Contract Outputs

Location: Prey Veng \ Kampong Trabaek Budget Year: 2005

Ba Phnum    Kamchay Mear    Kampong Trabaek    Kanhchriech    Me Sang    Peam Chor    Peam Ro    Pea Reang    Preah Sdach    Prey Veaeng    Kampong Leav    Sithor Kandal   

Kampong Trabaek, Ansaong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140301/05/01 TSO Lonh Saran Project Type Rural Transport 24,841,000
Banteab Bos 1 201 Earth road 1.20 [ 1.20 ] Km 17,450,000 4.000 Width (m) 6,765.000 Earth fill m3 20,940,000
Ta Aong 2 201 Earth road 0.80 [ 0.48 ] Km 17,450,000 4.000 Width (m) 0.000 Earth fill m3 8,376,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,316,000

Kampong Trabaek, Cham

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140302/05/01 TSO Lonh Saran Project Type Rural Transport 34,440,000
Krang Leav 1 201 Earth road 0.90 [ 0.90 ] Km 16,400,000 4.000 Width (m) 7,310.000 Earth fill m3 14,760,000
Ka Thum 2 201 Earth road 1.00 [ 1.20 ] Km 16,400,000 4.000 Width (m) 0.000 Earth fill m3 19,680,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,440,000

Kampong Trabaek, Cheang Daek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140303/05/01 TSO Lonh Saran Project Type Irrigation 30,640,000
Oknha Soeng 1 420 Canal 0.50 [ 0.50 ] Km 24,512,000 1.800 Depth (m) 11,639.000 Volume (m3) 12,256,000
Krang Veaeng 2 420 Canal 0.40 [ 0.40 ] Km 24,512,000 1.800 Depth (m) 0.000 Volume (m3) 9,804,800
Angkrong 3 420 Canal 0.35 [ 0.35 ] Km 24,512,000 1.800 Depth (m) 0.000 Volume (m3) 8,579,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,640,000

Kampong Trabaek, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140304/05/01 TSO Lonh Saran Project Type Rural Transport 26,280,800
Samraong 1 201 Earth road 2.00 [ 2.15 ] Km 13,657,650 3.000 Width (m) 5,580.000 Earth fill m3 29,363,948
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,363,948

Kampong Trabaek, Kansaom Ak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140305/05/01 TSO Vong Kim An Project Type Rural Transport 78,128,600
Kansaom Ak 1 201 Earth road 0.92 [ 0.92 ] Km 13,764,000 5.000 Width (m) 13,926.000 Earth fill m3 12,717,936
Toap Siem 2 201 Earth road 2.85 [ 2.85 ] Km 13,764,000 3.500 Width (m) 0.000 Earth fill m3 39,227,400
Trapeang Run 3 201 Earth road 1.30 [ 1.30 ] Km 13,764,000 3.000 Width (m) 0.000 Earth fill m3 17,893,200
Kansaom Ak 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Toap Siem 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,600,000 0.800 Diameter (m) 4.000 Length (m) 1,600,000
Toap Siem 6 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 4,000,000
Kansaom Ak 7 281 Width restriction posts 1.00 [ 1.00 ] Place 690,100 0.000 0.000 690,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  78,128,636

Kampong Trabaek, Kou Khchak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140306/05/01 TSO Vong Kim An Project Type Rural Transport 75,202,900
Romeas Chhor 1 201 Earth road 3.00 [ 3.00 ] Km 13,943,500 4.000 Width (m) 12,641.000 Earth fill m3 41,830,500
Trav 2 201 Earth road 1.55 [ 1.55 ] Km 13,943,500 4.000 Width (m) 0.000 Earth fill m3 21,612,425
Prey Snuol 3 211 Single pipe culvert 8.00 [ 8.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 8,000,000
Kou Khchak 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.800 Diameter (m) 4.000 Length (m) 2,400,000
Prey Snuol 5 281 Width restriction posts 1.00 [ 1.00 ] Place 680,000 0.000 0.000 680,000
Kou Khchak 6 281 Width restriction posts 1.00 [ 1.00 ] Place 680,000 0.000 0.000 680,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  75,202,925

Kampong Trabaek, Kampong Trabaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140307/05/01 TSO Vong Kim An Project Type Rural Transport 27,500,000
Anlong Reach 1 201 Earth road 1.75 [ 1.75 ] Km 15,714,286 3.000 Width (m) 5,058.000 Earth fill m3 27,500,001
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,500,001

Kampong Trabaek, Peam Montear

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140308/05/01 TSO Vong Kim An Project Type Rural Transport 31,926,000
Ta Kaev 1 201 Earth road 1.45 [ 1.45 ] Km 22,017,931 4.000 Width (m) 6,029.000 Earth fill m3 31,926,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,926,000

Kampong Trabaek, Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140309/05/01 TSO Vong Kim An Project Type Rural Transport 32,992,600
Prasat 1 201 Earth road 1.70 [ 1.70 ] Km 13,800,100 5.000 Width (m) 6,377.500 Earth fill m3 23,460,170
Phlong 2 201 Earth road 0.60 [ 0.60 ] Km 13,800,100 3.000 Width (m) 0.000 Earth fill m3 8,280,060
Prasat 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,650,000 0.600 Diameter (m) 5.000 Length (m) 1,650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,390,230

Kampong Trabaek, Pratheat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140310/05/01 TSO Lonh Saran Project Type Rural Transport 53,980,000
Prey Nheat 1 201 Earth road 1.50 [ 1.50 ] Km 12,660,000 4.000 Width (m) 8,920.000 Earth fill m3 18,990,000
Pratheat 2 201 Earth road 1.20 [ 1.20 ] Km 12,660,000 4.000 Width (m) 0.000 Earth fill m3 15,192,000
Chhvang 3 201 Earth road 0.30 [ 0.30 ] Km 12,660,000 4.000 Width (m) 0.000 Earth fill m3 3,798,000
Pratheat 4 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Chhvang 5 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Traok 6 212 Double pipe culvert 0.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Prey Nheat 7 211 Single pipe culvert 0.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Pratheat 8 201 Earth road 1.55 [ 1.55 ] Km 2,000,000 4.000 Width (m) 200.000 Earth fill m3 3,100,000
Chhvang 9 201 Earth road 0.90 [ 0.90 ] Km 2,000,000 4.000 Width (m) 0.000 Earth fill m3 1,800,000
Tramot 10 201 Earth road 0.25 [ 0.25 ] Km 2,000,000 4.000 Width (m) 0.000 Earth fill m3 500,000
Traok 11 201 Earth road 1.00 [ 1.00 ] Km 2,000,000 4.000 Width (m) 0.000 Earth fill m3 2,000,000
Pou 12 201 Earth road 0.30 [ 0.30 ] Km 2,000,000 4.000 Width (m) 0.000 Earth fill m3 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  53,980,000

Kampong Trabaek, Prey Chhor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140311/05/01 TSO Vong Kim An Project Type Rural Transport 43,000,000
A Kreach 1 201 Earth road 1.20 [ 1.20 ] Km 15,685,125 4.000 Width (m) 7,252.000 Earth fill m3 18,822,150
Prey Mnoas 2 201 Earth road 0.20 [ 0.20 ] Km 15,685,125 4.000 Width (m) 0.000 Earth fill m3 3,137,025
Tbaeng 3 201 Earth road 0.30 [ 0.30 ] Km 15,685,125 4.000 Width (m) 0.000 Earth fill m3 4,705,538
Svay Chek 4 201 Earth road 0.65 [ 0.65 ] Km 15,685,125 4.000 Width (m) 0.000 Earth fill m3 10,195,331
A Kreach 5 211 Single pipe culvert 3.00 [ 3.00 ] Place 960,000 0.600 Diameter (m) 4.000 Length (m) 2,880,000
Prey Mnoas 6 211 Single pipe culvert 2.00 [ 2.00 ] Place 960,000 0.600 Diameter (m) 4.000 Length (m) 1,920,000
A Kreach 7 281 Width restriction posts 1.00 [ 1.00 ] Place 670,000 0.000 0.000 670,000
Svay Chek 8 281 Width restriction posts 1.00 [ 1.00 ] Place 670,000 0.000 0.000 670,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,000,044

Kampong Trabaek, Prey Poun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140312/05/01 TSO Lonh Saran Project Type Rural Transport 26,685,500
Prey Poun 1 201 Earth road 0.35 [ 0.35 ] Km 10,070,000 3.000 Width (m) 6,079.000 Earth fill m3 3,524,500
Ta Proy 2 201 Earth road 0.80 [ 0.80 ] Km 10,070,000 3.000 Width (m) 0.000 Earth fill m3 8,056,000
Trapeang Krasang 3 201 Earth road 1.50 [ 1.50 ] Km 10,070,000 3.000 Width (m) 0.000 Earth fill m3 15,105,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,685,500

Kampong Trabaek, Thkov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140313/05/01 TSO Lonh Saran Project Type Rural Transport 23,770,100
Ruessei 1 201 Earth road 1.50 [ 1.50 ] Km 12,000,000 3.000 Width (m) 3,562.000 Earth fill m3 18,000,000
Ruessei 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,515,000 0.600 Diameter (m) 4.000 Length (m) 3,030,000
Pouthi Vongs 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,515,000 0.600 Diameter (m) 4.000 Length (m) 3,030,000
Pou 4 211 Single pipe culvert 0.00 [ 1.00 ] Place 1,515,000 0.600 Diameter (m) 4.000 Length (m) 1,515,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,575,000