Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141201/05/01 TSO Chea Sarim Project Type Irrigation 69,107,000
Kbal Boeng 1 420 Canal 2.80 [ 3.00 ] Km 21,153,300 1.400 Depth (m) 24,354.000 Volume (m3) 63,459,900
Kbal Boeng 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,500,000 0.600 Diameter (m) 5.000 Width (m) 2,500,000
Tuol Chrey 3 201 Earth road 1.40 [ 1.40 ] Km 1,870,900 4.000 Width (m) 672.000 Earth fill m3 2,619,260
Tuol Chrey 4 281 Width restriction posts 1.00 [ 1.00 ] Place 528,000 0.000 0.000 528,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  69,107,160

Sithor Kandal, Chrey Khmum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141202/05/01 TSO Chea Sarim Project Type Rural Transport 62,092,000
Prey Sva 1 201 Earth road 0.95 [ 0.95 ] Km 23,800,000 4.000 Width (m) 10,154.000 Earth fill m3 22,610,000
Kantrounh 2 201 Earth road 1.30 [ 1.64 ] Km 23,800,000 4.000 Width (m) 0.000 Earth fill m3 39,032,000
Prey Sva 3 281 Width restriction posts 1.00 [ 1.00 ] Place 450,000 0.000 0.000 450,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  62,092,000
Contract ID 141202/05/02 TSO Chea Sarim Project Type Education 3,150,000
Prasat 1 740 School furniture 3.00 [ 3.00 ] School room 1,050,000 40.000 Students 0.000 3,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  3,150,000

Sithor Kandal, Lve

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141203/05/01 TSO Chea Sarim Project Type Rural Transport 27,040,000
Prum Muni 1 201 Earth road 1.21 [ 1.30 ] Km 20,800,000 4.000 Width (m) 6,195.000 Earth fill m3 27,040,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,040,000

Sithor Kandal, Pnov Ti Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141204/05/02 TSO Chea Sarim Project Type Education 50,820,000
Tuol Angkonh 1 321 Brick school with tile roof 2.00 [ 2.00 ] School room 23,300,000 16.000 Length (m) 9.000 Width (m) 46,600,000
Tuol Angkonh 2 740 School furniture 4.00 [ 4.00 ] School room 1,055,000 40.000 Students 0.000 4,220,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,820,000

Sithor Kandal, Pnov Ti Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141205/05/02 TSO Chea Sarim Project Type Education 69,408,000
Sda Srok 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 22,037,000 24.000 Length (m) 9.000 Width (m) 66,111,000
Sda Srok 2 740 School furniture 1.00 [ 3.00 ] School room 1,099,000 40.000 Students 0.000 3,297,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  69,408,000

Sithor Kandal, Pou Ti

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141206/05/01 TSO San Vibol Project Type Irrigation 58,069,300
Svay Sak 1 410 Earth dam 1.80 [ 2.05 ] Km 23,346,000 1.500 Max. height (m) 12,246.000 Volume (m3) 47,859,300
Svay Sak 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,255,000 0.800 Diameter (m) 4.000 Width (m) 6,510,000
Pou Ti 3 201 Earth road 0.60 [ 1.30 ] Km 1,850,000 4.000 Width (m) 695.000 Earth fill m3 2,405,000
Trach 4 201 Earth road 0.70 [ 0.70 ] Km 1,850,000 4.000 Width (m) 0.000 Earth fill m3 1,295,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  58,069,300

Sithor Kandal, Preaek Changkran

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141207/05/01 TSO Chea Sarim Project Type Irrigation 32,437,000
Preaek Pnov 1 410 Earth dam 0.03 [ 0.03 ] Km 8,000,000 1.000 Max. height (m) 138.000 Volume (m3) 240,000
Preaek Pnov 2 251 Drift 1.00 [ 1.00 ] Place 23,197,000 10.000 Length (m) 7.000 Width (m) 23,197,000
Preaek Pnov 3 420 Canal 0.88 [ 1.20 ] Km 7,500,000 3.210 Depth (m) 71,475.000 Volume (m3) 9,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,437,000

Sithor Kandal, Prey Daeum Thnoeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141208/05/01 TSO Chea Sarim Project Type Irrigation 28,138,000
Prey Daeum Thnoeng Pir 1 410 Earth dam 0.09 [ 0.09 ] Km 312,645,000 2.000 Max. height (m) 2,992.000 Volume (m3) 28,138,050
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,138,050

Sithor Kandal, Prey Tueng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141209/05/02 TSO San Vibol Project Type Education 50,400,000
Khnar 1 321 Brick school with tile roof 3.00 [ 3.00 ] School room 16,800,000 24.000 Length (m) 9.000 Width (m) 50,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,400,000

Sithor Kandal, Rumlech

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141210/05/01 TSO Chea Sarim Project Type Education 17,000,000
Kamphear 1 740 School furniture 2.00 [ 2.00 ] School room 1,105,880 40.000 Students 0.000 2,211,760
Prey Pou 2 740 School furniture 3.00 [ 3.00 ] School room 1,105,880 40.000 Students 0.000 3,317,640
Char 3 740 School furniture 7.00 [ 7.00 ] School room 955,880 40.000 Students 0.000 6,691,160
Prey Lean 4 740 School furniture 5.00 [ 5.00 ] School room 955,880 40.000 Students 0.000 4,779,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,999,960

Sithor Kandal, Ruessei Sanh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 141211/05/02 TSO Chea Sarim Project Type Rural Transport 71,854,000
Prey Chhieng 1 201 Earth road 2.50 [ 2.70 ] Km 22,280,000 5.000 Width (m) 12,920.000 Earth fill m3 60,156,000
Yos 2 201 Earth road 1.30 [ 1.30 ] Km 2,366,000 4.000 Width (m) 630.000 Earth fill m3 3,075,800
Prey Chhieng 3 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,436,600 0.600 Diameter (m) 5.000 Length (m) 5,746,400
Prey Chhieng 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,275,800 0.600 Diameter (m) 5.000 Length (m) 2,275,800
Prey Chhieng 5 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.000 0.000 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  71,854,000