Location: Prey Veng \ Peam Ro Budget Year: 2003

Ba Phnum    Kamchay Mear    Kampong Trabaek    Kanhchriech    Me Sang    Peam Chor    Peam Ro    Pea Reang    Preah Sdach    Prey Veaeng    Kampong Leav    Sithor Kandal   

Peam Ro, Ba Baong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140701/03/01 TSO Chou SoCheat Project Type Irrigation 6,767,000
Chouk Chey 1 420 Canal 1.25 [ 1.25 ] Km 5,435,341 1.600 Depth (m) 2,162.000 Volume (m3) 6,767,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,767,000

Peam Ro, Banlich Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140702/03/01 TSO Chou SoCheat Project Type Rural Transport 872,000
Preaek Reang 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 872,000 0.600 Diameter (m) 4.000 Length (m) 872,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  872,000
Contract ID 140702/03/02 TSO Chou SoCheat Project Type Irrigation 22,602,200
Prasat Lech 1 420 Canal 1.63 [ 1.63 ] Km 13,866,380 1.200 Depth (m) 7,173.000 Volume (m3) 22,602,199
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,602,199

Peam Ro, Neak Loeang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140703/03/01 TSO Chou SoCheat Project Type Rural Transport 6,936,000
Stueng Slout 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,468,000 1.000 Diameter (m) 6.000 Length (m) 3,468,000
Stueng Santepheap 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,468,000 1.000 Diameter (m) 6.000 Length (m) 3,468,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,936,000

Peam Ro, Peam Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140704/03/01 TSO Chou SoCheat Project Type Irrigation 19,190,400
Banlich 1 420 Canal 0.82 [ 0.70 ] Km 27,414,857 2.000 Depth (m) 5,997.000 Volume (m3) 19,190,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,190,400
Contract ID 140704/03/02 TSO Chou SoCheat Project Type Social Interventions 5,248,000
Boeng K'aek 1 551 Flood refuge mound 1.00 [ 1.00 ] Place 5,248,000 1.000 Height (m) 1,200.000 Area (m2) 5,248,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,248,000

Peam Ro, Peam Ro

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140705/03/01 TSO Chou SoCheat Project Type Rural Transport 7,266,000
Chak Khlanh 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 872,000 0.600 Diameter (m) 4.000 Length (m) 1,744,000
Chak Khlanh 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,962,000 0.800 Diameter (m) 4.000 Length (m) 1,962,000
Thkov 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,404,000 1.000 Diameter (m) 8.000 Length (m) 2,404,000
Peam Kaoh 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,156,000 0.600 Diameter (m) 8.000 Length (m) 1,156,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,266,000

Peam Ro, Preaek Khsay Ka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140706/03/01 TSO Chou SoCheat Project Type Rural Transport 1,420,000
Otdam 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,420,000 0.800 Diameter (m) 6.000 Length (m) 1,420,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,420,000
Contract ID 140706/03/02 TSO Chou SoCheat Project Type Irrigation 1,949,600
Otdam 1 420 Canal 0.10 [ 0.10 ] Km 19,496,000 2.000 Depth (m) 615.000 Volume (m3) 1,949,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,949,600

Peam Ro, Preaek Khsay Kha

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140707/03/01 TSO Chou SoCheat Project Type Rural Transport 8,958,000
Phum Muoy 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,687,400 1.000 Diameter (m) 8.000 Length (m) 2,687,400
Phum Pir 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,791,600 1.000 Diameter (m) 6.000 Length (m) 3,583,200
Phum Bei 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,687,400 1.000 Diameter (m) 8.000 Length (m) 2,687,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,958,000

Peam Ro, Prey Kandieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140708/03/01 TSO Chou SoCheat Project Type Irrigation 30,096,200
Prey Khla 1 420 Canal 2.00 [ 2.00 ] Km 15,048,100 2.000 Depth (m) 9,408.000 Volume (m3) 30,096,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,096,200