Contract Outputs

Location: Prey Veng \ Pea Reang Budget Year: 2003

Ba Phnum    Kamchay Mear    Kampong Trabaek    Kanhchriech    Me Sang    Peam Chor    Peam Ro    Pea Reang    Preah Sdach    Prey Veaeng    Kampong Leav    Sithor Kandal   

Pea Reang, Kampong Popil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140801/03/01 TSO Lim Sokhanan Project Type Irrigation 7,590,000
Tral 1 410 Earth dam 0.16 [ 0.16 ] Km 46,851,850 1.500 Max. height (m) 1,356.000 Volume (m3) 7,590,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,590,000

Pea Reang, Kanhcham

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140802/03/01 TSO Lim Sokhanan Project Type Education 38,511,900
Tonle Chrey 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 17,569,500 16.000 Length (m) 9.000 Width (m) 35,139,000
Tonle Chrey 2 740 School furniture 2.00 [ 2.00 ] School room 106,500 0.000 Students 0.000 213,000
Tonle Chrey 3 740 School furniture 48.00 [ 48.00 ] School room 63,895 0.000 Students 0.000 3,066,960
Tonle Chrey 4 740 School furniture 2.00 [ 2.00 ] School room 46,500 0.000 Students 0.000 93,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,511,960

Pea Reang, Kampong Prang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140803/03/01 TSO Lim Sokhanan Project Type Rural Domestic Water Supplies 6,752,000
Sambuor 1 121 Drilled well with VN no 6 pump 1.00 [ 3.00 ] Place 1,688,000 55.000 Depth (m) 100.000 Diameter (mm) 5,064,000
Preaek Ta Roatn 2 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 1,688,000 55.000 Depth (m) 100.000 Diameter (mm) 1,688,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,752,000

Pea Reang, Kampong Ruessei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140804/03/01 TSO Lim Sokhanan Project Type Rural Transport 19,690,000
Tnaot 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,130,000 0.600 Diameter (m) 5.000 Length (m) 2,260,000
Chrey Krohuem 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,130,000 0.600 Diameter (m) 5.000 Length (m) 1,130,000
Tnaot 3 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,630,000 0.800 Diameter (m) 5.000 Length (m) 6,520,000
Prey Meas 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,630,000 0.800 Diameter (m) 5.000 Length (m) 3,260,000
Kampong Ruessei 5 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,630,000 0.800 Diameter (m) 5.000 Length (m) 4,890,000
Chrey Krohuem 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,630,000 0.800 Diameter (m) 5.000 Length (m) 1,630,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,690,000
Contract ID 140804/03/02 TSO Lim Sokhanan Project Type Rural Domestic Water Supplies 8,444,200
Chrey Krohuem 1 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 1,688,850 55.000 Depth (m) 100.000 Diameter (mm) 1,688,850
Tnaot 2 121 Drilled well with VN no 6 pump 1.00 [ 2.00 ] Place 1,688,850 55.000 Depth (m) 100.000 Diameter (mm) 3,377,700
Prey Meas 3 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 1,688,850 55.000 Depth (m) 100.000 Diameter (mm) 1,688,850
Lvea 4 121 Drilled well with VN no 6 pump 2.00 [ 1.00 ] Place 1,688,850 55.000 Depth (m) 100.000 Diameter (mm) 1,688,850
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,444,250

Pea Reang, Mesa Prachan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140805/03/01 TSO Lim Sokhanan Project Type Rural Transport 3,991,000
Andoung 1 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,991,000 1.000 Diameter (m) 5.000 Length (m) 3,991,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,991,000
Contract ID 140805/03/02 TSO Lim Sokhanan Project Type Irrigation 3,864,000
Andoung 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,864,000 0.800 Diameter (m) 4.000 Width (m) 3,864,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,864,000

Pea Reang, Preaek Ta Sar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140806/03/01 TSO Lim Sokhanan Project Type Rural Transport 5,254,000
Preaek Chhmuoh 1 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,254,000 1.000 Diameter (m) 5.000 Length (m) 5,254,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,254,000

Pea Reang, Prey Pnov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140807/03/01 TSO Lim Sokhanan Project Type Rural Transport 7,966,500
Prum 1 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,655,500 0.800 Diameter (m) 5.000 Length (m) 5,311,000
Prey Sla 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,655,500 0.800 Diameter (m) 5.000 Length (m) 2,655,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,966,500
Contract ID 140807/03/02 TSO Lim Sokhanan Project Type Rural Domestic Water Supplies 3,360,000
Prey Sla 1 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 1,680,000 55.000 Depth (m) 100.000 Diameter (mm) 1,680,000
Sameakki 2 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 1,680,000 55.000 Depth (m) 100.000 Diameter (mm) 1,680,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,360,000

Pea Reang, Prey Sniet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140808/03/01 TSO Lim Sokhanan Project Type Irrigation 22,220,800
Prey Sniet 1 452 Single pipe Culvert with gate 7.00 [ 7.00 ] Place 3,174,400 0.600 Diameter (m) 4.000 Width (m) 22,220,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,220,800
Contract ID 140808/03/02 TSO Lim Sokhanan Project Type Rural Transport 2,165,400
Me Loung 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,082,700 0.600 Diameter (m) 4.000 Length (m) 2,165,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,165,400

Pea Reang, Prey Sralet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140809/03/01 TSO Lim Sokhanan Project Type Irrigation 20,030,000
Kok Thum 1 452 Single pipe Culvert with gate 3.00 [ 3.00 ] Place 4,500,000 0.800 Diameter (m) 4.000 Width (m) 13,500,000
Kok Touch 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,265,000 0.800 Diameter (m) 4.000 Width (m) 6,530,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,030,000
Contract ID 140809/03/02 TSO Lim Sokhanan Project Type Rural Transport 15,450,000
Chong Prey 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,050,000 0.600 Diameter (m) 4.000 Length (m) 1,050,000
Prohut 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 4.000 Length (m) 2,400,000
Chrey 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.800 Diameter (m) 4.000 Length (m) 4,000,000
Prey Sralet 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 4.000 Length (m) 2,000,000
Chrey 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 4.000 Length (m) 2,000,000
Prey Kralanh Thum 6 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.800 Diameter (m) 4.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,450,000

Pea Reang, Reab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140810/03/01 TSO Lim Sokhanan Project Type Rural Transport 17,600,000
Chrey 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 1,000,000
Pou Sabang 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 2,000,000
Peareang 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,300,000 0.800 Diameter (m) 4.000 Length (m) 3,300,000
Peareang 4 211 Single pipe culvert 7.00 [ 7.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 7,000,000
Prey Khla 5 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,300,000 1.000 Diameter (m) 5.000 Length (m) 4,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,600,000

Pea Reang, Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140811/03/01 TSO Lim Sokhanan Project Type Irrigation 9,399,000
Tang Snay 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,133,000 0.600 Diameter (m) 4.000 Width (m) 3,133,000
Me Lob 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,133,000 0.600 Diameter (m) 4.000 Width (m) 3,133,000
Trakiet 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,133,000 0.600 Diameter (m) 4.000 Width (m) 3,133,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,399,000
Contract ID 140811/03/02 TSO Lim Sokhanan Project Type Rural Transport 1,057,000
Prey Sralanh 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,057,000 0.600 Diameter (m) 4.000 Length (m) 1,057,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  1,057,000