Contract Outputs

Location: Koh Kong \ Kaoh Kong Budget Year: 2008

Botum Sakor    Kiri Sakor    Kaoh Kong    Smach Mean Chey    Mondol Seima    Srae Ambel    Thma Bang    Kampong Seila   

Kaoh Kong, Chrouy Pras

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 090301/08/01 TSO KHUTH THANNARAK Project Type Rural Transport 25,572,200
Chrouy Pras 1 205 Concrete road 0.13 [ 0.13 ] Km 204,577,600 2.000 Width (m) 27.200 Earth fill m3 25,572,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,572,200

Kaoh Kong, Kaoh Kapi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 090302/08/01 TSO KHUTH THANNARAK Project Type Rural Transport 55,257,000
Kaoh Sralau 1 205 Concrete road 0.05 [ 0.05 ] Km 55,257,000 3.000 Width (m) 15.600 Earth fill m3 2,873,364
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,873,364

Kaoh Kong, Ta Tai Kraom

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 090303/08/01 TSO KHUTH THANNARAK Project Type Rural Transport 29,000,000
Anlong Vak 1 202 Laterite road 0.37 [ 0.37 ] Km 32,432,430 4.000 Width (m) 731.440 Earth fill m3 11,999,999
Anlong Vak 2 221 Single cell box culvert 1.00 [ 1.00 ] Place 17,000,000 2.000 Total Span (m) 4.500 Width(m) 17,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,999,999

Kaoh Kong, Trapeang Rung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 090304/08/01 TSO KHUTH THANNARAK Project Type Rural Transport 23,000,000
Trapeang Rung 1 202 Laterite road 0.84 [ 0.84 ] Km 27,380,950 4.000 Width (m) 921.380 Earth fill m3 22,999,998
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,999,998