Contract Outputs
Location: Prey Veng \ Pea Reang Budget Year: 2003
Ba Phnum
Kamchay Mear
Kampong Trabaek
Kanhchriech
Me Sang
Peam Chor
Peam Ro
Pea Reang
Preah Sdach
Prey Veaeng
Kampong Leav
Sithor Kandal
Pea Reang, Kampong Popil
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140801/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
7,590,000 |
| Tral |
1 |
410 |
Earth dam |
0.16 [ 0.16 ] |
Km |
46,851,850 |
1.500 Max. height (m) |
1,356.000 Volume (m3) |
7,590,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,590,000 |
Pea Reang, Kanhcham
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140802/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Education |
38,511,900 |
| Tonle Chrey |
1 |
321 |
Brick school with tile roof |
2.00 [ 2.00 ] |
School room |
17,569,500 |
16.000 Length (m) |
9.000 Width (m) |
35,139,000 |
| Tonle Chrey |
2 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
106,500 |
0.000 Students |
0.000 |
213,000 |
| Tonle Chrey |
3 |
740 |
School furniture |
48.00 [ 48.00 ] |
School room |
63,895 |
0.000 Students |
0.000 |
3,066,960 |
| Tonle Chrey |
4 |
740 |
School furniture |
2.00 [ 2.00 ] |
School room |
46,500 |
0.000 Students |
0.000 |
93,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
38,511,960 |
Pea Reang, Kampong Prang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140803/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Rural Domestic Water Supplies |
6,752,000 |
| Sambuor |
1 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 3.00 ] |
Place |
1,688,000 |
55.000 Depth (m) |
100.000 Diameter (mm) |
5,064,000 |
| Preaek Ta Roatn |
2 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,688,000 |
55.000 Depth (m) |
100.000 Diameter (mm) |
1,688,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
6,752,000 |
Pea Reang, Kampong Ruessei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140804/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
19,690,000 |
| Tnaot |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,130,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,260,000 |
| Chrey Krohuem |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,130,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,130,000 |
| Tnaot |
3 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
1,630,000 |
0.800 Diameter (m) |
5.000 Length (m) |
6,520,000 |
| Prey Meas |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,630,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,260,000 |
| Kampong Ruessei |
5 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,630,000 |
0.800 Diameter (m) |
5.000 Length (m) |
4,890,000 |
| Chrey Krohuem |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,630,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,630,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
19,690,000 |
| Contract ID |
140804/03/02 |
TSO |
Lim Sokhanan |
Project Type |
Rural Domestic Water Supplies |
8,444,200 |
| Chrey Krohuem |
1 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,688,850 |
55.000 Depth (m) |
100.000 Diameter (mm) |
1,688,850 |
| Tnaot |
2 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 2.00 ] |
Place |
1,688,850 |
55.000 Depth (m) |
100.000 Diameter (mm) |
3,377,700 |
| Prey Meas |
3 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,688,850 |
55.000 Depth (m) |
100.000 Diameter (mm) |
1,688,850 |
| Lvea |
4 |
121 |
Drilled well with VN no 6 pump |
2.00 [ 1.00 ] |
Place |
1,688,850 |
55.000 Depth (m) |
100.000 Diameter (mm) |
1,688,850 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,444,250 |
Pea Reang, Mesa Prachan
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140805/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
3,991,000 |
| Andoung |
1 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,991,000 |
1.000 Diameter (m) |
5.000 Length (m) |
3,991,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,991,000 |
| Contract ID |
140805/03/02 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
3,864,000 |
| Andoung |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,864,000 |
0.800 Diameter (m) |
4.000 Width (m) |
3,864,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,864,000 |
Pea Reang, Preaek Ta Sar
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140806/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
5,254,000 |
| Preaek Chhmuoh |
1 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
5,254,000 |
1.000 Diameter (m) |
5.000 Length (m) |
5,254,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
5,254,000 |
Pea Reang, Prey Pnov
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140807/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
7,966,500 |
| Prum |
1 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
2,655,500 |
0.800 Diameter (m) |
5.000 Length (m) |
5,311,000 |
| Prey Sla |
2 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,655,500 |
0.800 Diameter (m) |
5.000 Length (m) |
2,655,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
7,966,500 |
| Contract ID |
140807/03/02 |
TSO |
Lim Sokhanan |
Project Type |
Rural Domestic Water Supplies |
3,360,000 |
| Prey Sla |
1 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,680,000 |
55.000 Depth (m) |
100.000 Diameter (mm) |
1,680,000 |
| Sameakki |
2 |
121 |
Drilled well with VN no 6 pump |
1.00 [ 1.00 ] |
Place |
1,680,000 |
55.000 Depth (m) |
100.000 Diameter (mm) |
1,680,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
3,360,000 |
Pea Reang, Prey Sniet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140808/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
22,220,800 |
| Prey Sniet |
1 |
452 |
Single pipe Culvert with gate |
7.00 [ 7.00 ] |
Place |
3,174,400 |
0.600 Diameter (m) |
4.000 Width (m) |
22,220,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,220,800 |
| Contract ID |
140808/03/02 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
2,165,400 |
| Me Loung |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,082,700 |
0.600 Diameter (m) |
4.000 Length (m) |
2,165,400 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
2,165,400 |
Pea Reang, Prey Sralet
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140809/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
20,030,000 |
| Kok Thum |
1 |
452 |
Single pipe Culvert with gate |
3.00 [ 3.00 ] |
Place |
4,500,000 |
0.800 Diameter (m) |
4.000 Width (m) |
13,500,000 |
| Kok Touch |
2 |
452 |
Single pipe Culvert with gate |
2.00 [ 2.00 ] |
Place |
3,265,000 |
0.800 Diameter (m) |
4.000 Width (m) |
6,530,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
20,030,000 |
| Contract ID |
140809/03/02 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
15,450,000 |
| Chong Prey |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,050,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,050,000 |
| Prohut |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,400,000 |
| Chrey |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
4.000 Length (m) |
4,000,000 |
| Prey Sralet |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Chrey |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Prey Kralanh Thum |
6 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
4.000 Length (m) |
4,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,450,000 |
Pea Reang, Reab
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140810/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
17,600,000 |
| Chrey |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Pou Sabang |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Peareang |
3 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,300,000 |
0.800 Diameter (m) |
4.000 Length (m) |
3,300,000 |
| Peareang |
4 |
211 |
Single pipe culvert |
7.00 [ 7.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
7,000,000 |
| Prey Khla |
5 |
213 |
Triple pipe culvert |
1.00 [ 1.00 ] |
Place |
4,300,000 |
1.000 Diameter (m) |
5.000 Length (m) |
4,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
17,600,000 |
Pea Reang, Roka
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140811/03/01 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
9,399,000 |
| Tang Snay |
1 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,133,000 |
0.600 Diameter (m) |
4.000 Width (m) |
3,133,000 |
| Me Lob |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,133,000 |
0.600 Diameter (m) |
4.000 Width (m) |
3,133,000 |
| Trakiet |
3 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,133,000 |
0.600 Diameter (m) |
4.000 Width (m) |
3,133,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,399,000 |
| Contract ID |
140811/03/02 |
TSO |
Lim Sokhanan |
Project Type |
Rural Transport |
1,057,000 |
| Prey Sralanh |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,057,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,057,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
1,057,000 |