Contract Outputs

Location: Koh Kong \ Kampong Seila Budget Year: 2008

Botum Sakor    Kiri Sakor    Kaoh Kong    Smach Mean Chey    Mondol Seima    Srae Ambel    Thma Bang    Kampong Seila   

Kampong Seila, Chamkar Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 090801/08/01 TSO Men Phally Project Type Rural Transport 28,327,000
Boeng Trach 1 202 Laterite road 0.63 [ 0.63 ] Km 30,306,980 4.000 Width (m) 691.030 Earth fill m3 19,093,397
Boeng Trach 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,380,500 0.600 Diameter (m) 5.000 Length (m) 2,380,500
Samdech Ta 3 202 Laterite road 0.22 [ 0.23 ] Km 29,667,100 4.000 Width (m) 252.000 Earth fill m3 6,853,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,326,998

Kampong Seila, Kampong Seila

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 090802/08/01 TSO Men Phally Project Type Rural Transport 20,000,000
Veal 1 202 Laterite road 0.74 [ 0.74 ] Km 27,210,880 4.000 Width (m) 806.200 Earth fill m3 19,999,997
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,999,997

Kampong Seila, Ou Bak Roteh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 090803/08/01 TSO Men Phally Project Type Rural Transport 31,593,000
Stueng Chral 1 202 Laterite road 1.03 [ 1.05 ] Km 30,088,571 4.000 Width (m) 1,141.000 Earth fill m3 31,593,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,593,000

Kampong Seila, Stueng Chhay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 090804/08/01 TSO Men Phally Project Type Rural Transport 32,300,000
Stueng Chhay Khang Cheung 1 222 Double cell box culvert 1.00 [ 1.00 ] Place 32,300,000 4.000 Total Span (m) 7.000 Width(m) 32,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,300,000