Contract Outputs
Location: Prey Veng \ Preah Sdach Budget Year: 2005
Ba Phnum
Kamchay Mear
Kampong Trabaek
Kanhchriech
Me Sang
Peam Chor
Peam Ro
Pea Reang
Preah Sdach
Prey Veaeng
Kampong Leav
Sithor Kandal
Preah Sdach, Angkor Reach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140901/05/01 |
TSO |
Ou Kolab |
Project Type |
Irrigation |
48,782,700 |
| Svay |
1 |
420 |
Canal |
1.70 [ 1.70 ] |
Km |
9,694,764 |
1.880 Depth (m) |
23,514.000 Volume (m3) |
16,481,099 |
| Ha |
2 |
420 |
Canal |
0.65 [ 0.65 ] |
Km |
9,694,764 |
1.880 Depth (m) |
0.000 Volume (m3) |
6,301,597 |
| Prey Sramaoch |
3 |
420 |
Canal |
0.19 [ 0.40 ] |
Km |
20,000,000 |
1.880 Depth (m) |
0.000 Volume (m3) |
8,000,000 |
| Svay |
4 |
452 |
Single pipe Culvert with gate |
1.00 [ 3.00 ] |
Place |
4,500,000 |
1.000 Diameter (m) |
5.000 Width (m) |
13,500,000 |
| Prey Sramaoch |
5 |
452 |
Single pipe Culvert with gate |
0.00 [ 1.00 ] |
Place |
4,500,000 |
1.000 Diameter (m) |
5.000 Width (m) |
4,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
48,782,695 |
Preah Sdach, Banteay Chakrei
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140902/05/01 |
TSO |
Ou Kolab |
Project Type |
Irrigation |
37,459,000 |
| Kaoh Chuor Ti Bei |
1 |
420 |
Canal |
1.05 [ 1.05 ] |
Km |
12,080,000 |
1.400 Depth (m) |
13,030.000 Volume (m3) |
12,684,000 |
| Kaoh Chuor Ti Pir |
2 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
12,080,000 |
1.400 Depth (m) |
0.000 Volume (m3) |
12,080,000 |
| Kaoh Chuor Ti Muoy |
3 |
420 |
Canal |
0.45 [ 0.64 ] |
Km |
12,080,000 |
2.160 Depth (m) |
0.000 Volume (m3) |
7,694,960 |
| Kaoh Chuor Ti Pir |
4 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
5,000,000 |
1.000 Diameter (m) |
5.000 Width (m) |
5,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,458,960 |
Preah Sdach, Boeng Daol
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140903/05/01 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
30,010,000 |
| Kaoh Koun Satv |
1 |
420 |
Canal |
0.92 [ 0.92 ] |
Km |
20,500,000 |
1.850 Depth (m) |
7,363.000 Volume (m3) |
18,860,000 |
| Sambuor |
2 |
420 |
Canal |
0.30 [ 0.30 ] |
Km |
20,500,000 |
1.850 Depth (m) |
0.000 Volume (m3) |
6,150,000 |
| Sambuor |
3 |
453 |
Double pipe culvert with gate |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
6.000 Width (m) |
2,000,000 |
| Sambuor |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Kaoh Koun Satv |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,010,000 |
Preah Sdach, Chey Kampok
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140904/05/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
33,555,100 |
| Tras |
1 |
201 |
Earth road |
0.60 [ 1.39 ] |
Km |
10,000,000 |
3.500 Width (m) |
8,473.000 Earth fill m3 |
13,880,000 |
| Snao |
2 |
201 |
Earth road |
1.65 [ 2.08 ] |
Km |
7,151,515 |
3.500 Width (m) |
0.000 Earth fill m3 |
14,875,151 |
| Tuol Lean |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Tras |
4 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Snao |
5 |
211 |
Single pipe culvert |
0.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,555,151 |
Preah Sdach, Kampong Soeng
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140905/05/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
33,788,500 |
| Soeng |
1 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
5,680,000 |
3.500 Width (m) |
8,539.000 Earth fill m3 |
7,668,000 |
| Svay |
2 |
201 |
Earth road |
0.75 [ 1.75 ] |
Km |
9,030,000 |
3.500 Width (m) |
0.000 Earth fill m3 |
15,802,500 |
| Pilea |
3 |
201 |
Earth road |
0.00 [ 0.60 ] |
Km |
9,030,000 |
3.500 Width (m) |
0.000 Earth fill m3 |
5,418,000 |
| Soeng |
4 |
211 |
Single pipe culvert |
5.00 [ 5.00 ] |
Place |
700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,500,000 |
| Svay |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
700,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
33,788,500 |
Preah Sdach, Krang Svay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140906/05/01 |
TSO |
Vong Kim An |
Project Type |
Rural Transport |
25,503,200 |
| Srah Kaev |
1 |
201 |
Earth road |
1.42 [ 1.42 ] |
Km |
17,960,000 |
4.000 Width (m) |
5,386.000 Earth fill m3 |
25,503,200 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
25,503,200 |
Preah Sdach, Lvea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140907/05/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
27,200,000 |
| Prum Khsach |
1 |
201 |
Earth road |
0.20 [ 0.20 ] |
Km |
6,811,145 |
3.000 Width (m) |
4,831.000 Earth fill m3 |
1,362,229 |
| Ta Kouk |
2 |
201 |
Earth road |
1.74 [ 1.74 ] |
Km |
6,811,145 |
3.000 Width (m) |
0.000 Earth fill m3 |
11,837,770 |
| Prum Khsach |
3 |
211 |
Single pipe culvert |
1.00 [ 3.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
4,200,000 |
| Ta Kouk |
4 |
211 |
Single pipe culvert |
1.00 [ 7.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
9,800,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,199,999 |
Preah Sdach, Preah Sdach
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140908/05/01 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
34,836,400 |
| Phot |
1 |
420 |
Canal |
2.25 [ 2.57 ] |
Km |
13,555,000 |
3.320 Depth (m) |
11,866.000 Volume (m3) |
34,836,350 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,836,350 |
Preah Sdach, Reathor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140909/05/01 |
TSO |
Lim Sokhanan |
Project Type |
Irrigation |
26,130,000 |
| Chhneah Chey Kraom |
1 |
420 |
Canal |
1.20 [ 1.30 ] |
Km |
20,100,000 |
2.080 Depth (m) |
9,220.000 Volume (m3) |
26,130,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,130,000 |
Preah Sdach, Rumchek
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140910/05/01 |
TSO |
Ou Kolab |
Project Type |
Irrigation |
72,155,700 |
| Loek |
1 |
420 |
Canal |
0.12 [ 0.12 ] |
Km |
30,000,000 |
2.300 Depth (m) |
27,348.000 Volume (m3) |
3,510,000 |
| Loek |
2 |
420 |
Canal |
1.23 [ 1.23 ] |
Km |
27,223,466 |
2.300 Depth (m) |
0.000 Volume (m3) |
33,566,534 |
| Krasar Chet |
3 |
420 |
Canal |
0.60 [ 0.60 ] |
Km |
27,223,466 |
2.300 Depth (m) |
0.000 Volume (m3) |
16,334,080 |
| Srah |
4 |
420 |
Canal |
0.40 [ 0.56 ] |
Km |
27,223,466 |
2.300 Depth (m) |
0.000 Volume (m3) |
15,245,141 |
| Loek |
5 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,500,000 |
1.000 Diameter (m) |
5.000 Width (m) |
3,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
72,155,754 |
Preah Sdach, Seena Reach Otdam
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
140911/05/01 |
TSO |
Ou Kolab |
Project Type |
Rural Transport |
35,200,000 |
| Thnong |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
866,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,598,000 |
| Pring |
2 |
211 |
Single pipe culvert |
4.00 [ 4.00 ] |
Place |
866,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,464,000 |
| Spean Chey |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
866,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,598,000 |
| Spean Chey |
4 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,252,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,252,500 |
| Trea |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
866,000 |
0.600 Diameter (m) |
5.000 Length (m) |
866,000 |
| Trea |
6 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,252,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,252,500 |
| Krasang Char |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
866,000 |
0.600 Diameter (m) |
5.000 Length (m) |
866,000 |
| Krasang Char |
8 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,252,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,252,500 |
| Kamrieng |
9 |
211 |
Single pipe culvert |
1.00 [ 2.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,400,000 |
| Kamrieng |
10 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Khla Kham |
11 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
866,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,598,000 |
| Khla Kham |
12 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,252,500 |
0.600 Diameter (m) |
5.000 Length (m) |
1,252,500 |
| Klaeng Kong |
13 |
211 |
Single pipe culvert |
0.00 [ 7.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
8,400,000 |
| Thnong |
14 |
212 |
Double pipe culvert |
0.00 [ 1.00 ] |
Place |
2,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,000,000 |
| Prasna Touch |
15 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Chey a Khaol |
16 |
211 |
Single pipe culvert |
0.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
35,200,000 |