Contract Outputs
Location: Koh Kong \ Botum Sakor Budget Year: 2008
Botum Sakor
Kiri Sakor
Kaoh Kong
Smach Mean Chey
Mondol Seima
Srae Ambel
Thma Bang
Kampong Seila
Botum Sakor, Andoung Tuek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
090101/08/01 |
TSO |
Ouk Sam ath |
Project Type |
Rural Transport |
21,397,700 |
| Chi Treh |
1 |
202 |
Laterite road |
0.88 [ 0.88 ] |
Km |
24,426,600 |
4.000 Width (m) |
959.770 Earth fill m3 |
21,397,702 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,397,702 |
Botum Sakor, Kandaol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
090102/08/01 |
TSO |
Ouk Sam ath |
Project Type |
Agriculture |
49,900,000 |
| Tam Kan |
1 |
1313 |
Construct/rehabilitate salt dam or dikes protection |
0.88 [ 0.88 ] |
Km |
56,704,540 |
1.000 Depth (m) |
200.000 Rice field (hictares) |
49,899,995 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
49,899,995 |
Botum Sakor, Thma Sa
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
090104/08/01 |
TSO |
Ouk Sam ath |
Project Type |
Rural Transport |
9,370,000 |
| Thma Sa |
1 |
240 |
Concrete bridge (general) |
1.00 [ 1.00 ] |
Place |
9,370,000 |
8.800 |
2.500 |
9,370,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,370,000 |
| Contract ID |
090104/08/03 |
TSO |
Ouk Sam ath |
Project Type |
Rural Transport |
30,820,000 |
| Thma Sa |
1 |
230 |
Wood bridge (general) |
1.00 [ 1.00 ] |
Place |
30,820,000 |
9.000 Total Span (m) |
3.500 Width(m) |
30,820,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,820,000 |