Contract Outputs
Location: Prey Veng \ Kanhchriech Budget Year: 2003
Ba Phnum
Kamchay Mear
Kampong Trabaek
Kanhchriech
Me Sang
Peam Chor
Peam Ro
Pea Reang
Preah Sdach
Prey Veaeng
Kampong Leav
Sithor Kandal
Kanhchriech, Chong Ampil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140401/03/01 |
TSO |
Ou Kolab |
Project Type |
Education |
32,445,000 |
| Prey Svay |
1 |
320 |
Brick school (general) |
2.00 [ 2.00 ] |
School room |
16,222,500 |
8.000 Length (m) |
9.000 Width (m) |
32,445,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,445,000 |
Kanhchriech, Kanhchriech
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140402/03/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
5,555,000 |
| Pou Mrenh |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,120,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,120,000 |
| Prasrae Mukh |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,120,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,120,000 |
| Kanhchriech |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,075,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,075,000 |
| Ou Ta Thok |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,120,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,240,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,555,000 |
Kanhchriech, Kdoeang Reay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140403/03/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
9,800,000 |
| Peanea Chuor |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Krouch |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,100,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,100,000 |
| Pou Touch |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Ta Nal |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,500,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,500,000 |
| Ampeang |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,200,000 |
0.800 Diameter (m) |
4.000 Length (m) |
2,200,000 |
| Boeng Anhchanh |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,800,000 |
Kanhchriech, Kouk Kong Kaeut
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140404/03/01 |
TSO |
Ou Kolab |
Project Type |
Rural Domestic Water Supplies |
18,340,000 |
| Srah Srang |
1 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Trapeang Ampil |
2 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Chey Muni |
3 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Tuk Srov |
4 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
2,640,000 |
| Chrey Mreak |
5 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 2.00 ] |
Place |
1,250,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
2,500,000 |
| Baek K'am |
6 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Bos Tnaot |
7 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Charchar |
8 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Ruessei Tonle |
9 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Trapeang Svay |
10 |
116 |
Add pump to existing ring well |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (m) |
1,320,000 |
| Kouk Krasang |
11 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Thma Tuek Dach |
12 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,320,000 |
50.000 Depth (m) |
100.000 Diameter (mm) |
1,320,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
18,340,000 |
Kanhchriech, Kouk Kong Lech
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140405/03/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
6,200,000 |
| Neak Ta Chey |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Trapeang Prasrae Lech |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,600,000 |
| Trapeang Pi |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,200,000 |
Kanhchriech, Preal
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140406/03/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
35,400,000 |
| Trapeang Kakaoh |
1 |
241 |
Concrete bridge, single span |
1.00 [ 1.00 ] |
Place |
26,824,000 |
6.000 Total Span (m) |
4.000 Width (m) |
26,824,000 |
| Trapeang Kakaoh |
2 |
201 |
Earth road |
0.11 [ 0.11 ] |
Km |
75,228,070 |
4.000 Width (m) |
1,072.000 Earth fill m3 |
8,576,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,400,000 |
Kanhchriech, Thma Pun
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140407/03/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
6,570,000 |
| Prey Char |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,060,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,120,000 |
| Kbal Damrei |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,165,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,165,000 |
| Preah Ent Smat |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,165,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,165,000 |
| Beng |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,060,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,120,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,570,000 |
Kanhchriech, Tnaot
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140408/03/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
5,920,000 |
| Khnay Kov |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Krala Meakh |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,520,000 |
0.600 Diameter (m) |
7.000 Length (m) |
1,520,000 |
| Kok |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,920,000 |