [ 0.92 ] |
Km |
22,649,600 |
4.000 Width (m) |
2,817.000 Earth fill m3 |
20,724,384 |
| Kokor Muoy |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,526,016 |
0.600 Diameter (m) |
6.000 Length (m) |
1,526,016 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,900,000 |
Kampong Siem, Kaoh Mitt
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030605/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
39,750,000 |
| Kaoh Paen Kha |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
15,000,000 |
4.000 Width (m) |
2,107.000 Earth fill m3 |
15,000,000 |
| Svay Chrum |
2 |
201 |
Earth road |
1.65 [ 1.65 ] |
Km |
15,000,000 |
4.000 Width (m) |
3,476.000 Earth fill m3 |
24,750,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,750,000 |
Kampong Siem, Kaoh Roka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030606/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Drainage and Flood Protection |
38,400,000 |
| Kaoh Roka Knong |
1 |
561 |
River bank protection |
1.00 [ 1.00 ] |
Place |
38,400,000 |
13.500 Height (m) |
32.000 Length (m) |
38,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,400,000 |
Kampong Siem, Kaoh Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030607/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Irrigation |
39,700,000 |
| Phum Prambei |
1 |
251 |
Drift |
1.00 [ 1.00 ] |
Place |
39,700,000 |
40.000 Length (m) |
6.000 Width (m) |
39,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,700,000 |
Kampong Siem, Kaoh Tontuem
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030608/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
30,218,600 |
| Kaoh Kok Ka |
1 |
201 |
Earth road |
0.12 [ 0.12 ] |
Km |
120,335,800 |
4.000 Width (m) |
1,900.000 Earth fill m3 |
14,440,296 |
| Kaoh Kok Ka |
2 |
221 |
Single cell box culvert |
1.00 [ 1.00 ] |
Place |
15,778,300 |
2.000 Total Span (m) |
5.000 Width(m) |
15,778,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,218,596 |
Kampong Siem, Krala
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030609/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
41,399,400 |
| Trapeang Tras |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
25,950,000 |
4.000 Width (m) |
2,113.000 Earth fill m3 |
20,760,000 |
| Trapeang Tras |
2 |
201 |
Earth road |
0.73 [ 0.73 ] |
Km |
25,950,000 |
3.500 Width (m) |
1,020.000 Earth fill m3 |
19,047,300 |
| Trapeang Tras |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,592,100 |
0.600 Diameter (m) |
4.000 Length (m) |
1,592,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,399,400 |
Kampong Siem, Ou Svay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030610/08/01 |
TSO |
Kung mao |
Project Type |
Rural Transport |
23,665,000 |
| Ou Svay |
1 |
201 |
Earth road |
0.92 [ 0.92 ] |
Km |
16,597,826 |
4.000 Width (m) |
2,050.000 Earth fill m3 |
15,270,000 |
| Ou Svay |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
5,915,000 |
0.800 Diameter (m) |
5.000 Length (m) |
5,915,000 |
| Ou Svay |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,480,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,480,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,665,000 |
| Contract ID |
030610/08/02 |
TSO |
Kung mao |
Project Type |
Rural Domestic Water Supplies |
11,202,200 |
| Ampil Kranhanh |
1 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
5,601,125 |
60.000 Depth (m) |
100.000 Diameter (mm) |
5,601,125 |
| Trapeang Kak |
2 |
123 |
Drilled well with Afridev pump |
1.00 [ 1.00 ] |
Place |
5,601,125 |
60.000 Depth (m) |
100.000 Diameter (mm) |
5,601,125 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
11,202,250 |
Kampong Siem, Ro'ang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030611/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
44,112,900 |
| Pongro |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
34,980,000 |
4.000 Width (m) |
1,560.000 Earth fill m3 |
27,984,000 |
| Prasam |
2 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
34,980,000 |
4.000 Width (m) |
641.000 Earth fill m3 |
13,992,000 |
| Pongro |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,136,900 |
0.600 Diameter (m) |
6.000 Length (m) |
2,136,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,112,900 |
Kampong Siem, Rumchek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030612/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
14,161,600 |
| Thmei |
1 |
201 |
Earth road |
0.28 [ 0.28 ] |
Km |
51,124,910 |
4.000 Width (m) |
1,404.000 Earth fill m3 |
14,161,600 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,161,600 |
| Contract ID |
030612/08/02 |
TSO |
Ten Chan Thuoen |
Project Type |
Irrigation |
18,699,150 |
| Thmei |
1 |
420 |
Canal |
0.25 [ 0.25 ] |
Km |
74,796,600 |
1.590 Depth (m) |
2,300.000 Volume (m3) |
18,699,150 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,699,150 |
Kampong Siem, Srak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030613/08/01 |
TSO |
Kung mao |
Project Type |
Rural Transport |
35,084,100 |
| Lpeak |
1 |
201 |
Earth road |
0.47 [ 0.47 ] |
Km |
58,105,900 |
4.000 Width (m) |
3,077.000 Earth fill m3 |
27,484,091 |
| Lpeak |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
7,600,000 |
1.000 Diameter (m) |
5.000 Length (m) |
7,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,084,091 |
Kampong Siem, Trean
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030614/08/01 |
TSO |
Kung mao |
Project Type |
Rural Transport |
41,495,000 |
| Ta Khong |
1 |
202 |
Laterite road |
0.26 [ 0.26 ] |
Km |
24,125,000 |
3.500 Width (m) |
0.150 Earth fill m3 |
6,272,500 |
| Trean |
2 |
202 |
Laterite road |
0.42 [ 0.42 ] |
Km |
24,125,000 |
3.000 Width (m) |
0.150 Earth fill m3 |
10,180,750 |
| Paen |
3 |
202 |
Laterite road |
0.08 [ 0.08 ] |
Km |
24,125,000 |
3.000 Width (m) |
0.150 Earth fill m3 |
1,881,750 |
| Trapeang Ta Sokh |
4 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
17,984,090 |
2.500 Width (m) |
0.150 Earth fill m3 |
9,891,250 |
| Chrak Sdau |
5 |
202 |
Laterite road |
0.41 [ 0.41 ] |
Km |
32,362,810 |
2.500 Width (m) |
0.150 Earth fill m3 |
13,268,752 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,495,002 |
Kampong Siem, Vihear Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030615/08/01 |
TSO |
Ten Chan Thuoen |
Project Type |
Rural Transport |
47,800,000 |
| Prey Phdau |
1 |
201 |
Earth road |
0.90 [ 0.90 ] |
Km |
35,230,770 |
4.000 Width (m) |
1,385.000 Earth fill m3 |
31,707,693 |
| Andoung Svay |
2 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
35,230,770 |
4.000 Width (m) |
615.000 Earth fill m3 |
14,092,308 |
| Prey Phdau |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,800,001 |
Kang Meas, Angkor Ban
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030701/08/01 |
TSO |
Kheng Rattana |
Project Type |
Rural Transport |
36,980,000 |
| Angkor Ban Ti Prammuoy |
1 |
201 |
Earth road |
0.56 [ 0.56 ] |
Km |
43,000,000 |
4.000 Width (m) |
3,498.000 Earth fill m3 |
24,080,000 |
| Angkor Ban Ti Prampir |
2 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
43,000,000 |
4.000 Width (m) |
1,874.000 Earth fill m3 |
12,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,980,000 |
Kang Meas, Kang Ta Noeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030702/08/01 |
TSO |
Kheng Rattana |
Project Type |
Rural Transport |
55,570,000 |
| Phum Ti Prammuoy |
1 |
201 |
Earth road |
1.15 [ 1.15 ] |
Km |
23,154,167 |
4.000 Width (m) |
39,675.000 Earth fill m3 |
26,627,292 |
| Phum Ti Prampir |
2 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
23,154,170 |
4.000 Width (m) |
1,036.000 Earth fill m3 |
6,946,251 |
| Phum Ti Prambei |
3 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
23,154,170 |
5.000 Width (m) |
3,279.000 Earth fill m3 |
21,996,462 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
55,570,005 |
Kang Meas, Khchau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030703/08/01 |
TSO |
Kheng Rattana |
Project Type |
Irrigation |
45,540,000 |
| Varint Ti Pir |
1 |
420 |
Canal |
1.40 [ 1.40 ] |
Km |
32,528,572 |
1.500 Depth (m) |
6,891.000 Volume (m3) |
45,540,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,540,001 |
Kang Meas, Peam Chi Kang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030704/08/01 |
TSO |
Kheng Rattana |
Project Type |
Irrigation |
36,120,000 |
| Sambuor Meas Ka |
1 |
420 |
Canal |
0.51 [ 0.51 ] |
Km |
25,800,000 |
1.000 Depth (m) |
2,739.000 Volume (m3) |
13,158,000 |
| Sambuor Meas Kha |
2 |
420 |
Canal |
0.89 [ 0.89 ] |
Km |
25,800,000 |
1.000 Depth (m) |
4,782.000 Volume (m3) |
22,962,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,120,000 |
Kang Meas, Preaek Koy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030705/08/01 |
TSO |
Kheng Rattana |
Project Type |
Rural Transport |
40,360,000 |
| Me Sar |
1 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
40,360,000 |
4.000 Width (m) |
4,916.000 Earth fill m3 |
40,360,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,360,000 |
Kang Meas, Preaek Krabau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030706/08/01 |
TSO |
Kheng Rattana |
Project Type |
Irrigation |
37,620,000 |
| Preaek Krabau |
1 |
420 |
Canal |
0.15 [ 0.15 ] |
Km |
39,600,000 |
1.000 Depth (m) |
2,865.000 Volume (m3) |
5,940,000 |
| Preaek Andoung |
2 |
420 |
Canal |
0.80 [ 0.80 ] |
Km |
39,600,000 |
1.000 Depth (m) |
4,585.000 Volume (m3) |
31,680,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,620,000 |
| Contract ID |
030706/08/02 |
TSO |
Kheng Rattana |
Project Type |
Rural Drainage and Flood Protection |
20,000,000 |
| Peam Knong |
1 |
410 |
Earth dam |
0.40 [ 0.40 ] |
Km |
50,000,000 |
4.000 Max. height (m) |
2,371.000 Volume (m3) |
20,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,000,000 |
Kang Meas, Reay Pay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030707/08/01 |
TSO |
Kheng Rattana |
Project Type |
Rural Transport |
37,720,000 |
| Tuol Vihear |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
25,146,667 |
4.000 Width (m) |
4,249.000 Earth fill m3 |
37,720,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,720,001 |
Kang Meas, Roka ar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030708/08/01 |
TSO |
Kheng Rattana |
Project Type |
Irrigation |
61,000,000 |
| Svay Sranaoh Ti Muoy |
1 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
34,857,143 |
1.500 Depth (m) |
4,745.000 Volume (m3) |
34,857,143 |
| Preaek Liv Ti Muoy |
2 |
420 |
Canal |
0.75 [ 0.75 ] |
Km |
34,857,143 |
1.500 Depth (m) |
4,338.600 Volume (m3) |
26,142,857 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
61,000,000 |
Kang Meas, Roka Koy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030709/08/01 |
TSO |
Kheng Rattana |
Project Type |
Rural Transport |
35,000,000 |
| Damnak L'et |
1 |
201 |
Earth road |
2.40 [ 2.40 ] |
Km |
13,750,000 |
4.000 Width (m) |
5,242.000 Earth fill m3 |
33,000,000 |
| Damnak L'et |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,000,000 |
Kang Meas, Sdau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030710/08/01 |
TSO |
Kheng Rattana |
Project Type |
Irrigation |
54,000,000 |
| Lvea Leu |
1 |
561 |
River bank protection |
1.00 [ 1.00 ] |
Place |
54,000,000 |
2.000 Height (m) |
150.000 Length (m) |
54,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
54,000,000 |
Kang Meas, Sour Kong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030711/08/01 |
TSO |
Kheng Rattana |
Project Type |
Rural Transport |
36,390,000 |
| Kdei |
1 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
27,112,000 |
4.000 Width (m) |
5,384.000 Earth fill m3 |
33,890,000 |
| Kdei |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,390,000 |
Kaoh Soutin, Kampong Reab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030801/08/01 |
TSO |
Yem Savong |
Project Type |
Rural Transport |
38,400,000 |
| Kampong Sdei Knong |
1 |
201 |
Earth road |
0.85 [ 0.85 ] |
Km |
45,176,470 |
5.000 Width (m) |
4,804.000 Earth fill m3 |
38,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,400,000 |
Kaoh Soutin, Kaoh Soutin
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030802/08/01 |
TSO |
Yem Savong |
Project Type |
Rural Transport |
42,205,900 |
| Phum Pir |
1 |
201 |
Earth road |
0.14 [ 0.14 ] |
Km |
22,570,000 |
3.000 Width (m) |
713.000 Earth fill m3 |
3,159,800 |
| Phum Buon |
2 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
22,570,000 |
3.000 Width (m) |
1,973.000 Earth fill m3 |
18,146,280 |
| Phum Pram |
3 |
201 |
Earth road |
0.93 [ 0.93 ] |
Km |
22,570,000 |
3.000 Width (m) |
1,624.000 Earth fill m3 |
20,899,820 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,205,900 |
Kaoh Soutin, Lve
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030803/08/01 |
TSO |
Yem Savong |
Project Type |
Rural Transport |
39,000,000 |
| Damnak Svay |
1 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
26,000,000 |
5.000 Width (m) |
4,168.000 Earth fill m3 |
31,200,000 |
| Roka Kaong |
2 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
26,000,000 |
5.000 Width (m) |
1,042.000 Earth fill m3 |
7,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,000,000 |
Kaoh Soutin, Moha Leaph
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030804/08/01 |
TSO |
Yem Savong |
Project Type |
Rural Transport |
33,116,000 |
| Damnak Pring Lech |
1 |
201 |
Earth road |
0.34 [ 0.34 ] |
Km |
97,400,000 |
4.000 Width (m) |
3,801.000 Earth fill m3 |
33,116,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,116,000 |
Kaoh Soutin, Moha Khnhoung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030805/08/01 |
TSO |
Yem Savong |
Project Type |
Irrigation |
18,498,500 |
| Chong Khnhoung |
1 |
410 |
Earth dam |
0.35 [ 0.35 ] |
Km |
39,360,000 |
1.000 Max. height (m) |
1,840.000 Volume (m3) |
13,776,000 |
| Chong Khnhoung |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
4,722,500 |
0.600 Diameter (m) |
5.000 Width (m) |
4,722,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,498,500 |
| Contract ID |
030805/08/02 |
TSO |
Yem Savong |
Project Type |
Rural Transport |
23,257,000 |
| Mohasiek Leu |
1 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
53,642,500 |
3.000 Width (m) |
3,141.000 Earth fill m3 |
21,457,000 |
| Mohasiek Leu |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,257,000 |
Kaoh Soutin, Peam Prathnuoh
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030806/08/01 |
TSO |
Yem Savong |
Project Type |
Rural Transport |
42,000,000 |
| Krapeu Korm |
1 |
201 |
Earth road |
1.15 [ 1.15 ] |
Km |
36,521,740 |
3.500 Width (m) |
4,959.000 Earth fill m3 |
42,000,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,000,001 |
Kaoh Soutin, Pongro
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030807/08/01 |
TSO |
Yem Savong |
Project Type |
Rural Transport |
29,500,000 |
| Preaek Rumdeng Lech |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
59,000,000 |
3.000 Width (m) |
3,609.000 Earth fill m3 |
29,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,500,000 |
Kaoh Soutin, Preaek Ta Nong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030808/08/01 |
TSO |
Yem Savong |
Project Type |
Rural Transport |
33,000,000 |
| Preaek Ta Nong Pir |
1 |
201 |
Earth road |
0.75 [ 0.75 ] |
Km |
44,000,000 |
6.000 Width (m) |
2,981.000 Earth fill m3 |
33,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,000,000 |
Krouch Chhmar, Chhuk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030901/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
40,870,000 |
| Baray |
1 |
201 |
Earth road |
1.90 [ 1.90 ] |
Km |
17,300,000 |
4.000 Width (m) |
4,758.000 Earth fill m3 |
32,870,000 |
| Baray |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
4,000,000 |
0.800 Diameter (m) |
7.000 Length (m) |
8,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,870,000 |
Krouch Chhmar, Chumnik
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030902/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
44,000,000 |
| Preaek Ta Hok |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
14,666,670 |
2.500 Width (m) |
375.000 Earth fill m3 |
14,666,670 |
| Chumnik |
2 |
202 |
Laterite road |
1.20 [ 1.20 ] |
Km |
14,666,670 |
2.500 Width (m) |
450.000 Earth fill m3 |
17,600,004 |
| Svay Damnak |
3 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
14,666,670 |
2.500 Width (m) |
300.000 Earth fill m3 |
11,733,336 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,000,010 |
Krouch Chhmar, Kampong Treas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030903/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
39,104,600 |
| Phum Muoy |
1 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
31,283,680 |
3.500 Width (m) |
210.000 Earth fill m3 |
10,949,288 |
| Phum Pir |
2 |
202 |
Laterite road |
0.30 [ 0.30 ] |
Km |
31,283,680 |
3.500 Width (m) |
180.000 Earth fill m3 |
9,385,104 |
| Phum Bei |
3 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
31,283,680 |
3.500 Width (m) |
267.000 Earth fill m3 |
18,770,208 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,104,600 |
Krouch Chhmar, Kaoh Pir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030904/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
30,240,000 |
| Chuor Kandal |
1 |
205 |
Concrete road |
0.20 [ 0.20 ] |
Km |
151,200,000 |
3.000 Width (m) |
60.000 Earth fill m3 |
30,240,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,240,000 |
Krouch Chhmar, Krouch Chhmar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030905/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
39,500,000 |
| Khsach Prachheh Leu |
1 |
202 |
Laterite road |
1.60 [ 1.60 ] |
Km |
24,687,500 |
3.500 Width (m) |
945.000 Earth fill m3 |
39,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,500,000 |
Krouch Chhmar, Peus Muoy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030906/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
37,000,000 |
| Saoy Muoy |
1 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
26,428,570 |
5.000 Width (m) |
525.000 Earth fill m3 |
18,499,999 |
| Saoy Pir |
2 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
26,428,570 |
5.000 Width (m) |
525.000 Earth fill m3 |
18,499,999 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,999,998 |
Krouch Chhmar, Peus Pir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030907/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
35,359,000 |
| Tuol Sambatt |
1 |
202 |
Laterite road |
0.73 [ 0.73 ] |
Km |
37,220,000 |
5.000 Width (m) |
546.000 Earth fill m3 |
27,096,160 |
| Dei Doh |
2 |
202 |
Laterite road |
0.22 [ 0.22 ] |
Km |
37,220,000 |
5.000 Width (m) |
354.000 Earth fill m3 |
8,262,840 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,359,000 |
Krouch Chhmar, Preaek a Chi
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030908/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
37,123,000 |
| Phum Ti Prammuoy |
1 |
201 |
Earth road |
1.45 [ 1.45 ] |
Km |
22,151,517 |
4.000 Width (m) |
2,985.000 Earth fill m3 |
32,119,700 |
| Phum Ti Prammuoy |
2 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
5,003,300 |
0.800 Diameter (m) |
7.000 Length (m) |
5,003,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,123,000 |
Krouch Chhmar, Roka Khnaor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030909/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
43,300,000 |
| Phum Ti Prampir |
1 |
202 |
Laterite road |
1.30 [ 1.30 ] |
Km |
27,333,330 |
4.000 Width (m) |
780.000 Earth fill m3 |
35,533,329 |
| Phum Ti Prammuoy |
2 |
202 |
Laterite road |
0.20 [ 0.20 ] |
Km |
27,333,330 |
4.000 Width (m) |
120.000 Earth fill m3 |
5,466,666 |
| Phum Ti Prampir |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,300,000 |
0.600 Diameter (m) |
7.000 Length (m) |
2,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,299,995 |
Krouch Chhmar, Svay Khleang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030910/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
38,320,000 |
| Phum Ti Bei |
1 |
203 |
Gravel road |
0.33 [ 0.33 ] |
Km |
49,604,901 |
4.000 Width (m) |
196.000 Earth fill m3 |
16,220,803 |
| Phum Ti Buon |
2 |
203 |
Gravel road |
0.19 [ 0.19 ] |
Km |
49,604,901 |
4.000 Width (m) |
112.000 Earth fill m3 |
9,276,116 |
| Phum Ti Pram |
3 |
203 |
Gravel road |
0.20 [ 0.20 ] |
Km |
49,604,901 |
4.000 Width (m) |
120.000 Earth fill m3 |
9,920,980 |
| Phum Ti Bei |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,902,100 |
600.000 Diameter (m) |
7.000 Length (m) |
2,902,100 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,319,999 |
Krouch Chhmar, Trea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030911/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
40,040,000 |
| Kdol Leu |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
36,400,000 |
4.500 Width (m) |
1,013.000 Earth fill m3 |
40,040,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,040,000 |
Krouch Chhmar, Tuol Snuol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
030912/08/01 |
TSO |
Ly Khamchuor |
Project Type |
Rural Transport |
51,700,000 |
| Tuol Snuol |
1 |
201 |
Earth road |
1.95 [ 1.95 ] |
Km |
18,000,000 |
4.000 Width (m) |
3,258.000 Earth fill m3 |
35,100,000 |
| Tuol Ok |
2 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
18,000,000 |
4.000 Width (m) |
725.000 Earth fill m3 |
8,100,000 |
| Tuol Snuol |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,500,000 |
0.800 Diameter (m) |
7.000 Length (m) |
3,500,000 |
| Tuol Ok |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.600 Diameter (m) |
7.000 Length (m) |
2,500,000 |
| Tuol Snuol |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,500,000 |
0.600 Diameter (m) |
7.000 Length (m) |
2,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,700,000 |
Memot, Chan Mul
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031001/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
34,423,900 |
| Srae Ta Nong Kaeut |
1 |
201 |
Earth road |
0.78 [ 0.78 ] |
Km |
18,000,000 |
4.000 Width (m) |
2,243.000 Earth fill m3 |
14,076,000 |
| Srae Ta Nong Kaeut |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,697,900 |
0.600 Diameter (m) |
5.000 Length (m) |
3,697,900 |
| Ta Kaev |
3 |
201 |
Earth road |
0.93 [ 0.93 ] |
Km |
18,000,000 |
4.000 Width (m) |
2,390.000 Earth fill m3 |
16,650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,423,900 |
Memot, Choam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031002/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
56,000,000 |
| Leach Kraom |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
16,947,000 |
4.000 Width (m) |
3,869.000 Earth fill m3 |
25,420,500 |
| Leach Kraom |
2 |
223 |
Triple cell box culvert |
1.00 [ 1.00 ] |
Place |
30,579,500 |
2.000 Total Span (m) |
4.500 Width(m) |
30,579,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
56,000,000 |
Memot, Choam Kravien
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031003/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
42,925,000 |
| Prei |
1 |
201 |
Earth road |
2.13 [ 2.13 ] |
Km |
20,200,000 |
4.000 Width (m) |
6,891.000 Earth fill m3 |
42,925,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,925,000 |
Memot, Choam Ta Mau
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031004/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
38,302,600 |
| Choam Ta Mau Koet |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,463,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,463,000 |
| Choam Ta Mau Koet |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,491,300 |
0.800 Diameter (m) |
5.000 Length (m) |
6,982,600 |
| Ta Mau Khang Cheung |
3 |
201 |
Earth road |
0.68 [ 0.68 ] |
Km |
20,524,182 |
4.000 Width (m) |
2,284.000 Earth fill m3 |
13,956,444 |
| Ta Mau Khang Cheung |
4 |
201 |
Earth road |
0.73 [ 0.73 ] |
Km |
20,524,182 |
4.000 Width (m) |
1,905.000 Earth fill m3 |
14,900,556 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,302,600 |
Memot, Dar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031005/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
79,686,000 |
| Dar Lech |
1 |
201 |
Earth road |
0.47 [ 0.47 ] |
Km |
18,000,000 |
4.000 Width (m) |
1,150.000 Earth fill m3 |
8,460,000 |
| Dar Tboung |
2 |
201 |
Earth road |
0.28 [ 0.28 ] |
Km |
18,000,000 |
4.000 Width (m) |
423.000 Earth fill m3 |
5,040,000 |
| Dar Kandaol |
3 |
201 |
Earth road |
0.74 [ 0.74 ] |
Km |
18,000,000 |
4.000 Width (m) |
1,554.000 Earth fill m3 |
13,392,000 |
| Dar Kandaol |
4 |
201 |
Earth road |
0.33 [ 0.33 ] |
Km |
18,000,000 |
4.000 Width (m) |
504.000 Earth fill m3 |
5,994,000 |
| Chhngar Cheung |
5 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
18,000,000 |
4.000 Width (m) |
1,669.000 Earth fill m3 |
18,000,000 |
| Chhngar Kandal |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Chhngar Cheung |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Dar Kandaol |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
4.000 Length (m) |
2,400,000 |
| Triek |
9 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Dar Cheung |
10 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
6.000 Length (m) |
2,400,000 |
| Dar Tboung |
11 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Dar Lech |
12 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
5.000 Length (m) |
7,200,000 |
| Dar Kandaol |
13 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
10.000 Length (m) |
4,800,000 |
| Dar Kandaol |
14 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,400,000 |
6.000 Diameter (m) |
8.000 Length (m) |
2,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
79,686,000 |
Memot, Kampoan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031006/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
44,900,000 |
| Kampoan |
1 |
202 |
Laterite road |
3.00 [ 3.00 ] |
Km |
14,500,000 |
3.500 Width (m) |
2,601.000 Earth fill m3 |
43,500,000 |
| Kampoan |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,900,000 |
Memot, Memong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031007/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
35,415,000 |
| Triek |
1 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
20,900,000 |
4.000 Width (m) |
4,059.000 Earth fill m3 |
28,215,000 |
| Triek |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,300,000 |
| Triek |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
4,900,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,415,000 |
Memot, Memot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031008/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
55,633,000 |
| Chhngar Sala |
1 |
201 |
Earth road |
1.55 [ 1.55 ] |
Km |
17,841,500 |
4.000 Width (m) |
4,606.000 Earth fill m3 |
27,654,325 |
| Sangkom Mean Chey |
2 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
17,841,500 |
4.000 Width (m) |
1,908.000 Earth fill m3 |
8,028,675 |
| Chhngar Sala |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,350,000 |
0.600 Diameter (m) |
5.000 Length (m) |
7,050,000 |
| Chhngar Sala |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,400,000 |
| Sangkom Mean Chey |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,200,000 |
| Chhngar Sala |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
7,300,000 |
1.000 Diameter (m) |
5.000 Length (m) |
7,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
55,633,000 |
Memot, Rung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031010/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
41,199,800 |
| Chambak |
1 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
21,914,800 |
4.000 Width (m) |
1,727.000 Earth fill m3 |
17,531,840 |
| Doun Rodth Ti Pir |
2 |
201 |
Earth road |
1.08 [ 1.08 ] |
Km |
21,914,800 |
4.000 Width (m) |
2,821.000 Earth fill m3 |
23,667,984 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,199,824 |
Memot, Rumchek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031011/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
42,011,600 |
| Phnov |
1 |
201 |
Earth road |
1.69 [ 1.69 ] |
Km |
19,498,878 |
4.000 Width (m) |
5,038.000 Earth fill m3 |
33,011,600 |
| Phnov |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Phnov |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
7,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
7,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,011,600 |
Memot, Tramung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031013/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
49,829,000 |
| Chhuk |
1 |
201 |
Earth road |
0.35 [ 0.35 ] |
Km |
14,563,000 |
4.000 Width (m) |
1,041.000 Earth fill m3 |
5,097,050 |
| Choam Trav |
2 |
201 |
Earth road |
0.98 [ 0.98 ] |
Km |
14,563,000 |
4.000 Width (m) |
2,819.000 Earth fill m3 |
14,329,992 |
| Doung |
3 |
201 |
Earth road |
1.47 [ 1.47 ] |
Km |
14,563,000 |
4.000 Width (m) |
3,562.000 Earth fill m3 |
21,349,358 |
| Doung |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,294,800 |
0.600 Diameter (m) |
5.000 Length (m) |
2,294,800 |
| Choam Trav |
5 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
3,378,900 |
0.600 Diameter (m) |
5.000 Length (m) |
6,757,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,829,000 |
Memot, Tonlung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031014/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
43,673,500 |
| Kdol Phsar |
1 |
201 |
Earth road |
1.08 [ 1.08 ] |
Km |
18,500,000 |
4.000 Width (m) |
3,090.000 Earth fill m3 |
19,998,500 |
| Pong Tuek |
2 |
201 |
Earth road |
0.75 [ 0.75 ] |
Km |
18,500,000 |
4.000 Width (m) |
2,239.000 Earth fill m3 |
13,875,000 |
| Kdol Phsar |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,450,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,900,000 |
| Kdol Phsar |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,450,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,450,000 |
| Pong Tuek |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,450,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,450,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,673,500 |
Memot, Treak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031015/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
43,386,700 |
| Dak Por |
1 |
201 |
Earth road |
1.65 [ 1.65 ] |
Km |
19,367,000 |
4.000 Width (m) |
4,116.000 Earth fill m3 |
32,033,018 |
| Dak Por |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,294,800 |
0.600 Diameter (m) |
5.000 Length (m) |
4,589,600 |
| Dak Por |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,390,200 |
0.800 Diameter (m) |
6.000 Length (m) |
3,390,200 |
| Dak Por |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,373,900 |
0.600 Diameter (m) |
5.000 Length (m) |
3,373,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,386,718 |
Memot, Kokir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031016/08/01 |
TSO |
Mith Phally |
Project Type |
Rural Transport |
39,202,900 |
| Kokir Cheung |
1 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
21,395,000 |
4.000 Width (m) |
1,001.000 Earth fill m3 |
6,482,685 |
| Srae Poul |
2 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
21,395,000 |
4.000 Width (m) |
2,932.000 Earth fill m3 |
25,631,210 |
| Kokir Cheung |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,363,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,363,000 |
| Srae Poul |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,363,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,363,000 |
| Srae Poul |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,363,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,363,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,202,895 |
Ou Reang Ov, Ampil Ta Pok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031101/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
32,277,000 |
| Tuol Ta Lorb |
1 |
202 |
Laterite road |
0.71 [ 0.71 ] |
Km |
16,846,000 |
4.000 Width (m) |
803.000 Earth fill m3 |
12,011,198 |
| Mitt Ta Rach |
2 |
202 |
Laterite road |
0.73 [ 0.73 ] |
Km |
16,846,020 |
4.000 Width (m) |
820.000 Earth fill m3 |
12,263,903 |
| Pou Meas |
3 |
202 |
Laterite road |
0.48 [ 0.48 ] |
Km |
16,846,110 |
4.000 Width (m) |
536.000 Earth fill m3 |
8,001,902 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,277,003 |
Ou Reang Ov, Chak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031102/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
22,932,800 |
| Chak |
1 |
202 |
Laterite road |
0.10 [ 0.10 ] |
Km |
12,300,000 |
3.500 Width (m) |
85.000 Earth fill m3 |
1,230,000 |
| Trach Chrum |
2 |
202 |
Laterite road |
1.70 [ 1.70 ] |
Km |
12,300,000 |
3.500 Width (m) |
1,445.000 Earth fill m3 |
20,910,000 |
| Chak |
3 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
792,800 |
0.400 |
0.000 |
792,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,932,800 |
| Contract ID |
031102/08/02 |
TSO |
Doul Son |
Project Type |
Rural Transport |
19,264,000 |
| Chrouy Ph'ong |
1 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
12,842,730 |
4.000 Width (m) |
2,626.000 Earth fill m3 |
19,264,095 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,264,095 |
Ou Reang Ov, Damrel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031103/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
39,000,000 |
| Chrey Sokhom |
1 |
201 |
Earth road |
2.45 [ 2.45 ] |
Km |
15,918,370 |
5.000 Width (m) |
5,087.000 Earth fill m3 |
39,000,007 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,000,007 |
Ou Reang Ov, Kong Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031104/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
38,024,800 |
| Lekh Pir |
1 |
202 |
Laterite road |
0.28 [ 0.28 ] |
Km |
12,760,000 |
3.500 Width (m) |
147.000 Earth fill m3 |
3,572,800 |
| Tuol Ta Hao |
2 |
202 |
Laterite road |
2.70 [ 2.70 ] |
Km |
12,760,000 |
3.500 Width (m) |
1,418.000 Earth fill m3 |
34,452,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,024,800 |
| Contract ID |
031104/08/02 |
TSO |
Doul Son |
Project Type |
Rural Transport |
31,875,000 |
| Soeng |
1 |
202 |
Laterite road |
0.75 [ 0.75 ] |
Km |
42,500,000 |
4.000 Width (m) |
2,625.000 Earth fill m3 |
31,875,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,875,000 |
Ou Reang Ov, Mien
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031105/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
22,491,200 |
| Thma Samlieng |
1 |
202 |
Laterite road |
0.22 [ 0.22 ] |
Km |
12,800,000 |
3.500 Width (m) |
115.000 Earth fill m3 |
2,803,200 |
| Banteay Mien |
2 |
202 |
Laterite road |
1.06 [ 1.06 ] |
Km |
12,800,000 |
3.500 Width (m) |
557.000 Earth fill m3 |
13,568,000 |
| Kampul Serei |
3 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
12,800,000 |
3.500 Width (m) |
210.000 Earth fill m3 |
5,120,000 |
| Thma Samlieng |
4 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.400 |
0.000 |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,491,200 |
| Contract ID |
031105/08/02 |
TSO |
Doul Son |
Project Type |
Rural Transport |
41,509,700 |
| Thma Krachum |
1 |
202 |
Laterite road |
0.97 [ 0.97 ] |
Km |
35,550,000 |
4.000 Width (m) |
2,111.000 Earth fill m3 |
34,483,500 |
| Thma Krachum |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,582,000 |
0.800 Diameter (m) |
5.000 Length (m) |
2,582,000 |
| Thma Krachum |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,722,100 |
0.600 Diameter (m) |
5.000 Length (m) |
3,444,200 |
| Thma Krachum |
4 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.400 |
0.000 |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,509,700 |
Ou Reang Ov, Preah Theat
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031107/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
77,600,000 |
| Thmei Kandal |
1 |
202 |
Laterite road |
1.40 [ 1.40 ] |
Km |
27,018,860 |
4.000 Width (m) |
1,523.000 Earth fill m3 |
37,826,404 |
| Thmei Leu |
2 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
27,019,000 |
4.000 Width (m) |
435.000 Earth fill m3 |
10,807,600 |
| Preah Theat Thma Da |
3 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
27,018,860 |
4.000 Width (m) |
762.000 Earth fill m3 |
18,913,202 |
| Preah Theat Kandal |
4 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
27,018,670 |
4.000 Width (m) |
163.000 Earth fill m3 |
4,052,801 |
| Thmei Kandal |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,500,000 |
| Thmei Leu |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,500,000 |
| Thmei Kandal |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Preah Theat Thma Da |
8 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
77,600,007 |
Ou Reang Ov, Tuol Sophi
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031108/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
23,787,400 |
| Thmei |
1 |
202 |
Laterite road |
0.93 [ 0.93 ] |
Km |
11,717,930 |
3.000 Width (m) |
420.000 Earth fill m3 |
10,944,547 |
| Thmei |
2 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
11,717,930 |
3.000 Width (m) |
494.000 Earth fill m3 |
12,842,851 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,787,398 |
| Contract ID |
031108/08/02 |
TSO |
Doul Son |
Project Type |
Rural Transport |
24,799,100 |
| Chan Andaet |
1 |
201 |
Earth road |
1.21 [ 1.21 ] |
Km |
15,919,670 |
4.000 Width (m) |
2,816.000 Earth fill m3 |
19,262,801 |
| Boeng Phtil |
2 |
201 |
Earth road |
0.24 [ 0.24 ] |
Km |
15,919,670 |
4.000 Width (m) |
559.000 Earth fill m3 |
3,820,721 |
| Chan Andaet |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,715,560 |
0.600 Diameter (m) |
5.000 Length (m) |
1,715,560 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
24,799,082 |
Ponhea Kraek, Doun Tei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031202/08/01 |
TSO |
Chea Theng |
Project Type |
Rural Transport |
47,500,000 |
| Chhuk Sa |
1 |
202 |
Laterite road |
0.85 [ 0.85 ] |
Km |
23,750,000 |
3.500 Width (m) |
555.000 Earth fill m3 |
20,187,500 |
| Kouk Neavea |
2 |
202 |
Laterite road |
1.15 [ 1.15 ] |
Km |
23,750,000 |
3.500 Width (m) |
713.000 Earth fill m3 |
27,312,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
47,500,000 |
Ponhea Kraek, Kandaol Chrum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031204/08/01 |
TSO |
Chea Theng |
Project Type |
Rural Transport |
63,694,700 |
| Sduksombath |
1 |
202 |
Laterite road |
3.33 [ 3.33 ] |
Km |
15,540,000 |
3.500 Width (m) |
2,592.000 Earth fill m3 |
51,670,500 |
| Sduksombath |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,401,500 |
0.600 Diameter (m) |
5.000 Length (m) |
7,204,500 |
| Sduksombath |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,505,400 |
0.800 Diameter (m) |
5.000 Length (m) |
3,505,400 |
| Sduksombath |
5 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,314,300 |
0.400 |
0.000 |
1,314,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
63,694,700 |
Ponhea Kraek, Kaong Kang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031205/08/01 |
TSO |
Chea Theng |
Project Type |
Rural Transport |
50,799,300 |
| La |
1 |
202 |
Laterite road |
3.60 [ 3.60 ] |
Km |
14,110,920 |
3.500 Width (m) |
1,694.000 Earth fill m3 |
50,799,312 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,799,312 |
Ponhea Kraek, Popel
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031207/08/01 |
TSO |
Chea Theng |
Project Type |
Rural Drainage and Flood Protection |
65,616,000 |
| Stueng Cheung |
1 |
542 |
Foul water sewer |
1.00 [ 1.00 ] |
Line |
65,616,000 |
600.000 |
0.000 |
65,616,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
65,616,000 |
Ponhea Kraek, Trapeang Phlong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031208/08/01 |
TSO |
Chea Theng |
Project Type |
Rural Transport |
56,800,000 |
| Trapeang Phlong Pir |
1 |
202 |
Laterite road |
2.46 [ 2.46 ] |
Km |
22,249,289 |
3.500 Width (m) |
36,930.000 Earth fill m3 |
54,799,999 |
| Trapeang Phlong Pir |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
56,799,999 |
Ponhea Kraek, Veal Mlu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031209/08/01 |
TSO |
Chea Theng |
Project Type |
Rural Transport |
39,000,000 |
| Veal Mlu |
1 |
201 |
Earth road |
1.67 [ 1.67 ] |
Km |
22,195,560 |
4.000 Width (m) |
3,989.000 Earth fill m3 |
36,999,999 |
| Veal Mlu |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,999,999 |
Prey Chhor, Baray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031301/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
42,255,000 |
| Samnak Tboung |
1 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
15,650,000 |
4.000 Width (m) |
1,723.000 Earth fill m3 |
20,345,000 |
| Samnak Cheung |
2 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
15,650,000 |
4.000 Width (m) |
1,989.000 Earth fill m3 |
21,910,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,255,000 |
Prey Chhor, Boeng Nay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031302/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
59,000,000 |
| Trapeang Thum |
1 |
202 |
Laterite road |
0.54 [ 0.54 ] |
Km |
13,800,000 |
3.000 Width (m) |
209.000 Earth fill m3 |
7,383,000 |
| Chhuk Sa |
2 |
202 |
Laterite road |
1.57 [ 1.57 ] |
Km |
13,800,000 |
3.000 Width (m) |
614.000 Earth fill m3 |
21,666,000 |
| Kbal Damrei |
3 |
202 |
Laterite road |
0.73 [ 0.73 ] |
Km |
13,800,000 |
3.000 Width (m) |
244.000 Earth fill m3 |
10,005,000 |
| Boeng Nay |
4 |
202 |
Laterite road |
0.95 [ 0.95 ] |
Km |
13,800,000 |
3.000 Width (m) |
489.000 Earth fill m3 |
13,110,000 |
| Chhuk Sa |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,311,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,311,000 |
| Trapeang Thum |
6 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,175,000 |
0.400 |
0.000 |
1,175,000 |
| Kbal Damrei |
7 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,175,000 |
0.400 |
0.000 |
1,175,000 |
| Boeng Nay |
8 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,175,000 |
0.400 |
0.000 |
1,175,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
59,000,000 |
Prey Chhor, Chrey Vien
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031303/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
50,100,000 |
| Trapeang Ampil |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
16,700,000 |
4.000 Width (m) |
473.000 Earth fill m3 |
8,350,000 |
| Khvet Touch |
2 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
16,700,000 |
4.000 Width (m) |
898.000 Earth fill m3 |
15,865,000 |
| Klaeng Poar |
3 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
16,700,000 |
4.000 Width (m) |
1,181.000 Earth fill m3 |
20,875,000 |
| Tuol Bak Koam |
4 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
16,700,000 |
4.000 Width (m) |
283.000 Earth fill m3 |
5,010,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,100,000 |
Prey Chhor, Khvet Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031304/08/01 |
TSO |
Im Koy |
Project Type |
Irrigation |
33,500,000 |
| Ampil Thum |
1 |
420 |
Canal |
0.84 [ 0.84 ] |
Km |
34,642,860 |
2.160 Depth (m) |
3,707.000 Volume (m3) |
29,100,002 |
| Ampil Thum |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,750,000 |
0.600 Diameter (m) |
6.000 Length (m) |
1,750,000 |
| Ampil Thum |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,650,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,500,002 |
Prey Chhor, Kor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031305/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
35,350,000 |
| Trapeang Poun |
1 |
201 |
Earth road |
1.02 [ 1.02 ] |
Km |
32,500,000 |
4.000 Width (m) |
2,897.000 Earth fill m3 |
33,150,000 |
| Trapeang Poun |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,350,000 |
Prey Chhor, Krouch
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031306/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
36,500,000 |
| Prey Sak |
1 |
202 |
Laterite road |
1.05 [ 1.05 ] |
Km |
13,574,100 |
3.000 Width (m) |
380.000 Earth fill m3 |
14,252,805 |
| Krouch |
2 |
202 |
Laterite road |
0.90 [ 0.90 ] |
Km |
13,574,190 |
3.000 Width (m) |
327.000 Earth fill m3 |
12,203,197 |
| Samraong |
3 |
202 |
Laterite road |
0.68 [ 0.68 ] |
Km |
13,574,160 |
3.000 Width (m) |
337.000 Earth fill m3 |
9,244,003 |
| Krouch |
4 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
800,000 |
0.400 |
0.000 |
800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,500,005 |
Prey Chhor, Lvea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031307/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
38,000,000 |
| Sdok Antong |
1 |
202 |
Laterite road |
1.90 [ 1.90 ] |
Km |
16,119,150 |
3.000 Width (m) |
855.000 Earth fill m3 |
30,626,385 |
| Kok |
2 |
202 |
Laterite road |
0.45 [ 0.45 ] |
Km |
16,119,150 |
3.000 Width (m) |
474.000 Earth fill m3 |
7,253,618 |
| Sdok Antong |
3 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
120,000 |
0.400 |
0.000 |
120,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,000,003 |
Prey Chhor, Mien
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031308/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
49,115,000 |
| Kampong Samret |
1 |
201 |
Earth road |
2.70 [ 2.70 ] |
Km |
16,750,000 |
4.000 Width (m) |
5,188.000 Earth fill m3 |
45,225,000 |
| Kampong Samret |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,600,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,200,000 |
| Kampong Samret |
3 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
690,000 |
0.400 |
0.000 |
690,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,115,000 |
Prey Chhor, Prey Chhor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031309/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
55,600,000 |
| Sek Yum |
1 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
27,900,000 |
4.000 Width (m) |
1,094.000 Earth fill m3 |
16,740,000 |
| Sangkae |
2 |
202 |
Laterite road |
0.34 [ 0.34 ] |
Km |
27,900,000 |
3.000 Width (m) |
484.000 Earth fill m3 |
9,346,500 |
| Chres |
3 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
27,900,000 |
3.000 Width (m) |
1,003.000 Earth fill m3 |
27,900,000 |
| Sangkae |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,613,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,613,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
55,600,000 |
Prey Chhor, Sour Saen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031310/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
36,214,000 |
| Trapeang Reang |
1 |
202 |
Laterite road |
0.35 [ 0.35 ] |
Km |
21,910,000 |
3.000 Width (m) |
404.000 Earth fill m3 |
7,668,500 |
| Trapeang Tnaot |
2 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
21,910,000 |
3.000 Width (m) |
713.000 Earth fill m3 |
13,146,000 |
| Traeuy Ou |
3 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
21,910,000 |
3.000 Width (m) |
873.000 Earth fill m3 |
12,050,500 |
| Trapeang Tnaot |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,349,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,349,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,214,000 |
Prey Chhor, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031311/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
39,557,700 |
| Soudei |
1 |
201 |
Earth road |
1.26 [ 1.26 ] |
Km |
17,199,000 |
4.500 Width (m) |
2,047.000 Earth fill m3 |
21,722,337 |
| Svay Prey |
2 |
201 |
Earth road |
1.11 [ 1.04 ] |
Km |
17,199,000 |
4.500 Width (m) |
1,794.000 Earth fill m3 |
17,835,363 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,557,700 |
Prey Chhor, Srangae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031312/08/01 |
TSO |
Im Koy |
Project Type |
Irrigation |
33,488,000 |
| Trapeang Rung |
1 |
420 |
Canal |
0.10 [ 0.10 ] |
Km |
14,000,000 |
1.200 Depth (m) |
338.000 Volume (m3) |
1,400,000 |
| Ta Koch |
2 |
420 |
Canal |
2.29 [ 2.29 ] |
Km |
14,000,000 |
0.920 Depth (m) |
4,691.000 Volume (m3) |
32,088,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,488,000 |
Prey Chhor, Thma Pun
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031313/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
36,000,000 |
| Ou Ta thok |
1 |
201 |
Earth road |
2.04 [ 2.04 ] |
Km |
17,629,770 |
5.000 Width (m) |
3,251.000 Earth fill m3 |
35,999,990 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,999,990 |
Prey Chhor, Tong Rong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031314/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
35,500,000 |
| Samraong |
1 |
202 |
Laterite road |
0.65 [ 0.65 ] |
Km |
25,357,080 |
4.000 Width (m) |
782.000 Earth fill m3 |
16,482,102 |
| Preah Srok |
2 |
202 |
Laterite road |
0.53 [ 0.53 ] |
Km |
25,357,170 |
3.000 Width (m) |
664.000 Earth fill m3 |
13,439,300 |
| Tro Mukh Ti Muoy |
3 |
202 |
Laterite road |
0.22 [ 0.22 ] |
Km |
25,357,270 |
3.000 Width (m) |
275.000 Earth fill m3 |
5,578,599 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,500,002 |
Prey Chhor, Trapeang Preah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031315/08/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
53,600,000 |
| Kur |
1 |
201 |
Earth road |
1.10 [ 0.70 ] |
Km |
20,981,860 |
4.000 Width (m) |
2,487.000 Earth fill m3 |
14,687,302 |
| Ang |
2 |
201 |
Earth road |
0.79 [ 0.79 ] |
Km |
20,981,830 |
4.000 Width (m) |
1,780.000 Earth fill m3 |
16,512,700 |
| Kur |
3 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
6,350,000 |
1.000 Diameter (m) |
6.000 Length (m) |
12,700,000 |
| Ang |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
6,350,000 |
1.000 Diameter (m) |
6.000 Length (m) |
6,350,000 |
| Ang |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,350,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,350,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
53,600,002 |
Srei Santhor, Baray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031401/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
41,500,000 |
| Banteay |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
38,500,000 |
4.000 Width (m) |
1,716.000 Earth fill m3 |
19,250,000 |
| Sya Boeng Veaeng |
2 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
38,500,000 |
4.000 Width (m) |
1,716.000 Earth fill m3 |
19,250,000 |
| Sya Boeng Veaeng |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
1.000 Diameter (m) |
6.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,500,000 |
Srei Santhor, Chi Bal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031402/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
29,000,000 |
| Tang Krang |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,200,000 |
1.000 Diameter (m) |
5.000 Length (m) |
3,200,000 |
| Tang Krang |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,200,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,400,000 |
| Khyaong |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,200,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,400,000 |
| Slaeng |
4 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
4,333,334 |
0.800 Diameter (m) |
5.000 Length (m) |
13,000,002 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,000,002 |
Srei Santhor, Khnar Sa
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031403/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
25,000,000 |
| Treas |
1 |
210 |
Pipe culvert (general) |
2.00 [ 2.00 ] |
Place |
3,125,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,250,000 |
| Khnar Sa |
2 |
210 |
Pipe culvert (general) |
2.00 [ 2.00 ] |
Place |
3,125,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,250,000 |
| Ampil |
3 |
210 |
Pipe culvert (general) |
2.00 [ 2.00 ] |
Place |
3,125,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,250,000 |
| Angk |
4 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
3,125,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,125,000 |
| Kngaok |
5 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
3,125,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,125,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,000,000 |
Srei Santhor, Kaoh Andaet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031404/08/01 |
TSO |
Tep That |
Project Type |
Rural Drainage and Flood Protection |
33,700,800 |
| Krouch Saeuch |
1 |
420 |
Canal |
0.07 [ 0.07 ] |
Km |
481,440,000 |
1.550 Depth (m) |
5,635.000 Volume (m3) |
33,700,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,700,800 |
Srei Santhor, Mean Chey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031405/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
37,896,000 |
| Chey |
1 |
201 |
Earth road |
1.08 [ 1.08 ] |
Km |
35,056,430 |
3.500 Width (m) |
3,519.000 Earth fill m3 |
37,896,001 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,896,001 |
Srei Santhor, Pteah Kandal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031406/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
32,490,000 |
| Phteah Kandal Leu |
1 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
72,200,000 |
4.000 Width (m) |
3,249.000 Earth fill m3 |
32,490,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,490,000 |
Srei Santhor, Pram Yam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031407/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
30,400,000 |
| Cheung Doek |
1 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
26,333,333 |
3.500 Width (m) |
957.000 Earth fill m3 |
7,900,000 |
| Kdei Thkar |
2 |
201 |
Earth road |
0.28 [ 0.28 ] |
Km |
26,690,391 |
3.500 Width (m) |
763.000 Earth fill m3 |
7,500,000 |
| Chi Pray |
3 |
201 |
Earth road |
0.17 [ 0.17 ] |
Km |
44,910,179 |
3.500 Width (m) |
415.000 Earth fill m3 |
7,500,000 |
| Pram Yam |
4 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
24,752,470 |
3.500 Width (m) |
670.000 Earth fill m3 |
7,499,998 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,399,998 |
Srei Santhor, Preaek Dambouk
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031408/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
36,239,500 |
| Chong Boeng Knong |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
65,890,000 |
3.500 Width (m) |
3,540.000 Earth fill m3 |
36,239,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
36,239,500 |
Srei Santhor, Preaek Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031409/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
63,300,000 |
| Turi Kandal |
1 |
240 |
Concrete bridge (general) |
1.00 [ 1.00 ] |
Place |
63,300,000 |
4.000 |
6.000 |
63,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
63,300,000 |
Srei Santhor, Preaek Rumdeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031410/08/01 |
TSO |
Tep That |
Project Type |
Rural Drainage and Flood Protection |
42,515,300 |
| Kser |
1 |
420 |
Canal |
0.10 [ 0.10 ] |
Km |
425,153,000 |
1.500 Depth (m) |
7,082.000 Volume (m3) |
42,515,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,515,300 |
Srei Santhor, Ruessei Srok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031411/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
34,435,600 |
| Tnaot Leu |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
44,288,000 |
4.000 Width (m) |
2,200.000 Earth fill m3 |
22,144,000 |
| Tnaot Leu |
2 |
201 |
Earth road |
0.00 [ 0.00 ] |
Km |
0 |
0.000 Width (m) |
0.000 Earth fill m3 |
0 |
| Ruessei Srok |
3 |
201 |
Earth road |
0.20 [ 0.20 ] |
Km |
44,288,000 |
4.000 Width (m) |
1,340.000 Earth fill m3 |
8,857,600 |
| Tnaot Leu |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,434,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,434,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,435,600 |
Srei Santhor, Svay Pou
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031412/08/01 |
TSO |
Tep That |
Project Type |
Irrigation |
35,100,000 |
| Pou |
1 |
420 |
Canal |
0.30 [ 0.30 ] |
Km |
117,000,000 |
1.700 Depth (m) |
6,200.000 Volume (m3) |
35,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,100,000 |
Srei Santhor, Svay Sach Phnum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031413/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
33,800,000 |
| Svay Tboung |
1 |
201 |
Earth road |
0.10 [ 0.10 ] |
Km |
36,057,069 |
3.000 Width (m) |
200.000 Earth fill m3 |
3,605,707 |
| Svay Kandal |
2 |
201 |
Earth road |
0.25 [ 0.25 ] |
Km |
36,057,069 |
3.000 Width (m) |
611.000 Earth fill m3 |
9,050,324 |
| Svay Kraom |
3 |
201 |
Earth road |
0.42 [ 0.42 ] |
Km |
36,057,069 |
3.000 Width (m) |
1,236.000 Earth fill m3 |
15,143,969 |
| Svay Tboung |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,000,000 |
| Svay Kraom |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.800 Diameter (m) |
6.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,800,000 |
Srei Santhor, Tong Tralach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031414/08/01 |
TSO |
Tep That |
Project Type |
Rural Transport |
31,500,000 |
| Khting |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,625,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,625,000 |
| Tong Tralach |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,625,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,625,000 |
| Chonloat Dai |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
3,625,000 |
0.800 Diameter (m) |
5.000 Length (m) |
7,250,000 |
| Chonloat Dai |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
4,000,000 |
1.000 Diameter (m) |
7.000 Length (m) |
8,000,000 |
| Boeng Ting |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
9,000,000 |
1.000 Diameter (m) |
7.000 Length (m) |
9,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,500,000 |
Stueng Trang, areaks Tnaot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031501/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
42,000,000 |
| Areaks Tnaot |
1 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
30,487,800 |
3.000 Width (m) |
1,935.000 Earth fill m3 |
12,195,120 |
| Beak Anlung |
2 |
202 |
Laterite road |
0.42 [ 0.42 ] |
Km |
30,487,800 |
4.000 Width (m) |
852.000 Earth fill m3 |
12,804,876 |
| Areaks Tnaot |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
6,000,000 |
1.000 Diameter (m) |
6.000 Length (m) |
6,000,000 |
| Areaks Tnaot |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,000,000 |
| Beak Anlung |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
5,000,000 |
| Beak Anlung |
6 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.400 |
0.000 |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,999,996 |
Stueng Trang, Dang Kdar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031503/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
49,000,000 |
| Srae Rumduol |
1 |
202 |
Laterite road |
1.80 [ 1.80 ] |
Km |
27,222,220 |
4.000 Width (m) |
7,016.000 Earth fill m3 |
48,999,996 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,999,996 |
Stueng Trang, Khpob Ta Nguon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031504/08/01 |
TSO |
Mem vibol |
Project Type |
Irrigation |
35,000,000 |
| Ou Run |
1 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
35,000,000 |
1.300 Depth (m) |
6,664.000 Volume (m3) |
35,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,000,000 |
Stueng Trang, Me Sar Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031505/08/01 |
TSO |
Mem vibol |
Project Type |
Irrigation |
51,620,000 |
| Ou Beng |
1 |
410 |
Earth dam |
0.53 [ 0.53 ] |
Km |
82,832,080 |
1.400 Max. height (m) |
5,125.000 Volume (m3) |
43,901,002 |
| Ou Beng |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
7,719,000 |
1.000 Diameter (m) |
8.000 Width (m) |
7,719,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,620,002 |
Stueng Trang, Ou Mlu
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031506/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
39,500,000 |
| Ou Kab Moan |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
36,500,000 |
4.000 Width (m) |
4,368.000 Earth fill m3 |
36,500,000 |
| Ou Kab Moan |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,000,000 |
0.600 Diameter (m) |
6.000 Length (m) |
3,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
39,500,000 |
Stueng Trang, Peam Kaoh Sna
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031507/08/01 |
TSO |
Mem vibol |
Project Type |
Irrigation |
41,999,000 |
| Dei Leu |
1 |
420 |
Canal |
0.20 [ 0.20 ] |
Km |
209,995,000 |
1.500 Depth (m) |
7,870.000 Volume (m3) |
41,999,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,999,000 |
Stueng Trang, Preah Andoung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031508/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
27,600,000 |
| Preaek Sdei |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
27,600,000 |
4.000 Width (m) |
1,670.000 Earth fill m3 |
27,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,600,000 |
Stueng Trang, Preaek Bak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031509/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
42,500,000 |
| Preaek Kak |
2 |
202 |
Laterite road |
1.40 [ 1.40 ] |
Km |
25,000,000 |
3.000 Width (m) |
3,378.000 Earth fill m3 |
35,000,000 |
| Preaek Bak |
3 |
202 |
Laterite road |
0.15 [ 0.15 ] |
Km |
25,000,000 |
4.000 Width (m) |
507.000 Earth fill m3 |
3,750,000 |
| Preaek Bak |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
3,500,000 |
0.600 Diameter (m) |
6.000 Length (m) |
3,500,000 |
| Preaek Kak |
5 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
250,000 |
0.400 |
0.000 |
250,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
42,500,000 |
Stueng Trang, Preaek Kak
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031510/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
69,591,600 |
| Meakh Pir |
1 |
202 |
Laterite road |
1.45 [ 1.45 ] |
Km |
43,286,030 |
4.000 Width (m) |
9,736.000 Earth fill m3 |
62,591,599 |
| Meakh Pir |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
7.000 Length (m) |
6,000,000 |
| Meakh Pir |
3 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.400 |
0.000 |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
69,591,599 |
Stueng Trang, Soupheas
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031512/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
41,660,500 |
| Srab |
1 |
202 |
Laterite road |
1.00 [ 1.00 ] |
Km |
37,660,500 |
4.000 Width (m) |
3,848.000 Earth fill m3 |
37,660,500 |
| Srab |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
12.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,660,500 |
Stueng Trang, Tuol Preah Khleang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031513/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
32,450,000 |
| Ta Meung |
1 |
202 |
Laterite road |
0.60 [ 0.60 ] |
Km |
40,333,300 |
4.000 Width (m) |
2,828.000 Earth fill m3 |
24,199,980 |
| Ta Meung |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,000,000 |
1.000 Diameter (m) |
8.000 Length (m) |
4,000,000 |
| Ta Meung |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
7.000 Length (m) |
4,000,000 |
| Ta Meung |
4 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
250,020 |
0.400 |
0.000 |
250,020 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,450,000 |
Stueng Trang, Tuol Sambuor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031514/08/01 |
TSO |
Mem vibol |
Project Type |
Rural Transport |
26,760,800 |
| Poun |
1 |
202 |
Laterite road |
0.31 [ 0.31 ] |
Km |
42,954,660 |
4.000 Width (m) |
1,158.000 Earth fill m3 |
13,358,899 |
| Tuol Sambuor |
2 |
202 |
Laterite road |
0.31 [ 0.31 ] |
Km |
42,954,730 |
4.000 Width (m) |
1,158.000 Earth fill m3 |
13,401,876 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,760,775 |
Tboung Khmum, Anhchaeum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031601/08/01 |
TSO |
Ven Vorn |
Project Type |
Irrigation |
49,434,200 |
| Ae Out |
1 |
420 |
Canal |
0.93 [ 0.93 ] |
Km |
36,617,900 |
1.300 Depth (m) |
5,610.000 Volume (m3) |
33,981,411 |
| Ponley Phsar |
2 |
420 |
Canal |
0.42 [ 0.42 ] |
Km |
36,617,900 |
1.300 Depth (m) |
3,654.000 Volume (m3) |
15,452,754 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,434,165 |
Tboung Khmum, Boeng Pruol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031602/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
73,000,000 |
| Boeng Kambaor |
1 |
202 |
Laterite road |
1.50 [ 1.50 ] |
Km |
28,947,370 |
3.500 Width (m) |
2,921.000 Earth fill m3 |
43,421,055 |
| Speam Chheu |
2 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
28,947,370 |
3.500 Width (m) |
790.000 Earth fill m3 |
11,578,948 |
| Boeng Kambaor |
3 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
17,000,000 |
3.850 Total Span (m) |
4.000 Width(m) |
17,000,000 |
| Speam Chheu |
4 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.400 |
0.000 |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
73,000,003 |
Tboung Khmum, Chikor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031604/08/01 |
TSO |
Doul Son |
Project Type |
Irrigation |
50,850,000 |
| Slaeng |
1 |
420 |
Canal |
1.50 [ 1.50 ] |
Km |
33,900,000 |
0.950 Depth (m) |
4,835.000 Volume (m3) |
50,850,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
50,850,000 |
Tboung Khmum, Chirou Muoy
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031605/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
38,878,000 |
| Chirou Kraom Muoy |
1 |
202 |
Laterite road |
0.18 [ 0.18 ] |
Km |
27,380,000 |
3.500 Width (m) |
285.000 Earth fill m3 |
4,873,640 |
| Chirou Leu |
2 |
202 |
Laterite road |
0.95 [ 0.95 ] |
Km |
27,380,000 |
3.500 Width (m) |
677.000 Earth fill m3 |
26,011,000 |
| Chirou Kandal |
3 |
202 |
Laterite road |
0.25 [ 0.25 ] |
Km |
27,380,000 |
3.500 Width (m) |
242.000 Earth fill m3 |
6,845,000 |
| Chirou Leu |
4 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,148,300 |
4.000 |
0.000 |
1,148,300 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,877,940 |
Tboung Khmum, Chirou Pir
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031606/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
48,277,700 |
| Mream Teak |
1 |
201 |
Earth road |
1.07 [ 1.07 ] |
Km |
28,100,000 |
4.000 Width (m) |
2,591.000 Earth fill m3 |
30,123,200 |
| Tuol Ponley |
2 |
201 |
Earth road |
0.47 [ 0.47 ] |
Km |
28,100,000 |
4.000 Width (m) |
904.000 Earth fill m3 |
13,207,000 |
| Mream Teak |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,473,750 |
0.600 Diameter (m) |
5.000 Length (m) |
2,473,750 |
| Tuol Ponley |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,473,750 |
0.600 Diameter (m) |
5.000 Length (m) |
2,473,750 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,277,700 |
Tboung Khmum, Chob
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031608/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
52,800,000 |
| Slab Kdaong |
1 |
201 |
Earth road |
0.69 [ 0.69 ] |
Km |
19,200,000 |
4.000 Width (m) |
1,602.000 Earth fill m3 |
13,248,000 |
| Chrak Chambak |
2 |
201 |
Earth road |
1.26 [ 1.26 ] |
Km |
19,200,000 |
4.000 Width (m) |
2,018.000 Earth fill m3 |
24,192,000 |
| Tuol Trea Cheung |
3 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
19,200,000 |
4.000 Width (m) |
1,281.000 Earth fill m3 |
15,360,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
52,800,000 |
Tboung Khmum, Kor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031612/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
44,366,400 |
| Damnak Popel |
1 |
201 |
Earth road |
0.55 [ 0.55 ] |
Km |
17,064,000 |
4.000 Width (m) |
1,058.000 Earth fill m3 |
9,385,200 |
| Seh |
2 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
17,064,000 |
4.000 Width (m) |
828.000 Earth fill m3 |
7,678,800 |
| sambuor |
3 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
17,064,000 |
4.000 Width (m) |
1,069.000 Earth fill m3 |
17,064,000 |
| Tep Nimitt |
4 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
17,064,000 |
4.000 Width (m) |
714.000 Earth fill m3 |
10,238,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
44,366,400 |
Tboung Khmum, Lngieng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031613/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
28,270,200 |
| Lvea Thum |
1 |
201 |
Earth road |
0.71 [ 0.71 ] |
Km |
18,550,000 |
4.000 Width (m) |
1,565.000 Earth fill m3 |
13,133,400 |
| Khien Chak |
2 |
201 |
Earth road |
0.61 [ 0.61 ] |
Km |
18,550,000 |
4.000 Width (m) |
1,693.000 Earth fill m3 |
11,296,950 |
| Kokir |
3 |
201 |
Earth road |
0.21 [ 0.21 ] |
Km |
18,550,000 |
4.000 Width (m) |
474.000 Earth fill m3 |
3,839,850 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,270,200 |
Tboung Khmum, Moung Riev
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031614/08/01 |
TSO |
Doul Son |
Project Type |
Rural Transport |
41,659,700 |
| Thnong |
1 |
202 |
Laterite road |
1.20 [ 1.20 ] |
Km |
16,166,000 |
4.000 Width (m) |
1,076.000 Earth fill m3 |
19,318,370 |
| Chi Peang |
2 |
202 |
Laterite road |
0.99 [ 0.99 ] |
Km |
16,165,960 |
4.000 Width (m) |
892.000 Earth fill m3 |
16,004,300 |
| Trapeang Snao |
3 |
202 |
Laterite road |
0.39 [ 0.39 ] |
Km |
16,166,000 |
4.000 Width (m) |
353.000 Earth fill m3 |
6,337,072 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,659,742 |
Tboung Khmum, Peam Chileang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031615/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
41,856,900 |
| Kampong Chanloh Lech |
1 |
202 |
Laterite road |
1.10 [ 1.10 ] |
Km |
31,850,000 |
3.500 Width (m) |
2,453.000 Earth fill m3 |
35,035,000 |
| Kampong Chanloh Kaeut |
2 |
202 |
Laterite road |
0.17 [ 0.17 ] |
Km |
31,850,000 |
3.500 Width (m) |
289.000 Earth fill m3 |
5,541,900 |
| Kampong Chanloh Lech |
3 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
1,280,000 |
0.400 |
0.000 |
1,280,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,856,900 |
Tboung Khmum, Roka Po Pram
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031616/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
71,142,400 |
| Trapeang Ruessei |
1 |
201 |
Earth road |
1.85 [ 1.85 ] |
Km |
23,384,990 |
4.000 Width (m) |
4,597.000 Earth fill m3 |
43,145,307 |
| Chong Ou |
2 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
23,385,000 |
4.000 Width (m) |
1,288.000 Earth fill m3 |
11,692,500 |
| Trapeang Ruessei |
3 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
11,752,600 |
1.000 Diameter (m) |
6.000 Length (m) |
11,752,600 |
| Trapeang Ruessei |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,276,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,276,000 |
| Chong Ou |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,276,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,276,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
71,142,407 |
Tboung Khmum, Sralab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031618/08/01 |
TSO |
Ven Vorn |
Project Type |
Irrigation |
54,810,000 |
| Trapeang Dom |
1 |
420 |
Canal |
0.09 [ 0.09 ] |
Km |
471,000,000 |
1.600 Depth (m) |
7,247.000 Volume (m3) |
42,390,000 |
| Trapeang Dom |
2 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
6,210,000 |
0.600 Diameter (m) |
6.000 Width (m) |
12,420,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
54,810,000 |
Tboung Khmum, Suong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031619/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
59,502,300 |
| Pou Kel |
1 |
201 |
Earth road |
0.64 [ 0.64 ] |
Km |
24,090,060 |
4.000 Width (m) |
1,629.000 Earth fill m3 |
15,513,999 |
| Toung |
2 |
201 |
Earth road |
1.83 [ 1.83 ] |
Km |
24,089,980 |
4.000 Width (m) |
3,094.000 Earth fill m3 |
43,988,303 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
59,502,302 |
Tboung Khmum, Thma Pechr
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031621/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
46,000,000 |
| Thma Pech Ti Bei |
1 |
201 |
Earth road |
1.66 [ 1.66 ] |
Km |
17,307,690 |
4.000 Width (m) |
3,298.000 Earth fill m3 |
28,799,996 |
| Thma Pech Ti Bei |
2 |
222 |
Double cell box culvert |
1.00 [ 1.00 ] |
Place |
17,200,000 |
3.850 Total Span (m) |
4.000 Width(m) |
17,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
45,999,996 |
Tboung Khmum, Tonle Bet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031622/08/01 |
TSO |
Ven Vorn |
Project Type |
Irrigation |
40,231,500 |
| Chrouy Sralau |
1 |
415 |
Irrigation reservoir |
1.00 [ 1.00 ] |
place |
22,472,558 |
1.300 depth |
4,420.000 maximum volume (m3) |
22,472,558 |
| Chrouy Sralau |
2 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
6,200,000 |
0.600 Diameter (m) |
6.000 Width (m) |
12,400,000 |
| Chrouy Sralau |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
5,359,000 |
1.000 Diameter (m) |
6.000 Length (m) |
5,359,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
40,231,558 |
| Contract ID |
031622/08/02 |
TSO |
Ven Vorn |
Project Type |
Irrigation |
20,386,000 |
| Doun Mau Kraom |
1 |
420 |
Canal |
0.66 [ 0.66 ] |
Km |
24,780,500 |
1.000 Depth (m) |
2,153.000 Volume (m3) |
16,355,130 |
| Doun Mau Kraom |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
4,030,900 |
0.600 Diameter (m) |
5.000 Length (m) |
4,030,900 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,386,030 |
Tboung Khmum, Vihear Luong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031623/08/01 |
TSO |
Ven Vorn |
Project Type |
Rural Transport |
51,240,000 |
| Thmei |
1 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
16,800,000 |
4.000 Width (m) |
1,922.000 Earth fill m3 |
20,160,000 |
| Cheung Voat |
2 |
201 |
Earth road |
0.45 [ 0.45 ] |
Km |
16,800,000 |
4.000 Width (m) |
721.000 Earth fill m3 |
7,560,000 |
| Veal Char |
3 |
201 |
Earth road |
0.30 [ 0.30 ] |
Km |
16,800,000 |
4.000 Width (m) |
338.000 Earth fill m3 |
5,040,000 |
| Prasrae Kraom |
4 |
201 |
Earth road |
1.10 [ 1.10 ] |
Km |
16,800,000 |
4.000 Width (m) |
1,239.000 Earth fill m3 |
18,480,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
51,240,000 |