Contract Outputs

Location: Kampong Cham Budget Year: 2005

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Batheay, Batheay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030101/05/01 TSO IM SARAN Project Type Irrigation 30,400,000
Chreaek 7 410 Earth dam 1.00 [ 1.00 ] Km 23,400,000 1.000 Max. height (m) 3,598.600 Volume (m3) 23,400,000
Chreaek 8 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,500,000 0.600 Diameter (m) 8.000 Width (m) 7,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,400,000
Contract ID 030101/05/02 TSO IM SARAN Project Type Rural Transport 11,400,000
Chreaek 1 201 Earth road 0.65 [ 0.65 ] Km 17,538,462 4.000 Width (m) 2,088.000 Earth fill m3 11,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,400,000

Batheay, Chbar Ampov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030102/05/01 TSO IM SARAN Project Type Rural Transport 31,537,100
Anlong Chrey 1 201 Earth road 2.10 [ 2.48 ] Km 12,742,263 4.000 Width (m) 5,407.000 Earth fill m3 31,537,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,537,100

Batheay, Chealea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030103/05/01 TSO IM SARAN Project Type Rural Transport 32,600,000
Tang Krang 1 201 Earth road 1.30 [ 1.30 ] Km 23,923,076 4.000 Width (m) 5,576.000 Earth fill m3 31,099,999
Tang Krang 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,599,999

Batheay, Cheung Prey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030104/05/01 TSO IM SARAN Project Type Rural Transport 33,800,000
Prasoutr Kha 1 201 Earth road 2.10 [ 2.10 ] Km 14,761,905 4.000 Width (m) 6,561.000 Earth fill m3 31,000,001
Prasoutr Kha 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,800,001

Batheay, Me Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030105/05/01 TSO IM SARAN Project Type Rural Transport 30,146,500
Prey Kaor 1 201 Earth road 0.76 [ 0.76 ] Km 31,718,026 4.000 Width (m) 5,097.000 Earth fill m3 24,105,700
Prey Kaor 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,510,200 0.600 Diameter (m) 5.000 Length (m) 6,040,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,146,500

Batheay, Ph'av

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030106/05/01 TSO IM SARAN Project Type Rural Transport 35,872,000
Ph'av 1 201 Earth road 0.27 [ 0.27 ] Km 16,129,057 4.000 Width (m) 1,301.000 Earth fill m3 4,274,200
Samraong 2 201 Earth road 0.55 [ 0.55 ] Km 16,129,091 4.000 Width (m) 1,555.000 Earth fill m3 8,871,000
Prey Nha 3 201 Earth road 0.74 [ 0.98 ] Km 16,130,051 4.000 Width (m) 2,729.000 Earth fill m3 15,726,800
Ph'av 4 211 Single pipe culvert 1.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Samraong 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Prey Nha 6 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,872,000

Batheay, Sambour

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030107/05/01 TSO IM SARAN Project Type Rural Transport 40,845,000
Ta Poy 1 201 Earth road 1.06 [ 1.06 ] Km 18,007,026 4.000 Width (m) 3,911.000 Earth fill m3 19,087,447
Chong 2 201 Earth road 1.08 [ 1.08 ] Km 18,007,026 4.000 Width (m) 3,911.000 Earth fill m3 19,357,553
Ta Poy 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Chong 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,845,000

Batheay, Sandaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030108/05/01 TSO IM SARAN Project Type Rural Transport 24,500,000
Svay Prey 1 202 Laterite road 2.08 [ 2.08 ] Km 11,480,769 3.500 Width (m) 0.150 Earth fill m3 23,880,000
Svay Prey 2 281 Width restriction posts 1.00 [ 1.00 ] Place 620,000 0.400 1.500 620,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,500,000
Contract ID 030108/05/02 TSO IM SARAN Project Type Rural Transport 16,000,000
Svay Prey 1 201 Earth road 0.48 [ 0.48 ] Km 27,789,474 4.000 Width (m) 2,362.000 Earth fill m3 13,200,000
Svay Prey 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,000,000

Batheay, Tang Krang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030109/05/01 TSO IM SARAN Project Type Irrigation 33,500,000
Tang Kouk 1 410 Earth dam 1.68 [ 1.68 ] Km 19,940,476 105.000 Max. height (m) 6,090.550 Volume (m3) 33,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,500,000

Batheay, Tang Krasang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030110/05/01 TSO IM SARAN Project Type Rural Domestic Water Supplies 41,033,000
Boeng Veaeng 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Kradas Ka 2 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Kradas Kha 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Sdok Thum 4 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Trav Phni 5 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Khvet 6 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Khtum 7 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Chan 8 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Chi Neang 9 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Boeng 12 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,103,300 50.000 Depth (m) 100.000 Diameter (mm) 4,103,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,033,000

Batheay, Trab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030111/05/01 TSO IM SARAN Project Type Irrigation 39,200,000
Kampout 1 410 Earth dam 2.52 [ 2.52 ] Km 15,586,481 0.500 Max. height (m) 7,563.000 Volume (m3) 39,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,200,000

Batheay, Tumnob

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030112/05/01 TSO IM SARAN Project Type Rural Transport 32,500,000
Sroeng 1 201 Earth road 1.14 [ 1.14 ] Km 26,052,631 4.000 Width (m) 6,384.000 Earth fill m3 29,699,999
Sroeng 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 2,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,499,999

Chamkar Leu, Bos Khnaor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030201/05/01 TSO Kheng Rattana Project Type Irrigation 34,772,500
Chranaom 1 410 Earth dam 0.15 [ 0.15 ] Km 33,665,333 3.000 Max. height (m) 2,059.000 Volume (m3) 5,049,800
Bos Khnor 2 410 Earth dam 0.47 [ 0.47 ] Km 33,665,319 2.000 Max. height (m) 4,813.000 Volume (m3) 15,822,700
Chranaom 3 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 10,100,000 0.800 Diameter (m) 10.000 Width (m) 10,100,000
Bos Khnor 4 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,800,000 0.800 Diameter (m) 5.000 Width (m) 3,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,772,500
Contract ID 030201/05/02 TSO Kheng Rattana Project Type Irrigation 19,498,800
Prasaeur 1 410 Earth dam 0.16 [ 0.16 ] Km 64,680,000 1.000 Max. height (m) 1,491.000 Volume (m3) 10,348,800
Prasaeur 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 9,150,000 2.000 Total span (m) 3.000 Width (m) 9,150,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,498,800

Chamkar Leu, Chamkar Andoung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030202/05/01 TSO Kheng Rattana Project Type Rural Transport 50,996,400
Choam Chrey 4 202 Laterite road 1.25 [ 2.73 ] Km 13,511,099 4.000 Width (m) 0.150 Earth fill m3 36,885,300
Choam Chrey 4 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.400 1.500 600,000
elx BI 5 202 Laterite road 1.00 [ 1.00 ] Km 13,511,100 4.000 Width (m) 0.150 Earth fill m3 13,511,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,996,400

Chamkar Leu, Cheyyou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030203/05/01 TSO Kheng Rattana Project Type Irrigation 26,450,000
Trapeang Ruessei 2 410 Earth dam 0.34 [ 0.34 ] Km 43,000,000 3.500 Max. height (m) 3,492.000 Volume (m3) 14,448,000
Trapeang Ruessei 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 6.000 Width (m) 3,000,000
Trapeang Ruessei 4 453 Double pipe culvert with gate 1.00 [ 1.00 ] Place 9,002,000 0.800 Diameter (m) 1.000 Width (m) 9,002,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,450,000
Contract ID 030203/05/02 TSO Kheng Rattana Project Type Rural Transport 8,733,900
Spueu Ka 1 201 Earth road 0.25 [ 0.40 ] Km 12,477,000 3.000 Width (m) 0.150 Earth fill m3 4,990,800
Trapeang Lpov 2 201 Earth road 0.30 [ 0.30 ] Km 12,477,000 2.500 Width (m) 0.150 Earth fill m3 3,743,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,733,900
Contract ID 030203/05/03 TSO Kheng Rattana Project Type Rural Transport 10,619,700
Cheyyou 2 202 Laterite road 0.62 [ 0.62 ] Km 12,703,000 3.000 Width (m) 277.000 Earth fill m3 7,812,345
Spueu Ka 3 202 Laterite road 0.22 [ 0.22 ] Km 12,703,000 3.000 Width (m) 99.000 Earth fill m3 2,807,363
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,619,708

Chamkar Leu, Lvea Leu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030204/05/01 TSO Kheng Rattana Project Type Irrigation 21,500,000
Phum Bei 1 410 Earth dam 0.52 [ 0.52 ] Km 40,540,541 2.500 Max. height (m) 5,049.000 Volume (m3) 21,000,000
Kbal Hong Thmei 3 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 500,000 1.900 Total span (m) 2.000 Width (m) 500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,500,000
Contract ID 030204/05/02 TSO Kheng Rattana Project Type Irrigation 11,500,000
Kbal Hong Chas 1 410 Earth dam 0.60 [ 0.60 ] Km 19,166,667 1.600 Max. height (m) 1,070.000 Volume (m3) 11,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  11,500,000

Chamkar Leu, Spueu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030205/05/01 TSO Kheng Rattana Project Type Rural Transport 33,600,000
Banteay Chey 1 202 Laterite road 0.70 [ 0.70 ] Km 10,406,250 3.500 Width (m) 0.150 Earth fill m3 7,284,375
Peaeng Meas Cheung 2 202 Laterite road 0.80 [ 0.80 ] Km 10,406,250 3.500 Width (m) 0.150 Earth fill m3 8,325,000
Spueu Kaeut 3 202 Laterite road 1.60 [ 1.60 ] Km 10,406,250 4.000 Width (m) 0.150 Earth fill m3 16,650,000
Spueu Lech 4 202 Laterite road 0.10 [ 0.10 ] Km 10,406,250 4.000 Width (m) 0.150 Earth fill m3 1,040,625
Banteay Chey 5 281 Width restriction posts 1.00 [ 1.00 ] Place 100,000 0.400 1.500 100,000
Peaeng Meas Cheung 6 281 Width restriction posts 1.00 [ 1.00 ] Place 100,000 0.400 1.500 100,000
Spueu Kaeut 7 281 Width restriction posts 1.00 [ 1.00 ] Place 100,000 0.400 1.500 100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,600,000
Contract ID 030205/05/02 TSO Kheng Rattana Project Type Rural Transport 13,400,000
Spueu Kaeut 1 202 Laterite road 0.80 [ 0.80 ] Km 16,813,049 3.500 Width (m) 437.000 Earth fill m3 13,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,400,000

Chamkar Leu, Svay Teab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030206/05/01 TSO Kheng Rattana Project Type Rural Transport 51,480,100
Trapeang Beng 1 201 Earth road 1.83 [ 1.83 ] Km 11,628,681 4.000 Width (m) 0.500 Earth fill m3 21,245,600
Bos Thlan 2 201 Earth road 1.20 [ 2.60 ] Km 11,628,654 4.000 Width (m) 0.500 Earth fill m3 30,234,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  51,480,100

Chamkar Leu, Ta Ong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030207/05/01 TSO Kheng Rattana Project Type Rural Transport 46,960,500
Sampoar 1 201 Earth road 3.20 [ 4.23 ] Km 9,531,250 4.000 Width (m) 8,430.000 Earth fill m3 40,288,594
Trapeang Chhuk 3 201 Earth road 0.70 [ 0.70 ] Km 9,531,250 4.000 Width (m) 4,549.000 Earth fill m3 6,671,875
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  46,960,469

Chamkar Leu, Ta Prok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030208/05/01 TSO Kheng Rattana Project Type Rural Transport 32,362,500
Svay Teab 1 201 Earth road 1.55 [ 1.55 ] Km 11,870,000 4.000 Width (m) 4,154.000 Earth fill m3 18,398,500
Neang Laeung 2 201 Earth road 0.87 [ 0.87 ] Km 11,869,989 4.000 Width (m) 2,339.000 Earth fill m3 10,362,500
Svay Teab 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,200,500 0.600 Diameter (m) 5.000 Length (m) 3,601,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,362,500

Cheung Prey, Khnaor Dambang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030301/05/01 TSO Mem vibol Project Type Rural Transport 31,200,000
Knaor Dambang 1 201 Earth road 0.90 [ 0.90 ] Km 28,213,222 4.000 Width (m) 2,921.000 Earth fill m3 25,391,900
Roveang 2 213 Triple pipe culvert 1.00 [ 1.00 ] Place 4,469,300 0.800 Diameter (m) 15.000 Length (m) 4,469,300
Roveang 3 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 1,338,800 0.600 Diameter (m) 3.000 Length (m) 1,338,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,200,000

Cheung Prey, Kouk Rovieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030302/05/01 TSO Mem vibol Project Type Rural Transport 20,090,000
Chhuk 1 202 Laterite road 0.30 [ 0.30 ] Km 15,000,000 4.000 Width (m) 101.000 Earth fill m3 4,500,000
Chhuk 2 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Chhuk 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,270,000 0.800 Diameter (m) 5.000 Length (m) 2,270,000
Chhuk 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,900,000 1.000 Diameter (m) 5.000 Length (m) 2,900,000
Kouk Rovieng 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,700,000 0.600 Diameter (m) 5.000 Length (m) 1,700,000
Kouk Rovieng 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,270,000 0.800 Diameter (m) 5.000 Length (m) 2,270,000
Totoul 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,900,000 1.000 Diameter (m) 10.000 Length (m) 5,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,090,000
Contract ID 030302/05/02 TSO Mem vibol Project Type Rural Transport 10,000,000
Ba Krong 1 201 Earth road 0.40 [ 0.40 ] Km 25,000,000 4.000 Width (m) 1,131.000 Earth fill m3 10,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,000,000

Cheung Prey, Phdau Chum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030303/05/01 TSO Mem vibol Project Type Rural Transport 39,000,000
Chheu Teal 1 202 Laterite road 2.55 [ 2.55 ] Km 10,994,902 4.000 Width (m) 861.000 Earth fill m3 28,037,000
Cham Neang 2 202 Laterite road 0.35 [ 0.35 ] Km 10,994,857 4.000 Width (m) 118.000 Earth fill m3 3,848,200
Chheu Teal 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,246,200 0.800 Diameter (m) 5.000 Length (m) 2,246,200
Chheu Teal 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,744,200 0.600 Diameter (m) 5.000 Length (m) 3,488,400
Chheu Teal 5 281 Width restriction posts 1.00 [ 1.00 ] Place 690,100 0.400 1.500 690,100
Cham Neang 6 281 Width restriction posts 1.00 [ 1.00 ] Place 690,100 0.400 1.500 690,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,000,000

Cheung Prey, Prey Char

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030304/05/01 TSO Mem vibol Project Type Irrigation 32,300,000
Bati 1 420 Canal 1.59 [ 1.59 ] Km 16,683,028 0.800 Depth (m) 4,982.000 Volume (m3) 26,442,599
Bati 2 212 Double pipe culvert 2.00 [ 2.00 ] Place 2,928,700 0.800 Diameter (m) 20.000 Length (m) 5,857,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,299,999

Cheung Prey, Pring Chrum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030305/05/01 TSO Mem vibol Project Type Rural Domestic Water Supplies 26,666,000
Pring Chum 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,333,200 51.000 Depth (m) 100.000 Diameter (mm) 5,333,200
Trapeang Tuem 2 123 Drilled well with Afridev pump 2.00 [ 2.00 ] Place 5,333,200 51.000 Depth (m) 100.000 Diameter (mm) 10,666,400
Trapeang Ph'av 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,333,200 51.000 Depth (m) 100.000 Diameter (mm) 5,333,200
Ta Ni 4 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,333,200 51.000 Depth (m) 100.000 Diameter (mm) 5,333,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,666,000
Contract ID 030305/05/02 TSO Mem vibol Project Type Rural Transport 2,254,200
Pring Chum 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,254,200 0.800 Diameter (m) 5.000 Length (m) 2,254,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  2,254,200

Cheung Prey, Sampong Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030306/05/01 TSO Mem vibol Project Type Irrigation 30,200,000
Trapeang Chhuk 2 410 Earth dam 0.60 [ 0.60 ] Km 50,333,333 1.500 Max. height (m) 4,880.000 Volume (m3) 30,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,200,000
Contract ID 030306/05/02 TSO Mem vibol Project Type Irrigation 22,100,000
Trapeang Sla 2 420 Canal 0.80 [ 0.80 ] Km 17,739,125 0.900 Depth (m) 2,462.000 Volume (m3) 14,191,300
Trapeang Sla 3 213 Triple pipe culvert 1.00 [ 1.00 ] Place 3,453,900 0.600 Diameter (m) 18.000 Length (m) 3,453,900
Trapeang Sla 4 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,113,700 0.600 Diameter (m) 12.000 Length (m) 4,454,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,100,000

Cheung Prey, Sdaeung Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030307/05/01 TSO Mem vibol Project Type Rural Transport 37,730,000
Khnar 1 202 Laterite road 3.00 [ 3.00 ] Km 12,350,000 4.000 Width (m) 1,013.000 Earth fill m3 37,050,000
Khnar 2 281 Width restriction posts 1.00 [ 1.00 ] Place 680,000 0.400 1.500 680,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,730,000

Cheung Prey, Soutip

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030308/05/01 TSO Mem vibol Project Type Irrigation 39,955,800
Doun Dom 1 420 Canal 2.10 [ 2.10 ] Km 15,905,952 0.800 Depth (m) 6,019.770 Volume (m3) 33,402,500
Ngang 2 420 Canal 0.41 [ 0.41 ] Km 15,906,068 0.800 Depth (m) 830.130 Volume (m3) 6,553,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,955,800

Cheung Prey, Srama

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030309/05/01 TSO Mem vibol Project Type Rural Transport 32,472,194
Sram Kaeut 1 201 Earth road 1.60 [ 1.60 ] Km 15,833,313 3.500 Width (m) 3,557.000 Earth fill m3 25,333,300
Trapeang Snao 2 201 Earth road 0.20 [ 0.20 ] Km 15,833,470 3.500 Width (m) 432.000 Earth fill m3 3,166,694
Sram Kaeut 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,736,500 0.600 Diameter (m) 5.000 Length (m) 1,736,500
Sram Kaeut 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,235,700 0.800 Diameter (m) 5.000 Length (m) 2,235,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,472,194

Cheung Prey, Trapeang Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030310/05/01 TSO Mem vibol Project Type Rural Domestic Water Supplies 30,252,000
Pra Ten 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,042,000 52.000 Depth (m) 100.000 Diameter (mm) 5,042,000
Kngaok 2 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,042,000 52.000 Depth (m) 100.000 Diameter (mm) 5,042,000
Kandal 3 123 Drilled well with Afridev pump 2.00 [ 2.00 ] Place 5,042,000 52.000 Depth (m) 100.000 Diameter (mm) 10,084,000
Trapeang Kor 4 123 Drilled well with Afridev pump 2.00 [ 2.00 ] Place 5,042,000 52.000 Depth (m) 100.000 Diameter (mm) 10,084,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,252,000

Dambae, Chong Cheach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030401/05/01 TSO Him huon Project Type Rural Transport 33,127,779
Cheach Thum 1 201 Earth road 1.00 [ 1.00 ] Km 14,060,222 4.000 Width (m) 0.450 Earth fill m3 14,060,222
Ta Meakh Chas 2 201 Earth road 0.52 [ 0.52 ] Km 14,060,223 4.000 Width (m) 0.350 Earth fill m3 7,367,557
Cheach Thum 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Cheach Thum 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,500,000 0.800 Diameter (m) 5.000 Length (m) 4,500,000
Cheach Thum 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 1.000 Diameter (m) 5.000 Length (m) 1,800,000
Cheach Thum 6 213 Triple pipe culvert 1.00 [ 1.00 ] Place 1,800,000 1.000 Diameter (m) 5.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,127,779

Dambae, Dambae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030402/05/01 TSO Him huon Project Type Rural Transport 24,999,000
Dambae 1 202 Laterite road 1.72 [ 1.72 ] Km 9,130,387 3.500 Width (m) 0.150 Earth fill m3 15,658,613
Thnal 2 202 Laterite road 1.02 [ 1.02 ] Km 9,130,387 3.500 Width (m) 0.150 Earth fill m3 9,340,386
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,998,999

Dambae, Kouk Srok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030403/05/01 TSO Him huon Project Type Rural Transport 29,240,000
Kouk Char 1 202 Laterite road 1.30 [ 1.30 ] Km 16,000,000 3.500 Width (m) 0.150 Earth fill m3 20,800,000
Kouk Char 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,360,000 0.600 Diameter (m) 5.000 Length (m) 5,440,000
Kouk Char 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,240,000

Dambae, Neang Teut

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030404/05/01 TSO Him huon Project Type Rural Transport 26,476,100
Neang Teut 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,242,800 0.600 Diameter (m) 5.000 Length (m) 2,485,600
Neang Teut 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,784,500 0.800 Diameter (m) 5.000 Length (m) 3,569,000
Neang Teut 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 8,798,200 1.500 Total Span (m) 5.000 Width(m) 8,798,200
Neang Teut 4 222 Double cell box culvert 1.00 [ 1.00 ] Place 11,623,300 1.500 Total Span (m) 5.000 Width(m) 11,623,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,476,100

Dambae, Seda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030405/05/01 TSO Him huon Project Type Rural Transport 37,098,180
BreakChorChomren 1 201 Earth road 2.36 [ 2.36 ] Km 15,116,000 4.000 Width (m) 0.500 Earth fill m3 35,598,180
BreakChorChomren 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,098,180

Dambae, Tuek Chrov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030406/05/01 TSO Him huon Project Type Irrigation 25,948,800
Choam Trakuon 1 410 Earth dam 0.10 [ 0.10 ] Km 118,422,000 1.900 Max. height (m) 2,038.000 Volume (m3) 11,842,200
Choam Trakuon 2 433 Concrete spillway 1.00 [ 1.00 ] Place 14,106,600 12.000 Length (m) 1.000 14,106,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,948,800
Contract ID 030406/05/02 TSO Him huon Project Type Irrigation 9,499,900
Choam Trakuon 2 420 Canal 0.14 [ 0.14 ] Km 21,794,871 0.430 Depth (m) 487.990 Volume (m3) 3,051,282
Me Sar 3 420 Canal 0.25 [ 0.25 ] Km 21,794,868 0.560 Depth (m) 262.960 Volume (m3) 5,448,717
Choam Trakuon 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 1.000 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,499,999

Dambae, Trapeang Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030407/05/01 TSO Him huon Project Type Rural Transport 27,200,000
Srae Kak 1 201 Earth road 1.70 [ 1.70 ] Km 16,000,000 4.000 Width (m) 4,178.000 Earth fill m3 27,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,200,000

Kampong Cham, Boeng Kok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030501/05/01 TSO Va Kimheng Project Type Urban transport 38,663,200
La Edth 2 201 Earth road 0.42 [ 0.42 ] Km 34,640,802 4.000 Width (m) 1,782.000 Earth fill m3 14,687,700
Boeng Kok Pir 3 201 Earth road 0.54 [ 0.54 ] Km 34,641,144 4.000 Width (m) 2,277.000 Earth fill m3 18,775,500
Boeng Kok Pir 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,150,000 1.000 Diameter (m) 7.000 Length (m) 4,150,000
La Edth 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,050,000 0.600 Diameter (m) 5.000 Length (m) 1,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,663,200

Kampong Cham, Kampong Cham

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030502/05/01 TSO Va Kimheng Project Type Urban Drainage and Flood Protection 33,000,000
Phum Prambuon 1 542 Foul water sewer 1.00 [ 1.00 ] Line 4,645,200 0.400 0.700 4,645,200
Phum Dabmuoy 2 542 Foul water sewer 1.00 [ 1.00 ] Line 5,237,300 0.400 0.700 5,237,300
Phum Prambuon 3 542 Foul water sewer 1.00 [ 1.00 ] Line 4,401,700 0.600 100.000 4,401,700
Phum Dabmuoy 4 542 Foul water sewer 1.00 [ 1.00 ] Line 5,377,000 0.600 80.000 5,377,000
Phum Prambuon 5 542 Foul water sewer 1.00 [ 1.00 ] Line 4,867,800 1.500 219.000 4,867,800
Phum Dabmuoy 6 542 Foul water sewer 1.00 [ 1.00 ] Line 8,471,000 1.500 120.000 8,471,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,000,000
Contract ID 030502/05/02 TSO Va Kimheng Project Type Urban transport 7,931,600
Phum Dabpram 2 201 Earth road 0.08 [ 0.08 ] Km 79,542,857 8.500 Width (m) 833.000 Earth fill m3 6,681,600
Phum Dabpram 3 541 Drain pipe for flood water 1.00 [ 1.00 ] Line 1,250,000 0.600 Length (m) 11.000 Diameter (m) 1,250,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,931,600

Kampong Cham, Sambuor Meas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030503/05/01 TSO Va Kimheng Project Type Urban transport 43,281,800
Boeng Snay 2 201 Earth road 0.55 [ 0.55 ] Km 27,201,091 6.500 Width (m) 1,894.000 Earth fill m3 14,960,600
Boeng Basak 3 201 Earth road 0.98 [ 0.98 ] Km 27,201,231 6.500 Width (m) 3,374.000 Earth fill m3 26,521,200
Boeng Basak 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 7.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,281,800

Kampong Cham, Veal Vong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030504/05/01 TSO Va Kimheng Project Type Urban transport 48,833,600
Phum Pram 2 201 Earth road 0.14 [ 0.14 ] Km 63,142,754 8.500 Width (m) 1,106.000 Earth fill m3 8,713,700
Phum Muoy 3 201 Earth road 0.61 [ 0.61 ] Km 63,143,160 8.500 Width (m) 4,925.000 Earth fill m3 38,769,900
Phum Muoy 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 9.000 Length (m) 1,350,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,833,600

Kampong Siem, Ampil

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030601/05/01 TSO Ou Chhengloch Project Type Rural Transport 43,000,000
Sralau 1 202 Laterite road 1.35 [ 1.35 ] Km 10,660,513 3.500 Width (m) 111.000 Earth fill m3 14,391,693
Ampil Kraom 2 202 Laterite road 1.00 [ 1.00 ] Km 10,660,515 3.500 Width (m) 111.000 Earth fill m3 10,660,515
Ampil Kraom 3 202 Laterite road 0.80 [ 0.80 ] Km 10,660,513 3.000 Width (m) 111.000 Earth fill m3 8,528,410
Ampil Kraom 4 202 Laterite road 0.36 [ 0.36 ] Km 10,660,513 2.500 Width (m) 111.000 Earth fill m3 3,784,482
Sralau 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,270,800 0.600 Diameter (m) 5.000 Length (m) 1,270,800
Sralau 6 281 Width restriction posts 2.00 [ 2.00 ] Place 607,500 0.400 0.000 1,215,000
Ampil Kraom 7 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,270,800 0.600 Diameter (m) 5.000 Length (m) 2,541,600
Ampil Kraom 8 281 Width restriction posts 1.00 [ 1.00 ] Place 607,500 0.400 0.000 607,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,000,000

Kampong Siem, Han Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030602/05/01 TSO Ou Chhengloch Project Type Rural Transport 24,554,400
Hanchey 1 201 Earth road 0.14 [ 0.14 ] Km 33,037,857 2.500 Width (m) 430.000 Earth fill m3 4,625,300
Krouch Saeuch 2 201 Earth road 0.19 [ 0.19 ] Km 33,038,378 2.500 Width (m) 671.000 Earth fill m3 6,112,100
Krouch Saeuch 3 201 Earth road 0.15 [ 0.15 ] Km 27,254,667 3.000 Width (m) 500.000 Earth fill m3 4,088,200
Lvea Ter 4 201 Earth road 0.14 [ 0.14 ] Km 69,491,429 4.000 Width (m) 1,033.000 Earth fill m3 9,728,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,554,400
Contract ID 030602/05/02 TSO Ou Chhengloch Project Type Rural Transport 4,000,000
Hanchey 2 202 Laterite road 0.22 [ 0.22 ] Km 9,216,590 3.000 Width (m) 33.000 Earth fill m3 2,000,000
Moan Haeur 3 202 Laterite road 0.17 [ 0.17 ] Km 7,711,765 3.500 Width (m) 45.000 Earth fill m3 1,311,000
Hanchey 4 281 Width restriction posts 1.00 [ 1.00 ] Place 344,500 0.400 0.000 344,500
Moan Haeur 5 281 Width restriction posts 1.00 [ 1.00 ] Place 344,500 0.400 0.000 344,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  4,000,000

Kampong Siem, Kien Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030603/05/01 TSO Ou Chhengloch Project Type Irrigation 26,800,000
Spean Thmei 1 410 Earth dam 0.35 [ 0.35 ] Km 42,681,250 1.800 Max. height (m) 2,454.000 Volume (m3) 15,023,800
Spean Thmei 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,925,400 0.800 Diameter (m) 5.000 Width (m) 3,925,400
Boeng Babos 3 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,925,400 0.800 Diameter (m) 5.000 Width (m) 7,850,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,800,000

Kampong Siem, Kaoh Mitt

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030605/05/01 TSO Ou Chhengloch Project Type Rural Transport 33,350,000
Kaoh Paen Ka 1 201 Earth road 1.25 [ 1.25 ] Km 15,159,091 4.000 Width (m) 2,395.000 Earth fill m3 18,948,864
Kaoh Paen Kha 2 201 Earth road 0.95 [ 0.95 ] Km 15,159,091 4.000 Width (m) 1,902.000 Earth fill m3 14,401,136
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,350,000

Kampong Siem, Kaoh Roka

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030606/05/01 TSO Ou Chhengloch Project Type Rural Transport 53,633,200
Kaoh Roka Knong 1 201 Earth road 0.10 [ 0.10 ] Km 25,765,000 4.000 Width (m) 335.000 Earth fill m3 2,576,500
Kaoh Roka Krau 2 201 Earth road 1.10 [ 1.10 ] Km 25,764,545 4.000 Width (m) 3,685.000 Earth fill m3 28,341,000
Kaoh Roka Knong 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 22,715,700 9.350 Total Span (m) 4.000 Width(m) 22,715,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  53,633,200

Kampong Siem, Kaoh Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030607/05/01 TSO Ou Chhengloch Project Type Rural Domestic Water Supplies 31,850,000
Phum Muoy 1 111 Ring well 1.00 [ 1.00 ] Place 2,450,000 1.200 Depth (m) 15.000 Diameter (m) 2,450,000
Phum Pir 2 111 Ring well 2.00 [ 2.00 ] Place 2,450,000 1.200 Depth (m) 15.000 Diameter (m) 4,900,000
Phum Bei 3 111 Ring well 1.00 [ 1.00 ] Place 2,450,000 1.200 Depth (m) 15.000 Diameter (m) 2,450,000
Phum Buon 4 111 Ring well 2.00 [ 2.00 ] Place 2,450,000 1.200 Depth (m) 15.000 Diameter (m) 4,900,000
Phum Pram 5 111 Ring well 2.00 [ 2.00 ] Place 2,450,000 1.200 Depth (m) 15.000 Diameter (m) 4,900,000
Phum Prammuoy 6 111 Ring well 2.00 [ 2.00 ] Place 2,450,000 1.200 Depth (m) 15.000 Diameter (m) 4,900,000
Phum Prampir 7 111 Ring well 1.00 [ 1.00 ] Place 2,450,000 1.200 Depth (m) 15.000 Diameter (m) 2,450,000
Phum Prambei 9 111 Ring well 2.00 [ 2.00 ] Place 2,450,000 15.000 Depth (m) 1.200 Diameter (m) 4,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,850,000

Kampong Siem, Kaoh Tontuem

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030608/05/01 TSO Ou Chhengloch Project Type Rural Transport 27,317,300
Kaoh Prak Leu 1 201 Earth road 0.40 [ 0.40 ] Km 63,243,250 5.000 Width (m) 3,733.000 Earth fill m3 25,297,300
Kaoh Prak Leu 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,020,000 0.600 Diameter (m) 6.000 Length (m) 2,020,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,317,300

Kampong Siem, Krala

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030609/05/01 TSO Ou Chhengloch Project Type Rural Transport 38,300,000
Trapeang Chrey 18 202 Laterite road 1.15 [ 1.15 ] Km 9,534,348 3.000 Width (m) 234.000 Earth fill m3 10,964,500
Andoung Pou 19 202 Laterite road 1.60 [ 1.60 ] Km 9,534,375 3.000 Width (m) 327.000 Earth fill m3 15,255,000
Trapeang Chrey 20 281 Width restriction posts 1.00 [ 1.00 ] Place 639,200 0.400 0.000 639,200
Ampil Chrum 21 202 Laterite road 1.20 [ 1.20 ] Km 9,534,417 3.000 Width (m) 500.000 Earth fill m3 11,441,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,300,000

Kampong Siem, Ou Svay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030610/05/01 TSO Ou Chhengloch Project Type Rural Transport 17,400,000
Ou Svay 2 201 Earth road 1.30 [ 1.30 ] Km 12,307,692 4.000 Width (m) 3,042.000 Earth fill m3 16,000,000
Ou Svay 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,400,000
Contract ID 030610/05/02 TSO Ou Chhengloch Project Type Rural Domestic Water Supplies 13,350,000
Khael Chey 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,450,000 65.000 Depth (m) 100.000 Diameter (mm) 4,450,000
Ou Thnong 2 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,450,000 65.000 Depth (m) 100.000 Diameter (mm) 4,450,000
Trapeang Kak 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,450,000 65.000 Depth (m) 100.000 Diameter (mm) 4,450,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,350,000

Kampong Siem, Ro'ang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030611/05/01 TSO Ou Chhengloch Project Type Rural Domestic Water Supplies 38,220,000
Tuol Roka 1 111 Ring well 5.00 [ 5.00 ] Place 2,730,000 1.200 Depth (m) 15.000 Diameter (m) 13,650,000
Ro'ang Kraom 2 111 Ring well 5.00 [ 5.00 ] Place 2,730,000 1.200 Depth (m) 15.000 Diameter (m) 13,650,000
Ro'ang Leu 3 111 Ring well 4.00 [ 4.00 ] Place 2,730,000 1.200 Depth (m) 15.000 Diameter (m) 10,920,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,220,000

Kampong Siem, Rumchek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030612/05/01 TSO Ou Chhengloch Project Type Irrigation 28,900,000
Chheu Teal Srot Leu 1 410 Earth dam 0.38 [ 0.38 ] Km 75,260,417 1.000 Max. height (m) 5,409.000 Volume (m3) 28,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,900,000

Kampong Siem, Srak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030613/05/01 TSO Ou Chhengloch Project Type Rural Transport 26,885,000
Srak 1 201 Earth road 0.53 [ 0.53 ] Km 10,500,000 4.000 Width (m) 1,709.000 Earth fill m3 5,565,000
Srak 2 201 Earth road 1.16 [ 1.68 ] Km 10,500,000 3.000 Width (m) 2,345.000 Earth fill m3 17,640,000
Srak 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Srak 4 281 Width restriction posts 1.00 [ 1.00 ] Place 80,000 0.400 1.500 80,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,885,000

Kampong Siem, Trean

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030614/05/01 TSO Ou Chhengloch Project Type Rural Transport 25,350,000
Poun 1 202 Laterite road 0.85 [ 0.85 ] Km 7,851,529 3.500 Width (m) 111.000 Earth fill m3 6,673,800
Paen 2 202 Laterite road 0.53 [ 0.53 ] Km 7,851,595 3.500 Width (m) 111.000 Earth fill m3 4,184,900
Veal Kriel 3 202 Laterite road 0.65 [ 0.65 ] Km 7,851,538 3.500 Width (m) 111.000 Earth fill m3 5,103,500
Trean 4 202 Laterite road 0.77 [ 0.77 ] Km 7,851,495 3.500 Width (m) 111.000 Earth fill m3 6,037,800
Trean 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Trean 6 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 0.000 650,000
Paen 7 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 0.000 650,000
Poun 8 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 0.000 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,350,000

Kampong Siem, Vihear Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030615/05/01 TSO Ou Chhengloch Project Type Rural Transport 27,733,900
Pongro 1 202 Laterite road 0.44 [ 0.44 ] Km 13,764,108 3.500 Width (m) 111.000 Earth fill m3 6,097,500
Kouk Totea 2 202 Laterite road 0.85 [ 0.85 ] Km 13,764,000 3.000 Width (m) 111.000 Earth fill m3 11,699,400
Prasat 3 202 Laterite road 0.09 [ 0.09 ] Km 13,763,830 2.500 Width (m) 111.000 Earth fill m3 1,293,800
Prasat 4 202 Laterite road 0.41 [ 0.41 ] Km 13,763,902 3.500 Width (m) 111.000 Earth fill m3 5,643,200
Kouk Totea 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Prasat 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 4.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,733,900

Kang Meas, Angkor Ban

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030701/05/01 TSO Sum Chin Project Type Irrigation 35,003,600
Angkor Ban Ti Pram 1 420 Canal 0.50 [ 0.88 ] Km 40,004,114 1.500 Depth (m) 7,227.000 Volume (m3) 35,003,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,003,600

Kang Meas, Kang Ta Noeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030702/05/01 TSO Sum Chin Project Type Irrigation 32,378,200
Phum Ti Pir 1 420 Canal 0.98 [ 0.98 ] Km 10,700,000 1.500 Depth (m) 2,700.000 Volume (m3) 10,486,000
Phum Ti Pram 2 420 Canal 0.40 [ 0.40 ] Km 10,700,000 1.800 Depth (m) 1,735.000 Volume (m3) 4,280,000
Phum Ti Prambuon 3 420 Canal 0.64 [ 1.05 ] Km 10,700,000 1.400 Depth (m) 1,709.000 Volume (m3) 11,192,200
Phum Ti Prambuon 5 420 Canal 0.60 [ 0.60 ] Km 10,700,000 1.800 Depth (m) 2,600.000 Volume (m3) 6,420,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,378,200

Kang Meas, Khchau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030703/05/01 TSO Sum Chin Project Type Irrigation 34,578,200
Khchau Ti Muoy 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 8,000,000 2.000 Total span (m) 4.000 Width (m) 8,000,000
Khchau Ti Bei 2 420 Canal 0.87 [ 1.47 ] Km 18,080,409 2.000 Depth (m) 4,575.000 Volume (m3) 26,578,201
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,578,201

Kang Meas, Peam Chi Kang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030704/05/01 TSO Sum Chin Project Type Irrigation 18,414,600
Damnak Svay 1 410 Earth dam 1.00 [ 1.00 ] Km 12,121,800 1.500 Max. height (m) 3,465.000 Volume (m3) 12,121,800
Sach Sou 2 410 Earth dam 0.84 [ 0.84 ] Km 7,536,287 1.500 Max. height (m) 1,763.000 Volume (m3) 6,292,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,414,600

Kang Meas, Preaek Koy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030705/05/01 TSO Sum Chin Project Type Irrigation 21,500,000
Kouhe 1 410 Earth dam 1.10 [ 1.10 ] Km 19,545,455 1.500 Max. height (m) 6,611.000 Volume (m3) 21,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,500,000
Contract ID 030705/05/02 TSO Sum Chin Project Type Rural Transport 13,800,000
Ou Svay Lech 1 201 Earth road 0.35 [ 0.35 ] Km 39,428,571 3.000 Width (m) 2,277.000 Earth fill m3 13,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,800,000

Kang Meas, Preaek Krabau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030706/05/01 TSO Sum Chin Project Type Irrigation 30,004,000
Tuek Chenh 1 420 Canal 0.05 [ 0.05 ] Km 133,400,000 1.500 Depth (m) 2,567.000 Volume (m3) 6,670,000
Andoung Ta Ong 2 420 Canal 0.06 [ 0.06 ] Km 133,400,000 2.000 Depth (m) 2,042.000 Volume (m3) 8,004,000
Andoung Ta Ong 3 420 Canal 0.04 [ 0.04 ] Km 133,400,000 1.800 Depth (m) 1,606.000 Volume (m3) 5,336,000
Andoung Ta Ong 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,990,000 0.600 Diameter (m) 4.000 Length (m) 1,990,000
Andoung Ta Ong 6 420 Canal 0.06 [ 0.06 ] Km 133,400,000 1.800 Depth (m) 3,384.000 Volume (m3) 8,004,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,004,000

Kang Meas, Reay Pay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030707/05/01 TSO Sum Chin Project Type Rural Transport 41,020,000
Reay Pay Kraom 1 201 Earth road 1.91 [ 1.91 ] Km 10,868,762 4.000 Width (m) 5,436.000 Earth fill m3 20,802,810
Reay Pay Kraom 2 211 Single pipe culvert 1.00 [ 5.00 ] Place 3,500,000 0.800 Diameter (m) 8.000 Length (m) 17,500,000
Tuol Bei 3 201 Earth road 0.25 [ 0.25 ] Km 10,868,761 3.500 Width (m) 1,861.000 Earth fill m3 2,717,190
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,020,000

Kang Meas, Roka ar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030708/05/01 TSO Sum Chin Project Type Irrigation 37,066,700
Preaek Liv Ti Pir 1 410 Earth dam 1.10 [ 1.70 ] Km 21,829,623 1.700 Max. height (m) 6,507.000 Volume (m3) 37,066,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,066,700

Kang Meas, Roka Koy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030709/05/01 TSO Sum Chin Project Type Irrigation 31,050,000
Pongro 1 410 Earth dam 2.00 [ 2.70 ] Km 11,500,000 1.200 Max. height (m) 6,047.000 Volume (m3) 31,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,050,000

Kang Meas, Sdau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030710/05/01 TSO Sum Chin Project Type Irrigation 22,579,000
Anlong Kokir 8 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 19,179,000 2.000 Total span (m) 4.000 Width (m) 19,179,000
Khpob Leu 9 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,400,000 0.600 Diameter (m) 4.000 Width (m) 3,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,579,000
Contract ID 030710/05/02 TSO Sum Chin Project Type Rural Transport 7,007,000
Lvea Kraom 1 201 Earth road 0.34 [ 0.45 ] Km 15,467,991 3.000 Width (m) 1,165.000 Earth fill m3 7,007,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,007,000

Kang Meas, Sour Kong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030711/05/01 TSO Sum Chin Project Type Irrigation 40,697,800
Boeng Sang Lech 1 410 Earth dam 1.03 [ 1.94 ] Km 10,663,266 2.000 Max. height (m) 3,750.000 Volume (m3) 20,697,400
Boeng Sang Lech 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 14,000,000 2.000 Total span (m) 4.000 Width (m) 14,000,000
Boeng Sang Lech 3 211 Single pipe culvert 1.00 [ 2.00 ] Place 3,000,000 0.800 Diameter (m) 8.000 Length (m) 6,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,697,400

Kaoh Soutin, Kampong Reab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030801/05/01 TSO Yem Savong Project Type Rural Transport 32,800,000
Kampong Sdei Leu 1 201 Earth road 0.93 [ 0.93 ] Km 35,268,817 4.000 Width (m) 6,000.000 Earth fill m3 32,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,800,000

Kaoh Soutin, Kaoh Soutin

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030802/05/01 TSO Yem Savong Project Type Rural Transport 38,187,500
Phum Muoy 1 205 Concrete road 0.40 [ 0.40 ] Km 95,468,750 2.700 Width (m) 0.100 Earth fill m3 38,187,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,187,500

Kaoh Soutin, Lve

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030803/05/01 TSO Yem Savong Project Type Rural Transport 36,995,500
Bat Srei Totueng 1 201 Earth road 0.92 [ 0.92 ] Km 40,212,500 4.000 Width (m) 5,059.000 Earth fill m3 36,995,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,995,500

Kaoh Soutin, Moha Leaph

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030804/05/01 TSO Yem Savong Project Type Rural Transport 31,244,899
Moha Leaph Tboung 3 201 Earth road 0.40 [ 0.40 ] Km 40,843,300 4.000 Width (m) 2,307.000 Earth fill m3 16,337,320
Chong Preaek 4 201 Earth road 0.37 [ 0.37 ] Km 40,842,653 4.000 Width (m) 1,994.000 Earth fill m3 14,907,568
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,244,888

Kaoh Soutin, Moha Khnhoung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030805/05/01 TSO Yem Savong Project Type Irrigation 21,589,993
Khnhoung Leu 2 410 Earth dam 0.35 [ 0.35 ] Km 62,219,000 1.200 Max. height (m) 2,990.980 Volume (m3) 21,589,993
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,589,993
Contract ID 030805/05/02 TSO Yem Savong Project Type Rural Transport 12,080,000
Khnhoung Leu 3 201 Earth road 0.15 [ 0.15 ] Km 80,533,333 6.000 Width (m) 1,790.000 Earth fill m3 12,080,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,080,000

Kaoh Soutin, Peam Prathnuoh

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030806/05/01 TSO Yem Savong Project Type Rural Transport 38,299,896
Samraong 1 201 Earth road 0.63 [ 0.63 ] Km 46,349,200 4.500 Width (m) 3,993.000 Earth fill m3 29,199,996
Chi Haer 2 201 Earth road 0.30 [ 0.30 ] Km 30,333,000 4.000 Width (m) 1,233.000 Earth fill m3 9,099,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,299,896

Kaoh Soutin, Pongro

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030807/05/01 TSO Yem Savong Project Type Irrigation 29,010,000
Preaek Rumdeng Kaeut 1 420 Canal 0.30 [ 0.30 ] Km 96,700,000 2.000 Depth (m) 6,187.000 Volume (m3) 29,010,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,010,000

Kaoh Soutin, Preaek Ta Nong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030808/05/01 TSO Yem Savong Project Type Irrigation 37,986,509
Preaek Ta Nong Dabbei 1 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 4,500,000 0.800 Diameter (m) 8.000 Width (m) 4,500,000
Preaek Ta Nong Dabbei 2 410 Earth dam 0.63 [ 0.63 ] Km 53,407,510 3.000 Max. height (m) 6,036.670 Volume (m3) 33,486,509
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,986,509

Krouch Chhmar, Chhuk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030901/05/01 TSO Ly Khamchuor Project Type Irrigation 31,328,300
Krabei Kreak 1 410 Earth dam 0.55 [ 0.55 ] Km 43,687,818 1.789 Max. height (m) 4,201.000 Volume (m3) 24,028,300
Krabei Kreak 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 3,650,000 0.600 Diameter (m) 7.000 Width (m) 7,300,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,328,300

Krouch Chhmar, Chumnik

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030902/05/01 TSO Ly Khamchuor Project Type Rural Transport 5,748,600
Preaek Ta Hok 1 201 Earth road 0.55 [ 0.55 ] Km 10,452,000 3.000 Width (m) 938.000 Earth fill m3 5,748,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  5,748,600
Contract ID 030902/05/02 TSO Ly Khamchuor Project Type Irrigation 27,000,000
Preaek Ta Hok 1 410 Earth dam 0.71 [ 0.71 ] Km 37,921,348 1.329 Max. height (m) 4,791.000 Volume (m3) 27,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,000,000

Krouch Chhmar, Kampong Treas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030903/05/01 TSO Ly Khamchuor Project Type Rural Transport 31,814,000
Phum Muoy 1 201 Earth road 1.80 [ 1.80 ] Km 10,604,666 4.000 Width (m) 3,037.000 Earth fill m3 19,088,398
Phum Pir 2 201 Earth road 1.20 [ 1.20 ] Km 10,604,668 4.000 Width (m) 2,025.000 Earth fill m3 12,725,602
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,814,000

Krouch Chhmar, Kaoh Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030904/05/01 TSO Ly Khamchuor Project Type Rural Transport 23,731,300
Chuor Kandal 1 205 Concrete road 0.15 [ 0.15 ] Km 79,104,333 2.800 Width (m) 0.100 Earth fill m3 11,865,650
Kaoh Meun Nong 2 205 Concrete road 0.15 [ 0.15 ] Km 79,104,333 2.800 Width (m) 0.100 Earth fill m3 11,865,650
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,731,300

Krouch Chhmar, Krouch Chhmar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030905/05/01 TSO Ly Khamchuor Project Type Rural Transport 32,669,200
Khsach Prachheh Kandal 1 201 Earth road 1.70 [ 1.70 ] Km 14,204,000 4.000 Width (m) 3,738.000 Earth fill m3 24,146,800
Khsach Prachheh Kraom 2 201 Earth road 0.60 [ 0.60 ] Km 14,204,000 4.000 Width (m) 1,319.000 Earth fill m3 8,522,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,669,200

Krouch Chhmar, Peus Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030906/05/01 TSO Ly Khamchuor Project Type Rural Transport 25,900,000
Preaek Krouch 1 201 Earth road 0.60 [ 0.60 ] Km 11,283,200 5.000 Width (m) 924.000 Earth fill m3 6,769,920
Ampil 2 201 Earth road 0.65 [ 0.65 ] Km 11,283,200 5.000 Width (m) 1,001.000 Earth fill m3 7,334,080
Ampil 3 201 Earth road 0.22 [ 0.22 ] Km 53,618,182 4.000 Width (m) 1,610.000 Earth fill m3 11,796,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,900,000

Krouch Chhmar, Peus Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030907/05/01 TSO Ly Khamchuor Project Type Rural Transport 27,165,500
Poes 1 201 Earth road 0.30 [ 0.30 ] Km 20,896,540 5.000 Width (m) 1,023.000 Earth fill m3 6,268,962
Ampil 2 201 Earth road 1.00 [ 1.00 ] Km 20,896,538 5.000 Width (m) 3,414.000 Earth fill m3 20,896,538
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,165,500

Krouch Chhmar, Preaek a Chi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030908/05/01 TSO Ly Khamchuor Project Type Rural Transport 29,766,900
Phum Ti Muoy 1 201 Earth road 1.70 [ 1.70 ] Km 12,752,558 4.000 Width (m) 3,313.000 Earth fill m3 21,679,348
Phum Ti Pir 2 201 Earth road 0.45 [ 0.45 ] Km 12,752,560 4.000 Width (m) 877.000 Earth fill m3 5,738,652
Phum Ti Pir 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,348,900 0.800 Diameter (m) 6.000 Length (m) 2,348,900
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,766,900

Krouch Chhmar, Roka Khnaor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030909/05/01 TSO Ly Khamchuor Project Type Rural Transport 35,000,000
Phum Ti Muoy 1 201 Earth road 0.81 [ 0.81 ] Km 11,182,107 4.000 Width (m) 1,409.000 Earth fill m3 9,057,507
Phum Ti Pir 2 201 Earth road 0.60 [ 0.60 ] Km 11,182,107 4.000 Width (m) 1,043.000 Earth fill m3 6,709,264
Phum Ti Bei 3 201 Earth road 0.67 [ 0.67 ] Km 11,853,749 4.000 Width (m) 1,164.000 Earth fill m3 7,942,012
Phum Ti Buon 4 201 Earth road 1.05 [ 1.05 ] Km 10,753,540 4.000 Width (m) 1,825.000 Earth fill m3 11,291,217
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,000,000

Krouch Chhmar, Svay Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030910/05/01 TSO Ly Khamchuor Project Type Rural Transport 30,011,900
Phum Ti Bei 1 201 Earth road 1.05 [ 1.05 ] Km 14,291,380 4.500 Width (m) 2,330.000 Earth fill m3 15,005,949
Phum Ti Buon 2 201 Earth road 0.85 [ 0.85 ] Km 14,291,380 4.500 Width (m) 1,885.000 Earth fill m3 12,147,673
Phum Ti Pram 3 201 Earth road 0.20 [ 0.20 ] Km 14,291,390 4.500 Width (m) 443.000 Earth fill m3 2,858,278
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,011,900

Krouch Chhmar, Trea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030911/05/01 TSO Ly Khamchuor Project Type Rural Transport 31,500,000
Kdol Leu 1 201 Earth road 1.50 [ 1.50 ] Km 15,000,000 5.000 Width (m) 3,398.000 Earth fill m3 22,500,000
Kdol Kandal 2 201 Earth road 0.60 [ 0.60 ] Km 15,000,000 5.000 Width (m) 1,360.000 Earth fill m3 9,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,500,000

Krouch Chhmar, Tuol Snuol

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030912/05/01 TSO Ly Khamchuor Project Type Rural Transport 39,830,000
Tuol Snuol 1 201 Earth road 1.68 [ 1.68 ] Km 18,708,333 4.000 Width (m) 7,208.000 Earth fill m3 31,430,000
Tuol Snuol 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.800 Diameter (m) 7.000 Length (m) 4,000,000
Tuol Snuol 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,400,000 1.000 Diameter (m) 7.000 Length (m) 4,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,830,000

Memot, Chan Mul

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031001/05/01 TSO Mith Phally Project Type Rural Transport 25,999,000
Ta Kaev 1 201 Earth road 1.78 [ 1.78 ] Km 11,053,352 4.000 Width (m) 4,541.000 Earth fill m3 19,619,700
Kantraeuy 2 201 Earth road 0.36 [ 0.36 ] Km 11,053,611 4.000 Width (m) 858.000 Earth fill m3 3,979,300
Ta Kaev 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Kantraeuy 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,999,000

Memot, Choam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031002/05/01 TSO Mith Phally Project Type Rural Transport 28,974,800
Leach Kraom 1 201 Earth road 0.93 [ 0.93 ] Km 11,800,000 4.000 Width (m) 1,962.000 Earth fill m3 10,950,400
Boeng Chroung 2 201 Earth road 1.36 [ 1.36 ] Km 11,800,000 4.000 Width (m) 2,857.000 Earth fill m3 16,024,400
Leach Kraom 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Boeng Chroung 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,974,800

Memot, Choam Kravien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031003/05/01 TSO Mith Phally Project Type Rural Transport 29,800,000
Khmuor 1 240 Concrete bridge (general) 1.00 [ 1.00 ] Place 29,800,000 2.000 4.000 29,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,800,000
Contract ID 031003/05/02 TSO Mith Phally Project Type Rural Transport 25,500,000
Kravien Cheung 1 201 Earth road 1.54 [ 1.54 ] Km 12,249,968 4.000 Width (m) 3,265.000 Earth fill m3 18,877,200
Khmuor 2 201 Earth road 0.46 [ 0.46 ] Km 12,250,109 4.000 Width (m) 600.000 Earth fill m3 5,622,800
Kravien Cheung 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,500,000

Memot, Choam Ta Mau

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031004/05/01 TSO Mith Phally Project Type Rural Transport 31,499,500
Thma Totueng 1 201 Earth road 1.86 [ 1.86 ] Km 16,379,968 4.000 Width (m) 4,384.000 Earth fill m3 30,499,500
Thma Totueng 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,499,500

Memot, Dar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031005/05/01 TSO Doul Son Project Type Rural Transport 34,728,000
Spean 1 201 Earth road 3.00 [ 3.00 ] Km 7,296,842 4.000 Width (m) 5,250.000 Earth fill m3 21,890,526
Spean 2 201 Earth road 0.80 [ 0.80 ] Km 7,296,842 4.000 Width (m) 1,799.000 Earth fill m3 5,837,474
Spean 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Spean 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 4,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,728,000
Contract ID 031005/05/02 TSO Doul Son Project Type Rural Transport 10,736,000
Spean 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,817,600 0.800 Diameter (m) 6.000 Length (m) 2,817,600
Spean 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,299,000 0.800 Diameter (m) 6.000 Length (m) 3,299,000
Spean 3 212 Double pipe culvert 1.00 [ 10.00 ] Place 461,940 1.000 Diameter (m) 6.000 Length (m) 4,619,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,736,000

Memot, Kampoan

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031006/05/01 TSO Mith Phally Project Type Rural Transport 35,000,000
Srae Saom Thmei 1 201 Earth road 1.92 [ 1.92 ] Km 10,633,212 4.000 Width (m) 2,925.000 Earth fill m3 20,426,400
Srae Saom Chas 2 201 Earth road 1.03 [ 1.03 ] Km 10,633,333 4.000 Width (m) 2,271.000 Earth fill m3 10,973,600
Srae Saom Thmei 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Srae Saom Chas 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,000,000

Memot, Memong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031007/05/01 TSO Mith Phally Project Type Rural Transport 32,871,200
Cheach 2 201 Earth road 1.05 [ 1.23 ] Km 14,729,116 4.000 Width (m) 2,963.000 Earth fill m3 18,161,000
Memong 3 201 Earth road 0.59 [ 0.68 ] Km 14,681,778 4.000 Width (m) 2,124.000 Earth fill m3 9,910,200
Cheach 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Memong 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Memong 6 212 Double pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,871,200

Memot, Memot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031008/05/01 TSO Doul Son Project Type Rural Transport 51,488,999
Tboung Voat 2 201 Earth road 0.15 [ 0.15 ] Km 15,180,000 4.000 Width (m) 396.000 Earth fill m3 2,277,000
Choam M'aor 3 201 Earth road 0.60 [ 0.60 ] Km 15,180,000 4.000 Width (m) 3,048.000 Earth fill m3 9,108,000
Nang Krapeu 4 201 Earth road 0.95 [ 0.95 ] Km 15,180,000 4.000 Width (m) 3,586.000 Earth fill m3 14,421,000
Memot Kandal 5 201 Earth road 0.93 [ 0.93 ] Km 15,185,224 4.000 Width (m) 3,862.000 Earth fill m3 14,182,999
Memot Kandal 6 211 Single pipe culvert 5.00 [ 5.00 ] Place 1,500,000 0.600 Diameter (m) 6.000 Length (m) 7,500,000
Choam M'aor 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 6.000 Length (m) 1,500,000
Choam M'aor 8 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,500,000 0.800 Diameter (m) 6.000 Length (m) 2,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  51,488,999

Memot, Rung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031010/05/01 TSO Doul Son Project Type Rural Transport 36,425,949
Rung 1 201 Earth road 1.70 [ 2.49 ] Km 12,823,656 4.000 Width (m) 3,590.000 Earth fill m3 31,943,727
Beng 2 201 Earth road 0.10 [ 0.10 ] Km 12,822,220 4.000 Width (m) 202.000 Earth fill m3 1,282,222
Rung 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 1,200,000
Rung 4 222 Double cell box culvert 1.00 [ 1.00 ] Place 2,000,000 7.250 Total Span (m) 4.500 Width(m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,425,949

Memot, Rumchek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031011/05/01 TSO Mith Phally Project Type Rural Transport 33,848,200
Chheu Khloem 2 201 Earth road 0.71 [ 0.71 ] Km 15,819,608 4.000 Width (m) 1,739.000 Earth fill m3 11,295,200
Srae Pongro 3 201 Earth road 1.24 [ 1.24 ] Km 15,819,579 4.000 Width (m) 3,175.000 Earth fill m3 19,553,000
Chheu Khloem 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Srae Pongro 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,848,200

Memot, Tramung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031013/05/01 TSO Mith Phally Project Type Rural Transport 45,177,500
Ngeu Thum 1 201 Earth road 2.14 [ 2.14 ] Km 12,824,019 4.000 Width (m) 4,640.000 Earth fill m3 27,443,400
Chrey 2 201 Earth road 1.10 [ 1.38 ] Km 12,822,921 4.000 Width (m) 1,689.000 Earth fill m3 17,734,100
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,177,500

Memot, Tonlung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031014/05/01 TSO Mith Phally Project Type Rural Domestic Water Supplies 37,000,400
Pong Tuek 1 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,239,600 55.000 Depth (m) 100.000 Diameter (mm) 5,239,600
Kdol Kraom 2 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,239,600 60.000 Depth (m) 100.000 Diameter (mm) 5,239,600
Sla Phnum 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,239,600 75.000 Depth (m) 100.000 Diameter (mm) 5,239,600
Mkaor 4 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,239,600 65.000 Depth (m) 100.000 Diameter (mm) 5,239,600
Lvea Leu 5 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 5,239,600 55.000 Depth (m) 100.000 Diameter (mm) 5,239,600
Kdol Phsar 6 111 Ring well 1.00 [ 1.00 ] Place 2,700,600 13.000 Depth (m) 1.200 Diameter (m) 2,700,600
Changkum Kandal 7 111 Ring well 1.00 [ 1.00 ] Place 2,700,600 12.000 Depth (m) 1.200 Diameter (m) 2,700,600
Changkum Ti Muoy 8 111 Ring well 1.00 [ 1.00 ] Place 2,700,600 13.000 Depth (m) 1.200 Diameter (m) 2,700,600
Beng Kaong 9 111 Ring well 1.00 [ 1.00 ] Place 2,700,600 12.000 Depth (m) 1.200 Diameter (m) 2,700,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,000,400

Memot, Treak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031015/05/01 TSO Doul Son Project Type Rural Transport 25,125,600
Romeas Choul 1 201 Earth road 0.50 [ 0.50 ] Km 11,550,450 4.000 Width (m) 1,321.000 Earth fill m3 5,775,225
Romeas Choul 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 11,550,450 0.600 Diameter (m) 5.000 Length (m) 11,550,450
Khley 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 4,500,000
Khley 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 5.000 Length (m) 1,800,000
Khley 5 201 Earth road 1.00 [ 1.00 ] Km 1,500,000 4.000 Width (m) 2,144.000 Earth fill m3 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,125,675

Memot, Kokir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031016/05/01 TSO Mith Phally Project Type Rural Transport 32,961,600
Kokir Tboung 1 201 Earth road 0.98 [ 0.98 ] Km 13,300,000 4.000 Width (m) 2,244.000 Earth fill m3 13,047,300
Kokir Cheung 2 201 Earth road 0.97 [ 0.97 ] Km 13,300,000 4.000 Width (m) 2,222.000 Earth fill m3 12,914,300
Kokir Tboung 3 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 4,000,000
Kokir Cheung 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,961,600

Ou Reang Ov, Ampil Ta Pok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031101/05/01 TSO Chea Theng Project Type Irrigation 45,000,000
Prey Sralau 1 410 Earth dam 0.21 [ 0.21 ] Km 82,857,143 1.500 Max. height (m) 1,254.630 Volume (m3) 17,400,000
Prey Sralau 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 6,000,000 2.000 Total span (m) 4.500 Width (m) 6,000,000
Prey Sralau 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 7.000 Width (m) 2,100,000
Chrey Ta Sour 4 410 Earth dam 0.18 [ 0.18 ] Km 81,967,213 1.500 Max. height (m) 2,252.740 Volume (m3) 15,000,000
Chrey Ta Sour 5 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 12.000 Width (m) 3,000,000
Chrey Ta Sour 6 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 12.000 Width (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,000,000

Ou Reang Ov, Chak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031102/05/01 TSO Chea Theng Project Type Rural Transport 18,117,500
Prasat 1 202 Laterite road 1.60 [ 1.60 ] Km 6,565,876 3.500 Width (m) 0.000 Earth fill m3 10,505,401
Prasat 2 281 Width restriction posts 1.00 [ 1.00 ] Place 718,000 0.400 0.000 718,000
Ou Laok 3 202 Laterite road 1.05 [ 1.05 ] Km 6,565,876 3.500 Width (m) 0.000 Earth fill m3 6,894,170
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,117,571
Contract ID 031102/05/02 TSO Chea Theng Project Type Rural Transport 23,461,400
Chak 1 201 Earth road 0.37 [ 0.37 ] Km 10,278,400 4.000 Width (m) 1,138.000 Earth fill m3 3,751,616
Chak 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,655,300 0.800 Diameter (m) 6.000 Length (m) 3,655,300
Trach Chrum 3 201 Earth road 0.64 [ 1.42 ] Km 10,278,400 4.000 Width (m) 1,746.000 Earth fill m3 14,574,771
Trach Chrum 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,479,800 0.600 Diameter (m) 5.000 Length (m) 1,479,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,461,487

Ou Reang Ov, Damrel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031103/05/01 TSO Chea Theng Project Type Rural Transport 36,800,000
Peuk 1 202 Laterite road 2.07 [ 2.07 ] Km 7,363,065 3.500 Width (m) 0.000 Earth fill m3 15,219,455
Peuk 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Samraong 3 202 Laterite road 1.27 [ 1.27 ] Km 7,363,065 3.500 Width (m) 0.000 Earth fill m3 9,380,545
Samraong 4 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.400 0.000 700,000
Sangkae 5 202 Laterite road 1.05 [ 1.05 ] Km 6,800,000 3.500 Width (m) 0.000 Earth fill m3 7,126,400
Chrey Sokhom 6 202 Laterite road 0.20 [ 0.20 ] Km 6,800,000 3.500 Width (m) 0.000 Earth fill m3 1,373,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,800,000

Ou Reang Ov, Kong Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031104/05/01 TSO Chea Theng Project Type Irrigation 24,041,700
Tuol Sama 1 410 Earth dam 0.36 [ 0.36 ] Km 33,165,374 2.000 Max. height (m) 2,478.000 Volume (m3) 11,972,700
Tuol Sama 2 452 Single pipe Culvert with gate 1.00 [ 2.00 ] Place 6,034,500 1.000 Diameter (m) 8.000 Width (m) 12,069,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,041,700
Contract ID 031104/05/02 TSO Chea Theng Project Type Rural Domestic Water Supplies 25,400,000
Ou Popul 1 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 2,630,000 38.000 Depth (m) 100.000 Diameter (mm) 2,630,000
Tuol Trach 2 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 4,810,000 38.000 Depth (m) 100.000 Diameter (mm) 4,810,000
Changva 3 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 4,810,000 50.000 Depth (m) 100.000 Diameter (mm) 4,810,000
Ou Damray 4 123 Drilled well with Afridev pump 1.00 [ 1.00 ] Place 2,630,000 50.000 Depth (m) 100.000 Diameter (mm) 2,630,000
Thnal Kaong 5 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 2,630,000 38.000 Depth (m) 100.000 Diameter (mm) 2,630,000
Kong Chey 6 121 Drilled well with VN no 6 pump 1.00 [ 1.00 ] Place 2,630,000 38.000 Depth (m) 100.000 Diameter (mm) 2,630,000
Cheung Voat 7 121 Drilled well with VN no 6 pump 2.00 [ 2.00 ] Place 2,630,000 38.000 Depth (m) 100.000 Diameter (mm) 5,260,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,400,000

Ou Reang Ov, Mien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031105/05/01 TSO Chea Theng Project Type Rural Transport 18,139,900
Mien 2 202 Laterite road 0.70 [ 0.70 ] Km 7,922,978 3.500 Width (m) 0.000 Earth fill m3 5,546,085
Kampul Serei 3 202 Laterite road 1.32 [ 1.32 ] Km 7,922,978 3.500 Width (m) 0.000 Earth fill m3 10,450,408
Kampul Serei 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,454,800 0.600 Diameter (m) 5.000 Length (m) 1,454,800
Kampul Serei 5 281 Width restriction posts 1.00 [ 1.00 ] Place 688,700 0.400 0.000 688,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,139,993
Contract ID 031105/05/02 TSO Chea Theng Project Type Rural Transport 17,691,400
Me Loung 1 201 Earth road 0.55 [ 0.55 ] Km 13,178,365 4.000 Width (m) 1,482.000 Earth fill m3 7,248,101
Me Loung 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,492,200 0.600 Diameter (m) 5.000 Length (m) 1,492,200
Mien 3 201 Earth road 0.57 [ 0.57 ] Km 13,178,365 4.000 Width (m) 1,720.000 Earth fill m3 7,458,954
Mien 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,492,200 0.600 Diameter (m) 5.000 Length (m) 1,492,200
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,691,455

Ou Reang Ov, Preah Theat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031107/05/01 TSO Chea Theng Project Type Rural Transport 45,900,000
Phnum 1 202 Laterite road 2.11 [ 2.11 ] Km 6,647,652 3.500 Width (m) 111.000 Earth fill m3 14,013,251
Phnum 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,000,000 0.800 Diameter (m) 5.000 Length (m) 4,000,000
Phnum 3 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.400 0.000 700,000
Tuol Thkov 4 202 Laterite road 0.90 [ 0.90 ] Km 6,647,652 3.500 Width (m) 0.000 Earth fill m3 5,982,887
Tuol Pnov 5 202 Laterite road 0.30 [ 0.30 ] Km 6,647,652 3.500 Width (m) 0.000 Earth fill m3 1,994,296
Tuol Pnov 6 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.400 0.000 700,000
Trapeang Neang 7 202 Laterite road 1.25 [ 1.25 ] Km 6,647,652 3.500 Width (m) 0.000 Earth fill m3 8,309,566
Tuol Khleang 8 202 Laterite road 0.14 [ 0.14 ] Km 5,755,396 3.500 Width (m) 0.000 Earth fill m3 805,755
Tuol Khleang 9 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.400 0.000 700,000
Srae Mien 10 202 Laterite road 0.90 [ 0.90 ] Km 5,755,396 3.500 Width (m) 0.000 Earth fill m3 5,179,856
Srae Mien 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Boeng Kang 12 202 Laterite road 0.35 [ 0.35 ] Km 5,755,396 3.500 Width (m) 0.000 Earth fill m3 2,014,388
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,900,000

Ou Reang Ov, Tuol Sophi

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031108/05/01 TSO Chea Theng Project Type Rural Transport 19,000,000
Tuol Sophi 1 202 Laterite road 0.74 [ 0.74 ] Km 6,532,898 2.500 Width (m) 0.000 Earth fill m3 4,853,943
Tuol Sophi 2 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,100,000 0.800 Diameter (m) 5.000 Length (m) 2,100,000
Tuol Sophi 3 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.400 0.000 700,000
Ta Ngin 4 202 Laterite road 0.72 [ 0.72 ] Km 6,532,898 2.500 Width (m) 0.000 Earth fill m3 4,729,818
Ta Ngin 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Trapeang Ph'av 6 202 Laterite road 0.68 [ 0.68 ] Km 6,532,898 2.500 Width (m) 0.000 Earth fill m3 4,416,239
Trapeang Ph'av 7 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.400 0.000 700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,000,000
Contract ID 031108/05/02 TSO Chea Theng Project Type Rural Transport 12,546,400
Trapeang Lvea Tboung 1 201 Earth road 0.97 [ 0.97 ] Km 9,800,000 4.000 Width (m) 1,687.000 Earth fill m3 9,486,400
Trapeang Lvea Tboung 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,530,000 0.600 Diameter (m) 5.000 Length (m) 3,060,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  12,546,400

Ponhea Kraek, Doun Tei

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031202/05/01 TSO Doul Son Project Type Rural Domestic Water Supplies 45,407,000
Pou Thum 1 131 Open mixed well 2.00 [ 2.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 4,540,700
Angkor Knong 2 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Reul Leu 3 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Pouthi Proeks Lech 4 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Pouthi Proeks Kaeut 5 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Spean Chrey 6 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Ta Ni 7 131 Open mixed well 2.00 [ 2.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 4,540,700
Sovann Mealea 8 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Svay Sokhom 9 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Angkor Krau 10 131 Open mixed well 3.00 [ 3.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 6,811,050
Roul Ph'aem 11 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Chhuk Sa 12 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Dountei 13 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Reul Kraom 14 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Kouk Neavea 15 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Bos Ruessei 16 131 Open mixed well 1.00 [ 1.00 ] Place 2,270,350 5.000 Depth (m) 1,000.000 Diameter (mm) 2,270,350
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  45,407,000

Ponhea Kraek, Kak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031203/05/01 TSO Doul Son Project Type Rural Transport 25,514,000
Ruessei Chuor 1 202 Laterite road 1.22 [ 1.22 ] Km 11,200,000 3.500 Width (m) 640.500 Earth fill m3 13,664,000
Ruessei Chuor 2 222 Double cell box culvert 1.00 [ 1.00 ] Place 10,880,000 5.000 Total Span (m) 3.000 Width(m) 10,880,000
Ruessei Chuor 3 281 Width restriction posts 1.00 [ 1.00 ] Place 970,000 0.400 1.500 970,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,514,000
Contract ID 031203/05/02 TSO Doul Son Project Type Rural Domestic Water Supplies 23,757,800
Ampil 1 131 Open mixed well 3.00 [ 3.00 ] Place 2,159,800 5.000 Depth (m) 1,000.000 Diameter (mm) 6,479,400
Ta Am 2 131 Open mixed well 2.00 [ 2.00 ] Place 2,159,800 5.000 Depth (m) 1,000.000 Diameter (mm) 4,319,600
Ponley 4 131 Open mixed well 1.00 [ 1.00 ] Place 2,159,800 5.000 Depth (m) 1,000.000 Diameter (mm) 2,159,800
Sambour 5 131 Open mixed well 2.00 [ 2.00 ] Place 2,159,800 5.000 Depth (m) 1,000.000 Diameter (mm) 4,319,600
Bos Ti 6 131 Open mixed well 1.00 [ 1.00 ] Place 2,159,800 5.000 Depth (m) 1,000.000 Diameter (mm) 2,159,800
Krouch 7 131 Open mixed well 1.00 [ 1.00 ] Place 2,159,800 5.000 Depth (m) 1,000.000 Diameter (mm) 2,159,800
Angkaeng 8 131 Open mixed well 1.00 [ 1.00 ] Place 2,159,800 5.000 Depth (m) 1,000.000 Diameter (mm) 2,159,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,757,800

Ponhea Kraek, Kandaol Chrum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031204/05/01 TSO Doul Son Project Type Rural Transport 51,017,100
Chey Nikom 1 202 Laterite road 1.25 [ 1.25 ] Km 7,994,900 3.500 Width (m) 656.250 Earth fill m3 9,993,625
Ampuk 2 202 Laterite road 1.75 [ 1.75 ] Km 7,994,900 3.500 Width (m) 918.750 Earth fill m3 13,991,075
Ampuk 3 202 Laterite road 1.03 [ 1.03 ] Km 7,994,900 3.500 Width (m) 540.750 Earth fill m3 8,234,747
Ampuk 4 202 Laterite road 1.02 [ 1.02 ] Km 7,994,900 3.500 Width (m) 535.500 Earth fill m3 8,154,798
Ampuk 5 202 Laterite road 0.11 [ 0.11 ] Km 7,994,900 3.500 Width (m) 58.800 Earth fill m3 895,429
Kouk Lvieng 6 202 Laterite road 1.00 [ 1.00 ] Km 7,994,900 3.500 Width (m) 525.000 Earth fill m3 7,994,900
Kouk Lvieng 7 281 Width restriction posts 1.00 [ 1.00 ] Place 876,300 0.400 1.500 876,300
Chey Nikom 8 281 Width restriction posts 1.00 [ 1.00 ] Place 876,300 0.400 1.500 876,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  51,017,174

Ponhea Kraek, Kaong Kang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031205/05/01 TSO Doul Son Project Type Education 39,800,000
Kaong Kang Ti Muoy 1 320 Brick school (general) 2.00 [ 2.00 ] School room 19,900,000 24.000 Length (m) 9.000 Width (m) 39,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,800,000

Ponhea Kraek, Kraek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031206/05/01 TSO Doul Son Project Type Education 59,811,000
Chimoan Tboung 2 321 Brick school with tile roof 3.00 [ 3.00 ] School room 19,937,000 9.000 Length (m) 24.000 Width (m) 59,811,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  59,811,000
Contract ID 031206/05/02 TSO Doul Son Project Type Rural Domestic Water Supplies 18,750,000
Huoch Lech 1 131 Open mixed well 1.00 [ 1.00 ] Place 1,875,000 5.000 Depth (m) 1.000 Diameter (mm) 1,875,000
Apuk 2 131 Open mixed well 1.00 [ 1.00 ] Place 1,875,000 5.000 Depth (m) 1.000 Diameter (mm) 1,875,000
Tuol Angkrong 3 131 Open mixed well 2.00 [ 2.00 ] Place 1,875,000 5.000 Depth (m) 1.000 Diameter (mm) 3,750,000
Kraek Cheung 4 131 Open mixed well 1.00 [ 1.00 ] Place 1,875,000 5.000 Depth (m) 1.000 Diameter (mm) 1,875,000
Peuk 5 131 Open mixed well 2.00 [ 2.00 ] Place 1,875,000 5.000 Depth (m) 1.000 Diameter (mm) 3,750,000
L'ak 6 131 Open mixed well 1.00 [ 1.00 ] Place 1,875,000 5.000 Depth (m) 1.000 Diameter (mm) 1,875,000
Chi Peang 7 131 Open mixed well 1.00 [ 1.00 ] Place 1,875,000 5.000 Depth (m) 1.000 Diameter (mm) 1,875,000
Sakmakom 8 131 Open mixed well 1.00 [ 1.00 ] Place 1,875,000 5.000 Depth (m) 1.000 Diameter (mm) 1,875,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,750,000

Ponhea Kraek, Popel

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031207/05/01 TSO Doul Son Project Type Rural Domestic Water Supplies 40,002,600
Popel 1 123 Drilled well with Afridev pump 2.00 [ 2.00 ] Place 4,945,000 53.000 Depth (m) 100.000 Diameter (mm) 9,890,000
Thmei 2 131 Open mixed well 3.00 [ 3.00 ] Place 2,150,900 5.000 Depth (m) 1,000.000 Diameter (mm) 6,452,700
khsak 3 131 Open mixed well 2.00 [ 2.00 ] Place 2,150,900 5.000 Depth (m) 1,000.000 Diameter (mm) 4,301,800
Choam Thlok 4 131 Open mixed well 5.00 [ 5.00 ] Place 2,150,900 5.000 Depth (m) 1,000.000 Diameter (mm) 10,754,500
Stueng Cheung 5 131 Open mixed well 2.00 [ 2.00 ] Place 2,150,900 5.000 Depth (m) 1,000.000 Diameter (mm) 4,301,800
Thulchan 6 131 Open mixed well 2.00 [ 2.00 ] Place 2,150,900 5.000 Depth (m) 1,000.000 Diameter (mm) 4,301,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,002,600

Ponhea Kraek, Trapeang Phlong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031208/05/01 TSO Doul Son Project Type Rural Transport 44,142,000
Preah Phdau 3 202 Laterite road 1.75 [ 1.75 ] Km 11,243,200 3.500 Width (m) 918.750 Earth fill m3 19,675,600
Chrak Rumdeng 4 202 Laterite road 2.00 [ 2.00 ] Km 11,243,200 3.500 Width (m) 1,050.000 Earth fill m3 22,486,400
Preah Phdau 5 281 Width restriction posts 1.00 [ 1.00 ] Place 990,000 0.400 1.500 990,000
Chrak Rumdeng 6 281 Width restriction posts 1.00 [ 1.00 ] Place 990,000 0.400 1.500 990,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,142,000

Ponhea Kraek, Veal Mlu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031209/05/01 TSO Doul Son Project Type Rural Domestic Water Supplies 34,113,599
Kranhung 1 111 Ring well 6.00 [ 6.00 ] Place 1,823,509 8.000 Depth (m) 1.000 Diameter (m) 10,941,054
Veal Mlu 2 121 Drilled well with VN no 6 pump 5.00 [ 5.00 ] Place 2,811,000 30.000 Depth (m) 100.000 Diameter (mm) 14,055,000
Kabbas 3 111 Ring well 2.00 [ 2.00 ] Place 1,823,509 8.000 Depth (m) 1.000 Diameter (m) 3,647,018
Dambang Ampeak 4 111 Ring well 2.00 [ 2.00 ] Place 1,823,509 8.000 Depth (m) 1.000 Diameter (m) 3,647,018
Chrab 5 111 Ring well 1.00 [ 1.00 ] Place 1,823,509 8.000 Depth (m) 1.000 Diameter (m) 1,823,509
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,113,599

Prey Chhor, Baray

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031301/05/01 TSO Im Koy Project Type Rural Transport 37,000,000
Roul Chruk 1 201 Earth road 1.70 [ 1.70 ] Km 12,516,400 4.000 Width (m) 3,217.000 Earth fill m3 21,277,880
Samnak Cheung 2 201 Earth road 0.52 [ 0.52 ] Km 12,516,400 3.000 Width (m) 1,195.000 Earth fill m3 6,496,012
Prey Khchay 3 201 Earth road 0.53 [ 0.53 ] Km 12,516,400 3.000 Width (m) 1,316.000 Earth fill m3 6,646,208
Roul Chruk 4 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 1,289,950 0.600 Diameter (m) 5.000 Length (m) 1,289,950
Samnak Cheung 5 201 Earth road 1.00 [ 1.00 ] Km 1,289,950 0.600 Width (m) 5.000 Earth fill m3 1,289,950
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,000,000

Prey Chhor, Boeng Nay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031302/05/01 TSO Im Koy Project Type Rural Transport 23,300,000
Komar Reach 1 202 Laterite road 2.64 [ 2.64 ] Km 7,448,201 2.500 Width (m) 396.000 Earth fill m3 19,670,700
Boeng Nay 2 202 Laterite road 0.40 [ 0.40 ] Km 7,448,250 2.500 Width (m) 60.000 Earth fill m3 2,979,300
Komar Reach 3 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,300,000
Contract ID 031302/05/02 TSO Im Koy Project Type Rural Transport 21,000,000
Voat Chas 2 202 Laterite road 0.95 [ 0.95 ] Km 7,017,263 2.500 Width (m) 356.250 Earth fill m3 6,666,400
Thma Koul 3 202 Laterite road 1.20 [ 1.20 ] Km 7,017,250 2.500 Width (m) 450.000 Earth fill m3 8,420,700
Trapeang Thum 4 202 Laterite road 0.75 [ 0.75 ] Km 7,017,200 2.500 Width (m) 498.750 Earth fill m3 5,262,900
Voat Chas 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,000,000

Prey Chhor, Chrey Vien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031303/05/01 TSO Im Koy Project Type Irrigation 28,396,800
Trapeang Ampil 1 420 Canal 0.55 [ 0.55 ] Km 12,240,000 1.320 Depth (m) 2,222.120 Volume (m3) 6,732,000
Tuek Nuem 2 420 Canal 0.60 [ 0.60 ] Km 12,240,000 2.320 Depth (m) 1,856.750 Volume (m3) 7,344,000
Trapeang Sangkae 3 420 Canal 1.17 [ 1.17 ] Km 12,240,000 2.780 Depth (m) 4,674.990 Volume (m3) 14,320,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,396,800
Contract ID 031303/05/02 TSO Im Koy Project Type Rural Transport 15,500,000
Ou Kambot 1 201 Earth road 1.35 [ 1.35 ] Km 9,850,000 3.500 Width (m) 2,461.000 Earth fill m3 13,297,500
Ou Kambot 2 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,101,250 0.600 Diameter (m) 5.000 Length (m) 2,202,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,500,000

Prey Chhor, Khvet Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031304/05/01 TSO Im Koy Project Type Rural Transport 29,785,000
Pratheat 2 202 Laterite road 0.54 [ 0.54 ] Km 9,778,118 2.500 Width (m) 202.000 Earth fill m3 5,260,627
Dangkao 3 202 Laterite road 0.65 [ 0.65 ] Km 9,778,118 2.500 Width (m) 241.000 Earth fill m3 6,306,886
Dangkao 5 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,925,000 1.000 Diameter (m) 6.000 Length (m) 2,925,000
Ampil Thum 6 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Khvet Thum 7 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Khvet Thum 8 202 Laterite road 0.80 [ 0.80 ] Km 9,778,125 3.000 Width (m) 360.000 Earth fill m3 7,822,500
Ampil Thum 8 202 Laterite road 0.63 [ 0.63 ] Km 9,778,118 2.500 Width (m) 237.000 Earth fill m3 6,169,992
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,785,006

Prey Chhor, Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031305/05/01 TSO Im Koy Project Type Rural Transport 41,650,000
Rumduol 1 201 Earth road 0.96 [ 0.96 ] Km 12,846,250 3.000 Width (m) 1,554.000 Earth fill m3 12,332,400
Trapeang Poun 2 201 Earth road 0.88 [ 0.88 ] Km 12,846,311 3.000 Width (m) 1,677.000 Earth fill m3 11,317,600
Svay Pen 3 201 Earth road 0.23 [ 0.23 ] Km 12,846,256 3.000 Width (m) 626.000 Earth fill m3 2,916,100
Ta Meas 4 201 Earth road 0.40 [ 0.40 ] Km 12,846,135 3.000 Width (m) 899.000 Earth fill m3 5,151,300
Ta Kaev 5 201 Earth road 0.22 [ 0.22 ] Km 12,846,429 3.000 Width (m) 606.000 Earth fill m3 2,877,600
Trapeang Poun 6 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,495,000 0.600 Diameter (m) 6.000 Length (m) 2,990,000
Ta Meas 7 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 1,325,000 0.600 Diameter (m) 4.000 Length (m) 1,325,000
Ta Kaev 8 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,740,000 1.000 Diameter (m) 6.000 Length (m) 2,740,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,650,000

Prey Chhor, Krouch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031306/05/01 TSO Im Koy Project Type Rural Transport 13,500,000
Tuol Khpos 1 202 Laterite road 0.71 [ 0.71 ] Km 9,311,641 2.500 Width (m) 146.000 Earth fill m3 6,639,200
Krouch 3 202 Laterite road 0.67 [ 0.67 ] Km 9,311,544 2.500 Width (m) 136.000 Earth fill m3 6,210,800
Tuol Khpos 3 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,500,000
Contract ID 031306/05/02 TSO Im Koy Project Type Irrigation 14,012,800
Thmei 1 420 Canal 0.38 [ 0.38 ] Km 26,700,800 1.560 Depth (m) 1,660.000 Volume (m3) 10,012,800
Thmei 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Width (m) 2,000,000
Thmei 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Width (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,012,800

Prey Chhor, Lvea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031307/05/01 TSO Im Koy Project Type Rural Transport 34,516,800
Me Meang 1 202 Laterite road 2.45 [ 2.45 ] Km 8,264,000 2.500 Width (m) 919.000 Earth fill m3 20,246,800
Trapeang Chi Neang 2 202 Laterite road 0.28 [ 0.28 ] Km 8,263,929 2.500 Width (m) 105.000 Earth fill m3 2,313,900
Lvea 3 202 Laterite road 0.60 [ 0.97 ] Km 8,264,021 2.500 Width (m) 225.000 Earth fill m3 8,016,100
Trapeang Chi Neang 4 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,640,000 1.000 Diameter (m) 5.000 Length (m) 2,640,000
Me Meang 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Lvea 6 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,516,800

Prey Chhor, Mien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031308/05/01 TSO Im Koy Project Type Rural Transport 41,499,000
Ou Ta Nov 1 201 Earth road 2.00 [ 2.00 ] Km 9,135,995 3.000 Width (m) 2,010.000 Earth fill m3 18,271,990
Nam Ken 2 201 Earth road 1.27 [ 1.27 ] Km 9,135,995 3.000 Width (m) 1,532.000 Earth fill m3 11,602,714
Ou Sangkae 3 201 Earth road 0.56 [ 0.56 ] Km 9,135,995 3.000 Width (m) 1,549.000 Earth fill m3 5,125,293
Ou Ta Nov 4 210 Pipe culvert (general) 3.00 [ 3.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 3,900,000
Nam Ken 5 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 2,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,499,997

Prey Chhor, Prey Chhor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031309/05/01 TSO Im Koy Project Type Rural Transport 26,314,200
Prey Chhor 1 202 Laterite road 1.76 [ 1.76 ] Km 10,291,667 3.000 Width (m) 926.000 Earth fill m3 18,154,500
Sek Yum 2 202 Laterite road 0.28 [ 0.28 ] Km 10,291,519 2.500 Width (m) 106.000 Earth fill m3 2,912,500
Prey Chhor 3 202 Laterite road 0.38 [ 0.38 ] Km 10,279,167 2.500 Width (m) 144.000 Earth fill m3 3,947,200
Prey Chhor 4 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Sek Yum 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,314,200

Prey Chhor, Sour Saen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031310/05/01 TSO Im Koy Project Type Rural Transport 30,099,200
Sour Saen 1 202 Laterite road 0.66 [ 0.66 ] Km 8,758,000 3.000 Width (m) 298.000 Earth fill m3 5,797,796
Chambak Thma 2 202 Laterite road 1.04 [ 1.04 ] Km 8,758,000 3.000 Width (m) 468.000 Earth fill m3 9,099,562
Trapeang Reang 3 202 Laterite road 0.70 [ 0.70 ] Km 8,758,000 3.000 Width (m) 314.000 Earth fill m3 6,121,842
Sour Saen 4 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Chambak Thma 5 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,920,000 0.800 Diameter (m) 5.000 Length (m) 3,840,000
Trapeang Reang 6 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,920,000 0.800 Diameter (m) 5.000 Length (m) 3,840,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,099,200

Prey Chhor, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031311/05/01 TSO Im Koy Project Type Irrigation 32,300,000
Smer 1 420 Canal 0.36 [ 0.36 ] Km 14,731,181 1.920 Depth (m) 2,924.000 Volume (m3) 5,303,225
Smer 2 420 Canal 0.50 [ 0.50 ] Km 14,731,182 0.630 Depth (m) 313.000 Volume (m3) 7,365,591
Kandaol Kaong 3 420 Canal 0.60 [ 0.60 ] Km 14,731,182 0.370 Depth (m) 376.000 Volume (m3) 8,838,709
Svay Prey 4 420 Canal 0.40 [ 0.40 ] Km 14,731,180 0.190 Depth (m) 251.000 Volume (m3) 5,892,472
Smer 5 421 Concrete canal 0.01 [ 0.01 ] Km 612,500,000 0.700 Depth (m) 2.000 4,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,299,997

Prey Chhor, Srangae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031312/05/01 TSO Im Koy Project Type Irrigation 31,284,400
Trapeang Rung 1 420 Canal 0.60 [ 0.60 ] Km 17,584,485 1.810 Depth (m) 1,709.000 Volume (m3) 10,550,691
Senson Cheung 2 420 Canal 0.70 [ 1.18 ] Km 17,584,344 1.810 Depth (m) 5,114.250 Volume (m3) 20,733,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,284,391

Prey Chhor, Thma Pun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031313/05/01 TSO Im Koy Project Type Irrigation 30,675,700
Trang 1 410 Earth dam 0.23 [ 0.23 ] Km 120,780,889 2.190 Max. height (m) 4,735.000 Volume (m3) 27,175,700
Trang 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,500,000 0.600 Diameter (m) 5.000 Width (m) 3,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,675,700
Contract ID 031313/05/02 TSO Im Koy Project Type Irrigation 9,500,000
Andoung Phdau 1 420 Canal 0.10 [ 0.10 ] Km 95,000,000 1.000 Depth (m) 2,100.000 Volume (m3) 9,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,500,000

Prey Chhor, Tong Rong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031314/05/01 TSO Im Koy Project Type Rural Transport 31,561,800
Tong Rong 1 202 Laterite road 0.55 [ 0.55 ] Km 11,115,455 2.500 Width (m) 206.250 Earth fill m3 6,113,500
Samraong 2 202 Laterite road 1.11 [ 1.11 ] Km 11,115,530 2.500 Width (m) 542.750 Earth fill m3 12,382,700
Tro Mukh Ti Muoy 3 202 Laterite road 0.50 [ 0.50 ] Km 11,115,600 2.500 Width (m) 225.000 Earth fill m3 5,557,800
Kok Kandal 4 202 Laterite road 0.50 [ 0.50 ] Km 11,115,600 2.500 Width (m) 225.000 Earth fill m3 5,557,800
Tong Rong 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Samraong 6 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Kok Kandal 7 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,561,800

Prey Chhor, Trapeang Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031315/05/01 TSO Im Koy Project Type Irrigation 21,880,000
Kaoh Svay 1 410 Earth dam 0.23 [ 0.23 ] Km 39,466,667 1.810 Max. height (m) 1,948.000 Volume (m3) 8,880,000
Kaoh Svay 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 13,000,000 3.000 Total span (m) 5.000 Width (m) 13,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,880,000
Contract ID 031315/05/02 TSO Im Koy Project Type Irrigation 22,192,400
Kaoh Svay 2 420 Canal 0.40 [ 0.40 ] Km 9,444,000 1.660 Depth (m) 915.000 Volume (m3) 3,777,600
Kaoh Svay 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 7,200,000 1.000 Diameter (m) 4.000 Width (m) 7,200,000
Trapeang Reang 4 420 Canal 0.60 [ 1.19 ] Km 9,448,020 0.970 Depth (m) 2,428.000 Volume (m3) 11,214,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,192,400

Srei Santhor, Baray

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031401/05/01 TSO Tep That Project Type Rural Transport 22,000,000
Banteay 2 201 Earth road 0.26 [ 0.26 ] Km 38,461,538 4.000 Width (m) 1,270.000 Earth fill m3 10,000,000
Sya Boeng Veaeng 3 201 Earth road 0.23 [ 0.23 ] Km 34,782,609 3.500 Width (m) 1,437.000 Earth fill m3 8,000,000
Banteay 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Sya Boeng Veaeng 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.800 Diameter (m) 6.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,000,000
Contract ID 031401/05/02 TSO Tep That Project Type Irrigation 10,500,000
Kamphlak 2 420 Canal 0.30 [ 0.30 ] Km 35,000,000 1.900 Depth (m) 2,255.000 Volume (m3) 10,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,500,000

Srei Santhor, Chi Bal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031402/05/01 TSO Tep That Project Type Rural Transport 27,600,000
Chi Bal 1 201 Earth road 0.68 [ 0.68 ] Km 20,588,235 4.000 Width (m) 111.000 Earth fill m3 14,000,000
Khyaong 2 201 Earth road 0.63 [ 0.63 ] Km 21,760,000 4.000 Width (m) 111.000 Earth fill m3 13,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,600,000

Srei Santhor, Khnar Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031403/05/01 TSO Tep That Project Type Irrigation 25,500,000
Khnar Sa 1 420 Canal 1.35 [ 1.35 ] Km 18,888,889 1.500 Depth (m) 5,942.550 Volume (m3) 25,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,500,000

Srei Santhor, Kaoh Andaet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031404/05/01 TSO Tep That Project Type Rural Transport 35,000,000
Kbal Kaoh 1 201 Earth road 0.59 [ 0.59 ] Km 23,931,624 4.000 Width (m) 111.000 Earth fill m3 14,000,000
Krouch Saeuch 2 201 Earth road 2.44 [ 2.44 ] Km 7,802,875 4.000 Width (m) 111.000 Earth fill m3 19,000,000
Krouch Saeuch 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 7.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,000,000

Srei Santhor, Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031405/05/01 TSO Tep That Project Type Rural Transport 30,226,600
Kaoh Kou 1 201 Earth road 0.43 [ 0.43 ] Km 41,124,760 4.000 Width (m) 111.000 Earth fill m3 17,683,647
Chey 2 201 Earth road 0.31 [ 0.31 ] Km 41,124,761 4.000 Width (m) 111.000 Earth fill m3 12,543,052
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,226,699

Srei Santhor, Pteah Kandal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031406/05/01 TSO Tep That Project Type Irrigation 33,000,000
Ou Leav 1 420 Canal 0.15 [ 0.15 ] Km 132,000,000 1.800 Depth (m) 3,536.880 Volume (m3) 19,800,000
Phteah Kandal Kraom 2 420 Canal 0.05 [ 0.05 ] Km 264,000,000 2.000 Depth (m) 3,931.000 Volume (m3) 13,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,000,000

Srei Santhor, Pram Yam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031407/05/01 TSO Tep That Project Type Irrigation 30,900,000
Kdei Thkar 1 420 Canal 1.60 [ 1.60 ] Km 19,312,500 1.300 Depth (m) 6,425.480 Volume (m3) 30,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,900,000

Srei Santhor, Preaek Dambouk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031408/05/01 TSO Tep That Project Type Irrigation 50,000,000
Ta Meun 1 421 Concrete canal 0.34 [ 0.34 ] Km 53,779,070 0.500 Depth (m) 0.500 18,500,000
Preaek Dambouk Leu 2 421 Concrete canal 0.59 [ 0.59 ] Km 53,299,492 0.500 Depth (m) 0.500 31,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,000,000

Srei Santhor, Preaek Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031409/05/01 TSO Tep That Project Type Rural Transport 21,800,000
Preaek Pou Kraom 2 201 Earth road 0.90 [ 0.90 ] Km 22,346,369 4.000 Width (m) 3,263.000 Earth fill m3 20,000,000
Preaek Pou Kraom 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 6.000 Length (m) 1,000,000
Preaek Pou Kraom 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 6.000 Length (m) 800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,800,000
Contract ID 031409/05/02 TSO Tep That Project Type Irrigation 19,900,000
Roka Tvear 2 420 Canal 1.16 [ 1.16 ] Km 17,155,172 0.800 Depth (m) 4,709.000 Volume (m3) 19,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,900,000

Srei Santhor, Preaek Rumdeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031410/05/01 TSO Tep That Project Type Rural Transport 39,200,000
Tnaot Kha 1 201 Earth road 0.60 [ 0.60 ] Km 33,333,333 5.000 Width (m) 111.000 Earth fill m3 20,000,000
Tnaot Ka 2 201 Earth road 0.60 [ 0.60 ] Km 25,000,000 4.000 Width (m) 111.000 Earth fill m3 15,000,000
Tnaot Kha 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 6.000 Length (m) 3,000,000
Tnaot Ka 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 6.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,200,000

Srei Santhor, Ruessei Srok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031411/05/01 TSO Tep That Project Type Irrigation 16,800,000
Prey Totueng 1 451 Small water gate 1.00 [ 1.00 ] Place 16,800,000 3.600 Length (m) 2.500 Height (m) 16,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,800,000
Contract ID 031411/05/02 TSO Tep That Project Type Irrigation 13,500,000
Tnaot Kraom 1 420 Canal 0.07 [ 0.07 ] Km 192,857,143 1.800 Depth (m) 3,185.000 Volume (m3) 13,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,500,000

Srei Santhor, Svay Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031412/05/01 TSO Tep That Project Type Irrigation 22,148,000
Svay 1 420 Canal 0.65 [ 0.65 ] Km 34,073,846 2.500 Depth (m) 5,096.000 Volume (m3) 22,148,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,148,000
Contract ID 031412/05/02 TSO Tep That Project Type Rural Transport 8,050,000
Pou 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 1.000 Diameter (m) 5.000 Length (m) 2,600,000
Pou 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,850,000 1.000 Diameter (m) 6.000 Length (m) 2,850,000
Khvet 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 1.000 Diameter (m) 5.000 Length (m) 2,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,050,000

Srei Santhor, Svay Sach Phnum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031413/05/01 TSO Tep That Project Type Irrigation 27,900,000
Svay Tboung 1 420 Canal 0.95 [ 0.95 ] Km 29,368,421 2.000 Depth (m) 6,640.000 Volume (m3) 27,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,900,000

Srei Santhor, Tong Tralach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031414/05/01 TSO Tep That Project Type Irrigation 23,000,000
Chonloat Dai 1 410 Earth dam 0.46 [ 0.46 ] Km 32,751,092 0.800 Max. height (m) 2,183.000 Volume (m3) 15,000,000
Chonloat Dai 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 4,000,000 0.800 Diameter (m) 5.000 Width (m) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,000,000

Stueng Trang, areaks Tnaot

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031501/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 31,000,000
Lvea 1 201 Earth road 1.00 [ 1.00 ] Km 17,272,728 4.000 Width (m) 0.300 Earth fill m3 17,272,728
Areaks Tnaot 2 201 Earth road 0.65 [ 0.65 ] Km 17,272,726 4.000 Width (m) 0.300 Earth fill m3 11,227,272
Lvea 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Areaks Tnaot 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.800 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,000,000

Stueng Trang, Dang Kdar

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031503/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 35,609,200
Santich Kaeut 1 201 Earth road 1.64 [ 1.64 ] Km 15,427,617 4.000 Width (m) 555.000 Earth fill m3 25,255,009
Santich Kandal 2 201 Earth road 0.55 [ 0.55 ] Km 15,427,616 4.000 Width (m) 555.000 Earth fill m3 8,485,189
Santich Lech 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 934,500 0.600 Diameter (m) 5.000 Length (m) 1,869,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,609,198

Stueng Trang, Khpob Ta Nguon

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031504/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 26,400,000
Khpob Ta Nguon 1 201 Earth road 1.20 [ 1.20 ] Km 13,200,000 4.000 Width (m) 0.300 Earth fill m3 15,840,000
Anlong Samlei 2 201 Earth road 0.80 [ 0.80 ] Km 13,200,000 4.000 Width (m) 0.300 Earth fill m3 10,560,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,400,000

Stueng Trang, Me Sar Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031505/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 25,177,617
Ou Beng 1 201 Earth road 0.67 [ 0.67 ] Km 8,207,225 4.000 Width (m) 1,198.000 Earth fill m3 5,482,427
Bos Pou 2 201 Earth road 0.96 [ 0.96 ] Km 8,207,225 4.000 Width (m) 1,652.000 Earth fill m3 7,846,108
Kbal Ou 3 201 Earth road 0.27 [ 0.27 ] Km 8,207,225 4.000 Width (m) 493.000 Earth fill m3 2,199,536
Trapeang Chhuk 4 201 Earth road 0.56 [ 0.56 ] Km 8,207,225 4.000 Width (m) 897.000 Earth fill m3 4,596,046
Ou Beng 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,684,500 0.600 Diameter (m) 5.000 Length (m) 1,684,500
Bos Pou 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,684,500 0.600 Diameter (m) 5.000 Length (m) 1,684,500
Trapeang Chhuk 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,684,500 0.600 Diameter (m) 5.000 Length (m) 1,684,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,177,617

Stueng Trang, Ou Mlu

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031506/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 26,585,200
Khtuoy Muoy 1 201 Earth road 1.00 [ 1.00 ] Km 12,750,600 4.000 Width (m) 1,937.000 Earth fill m3 12,750,600
Khtuoy Pir 2 201 Earth road 1.00 [ 1.00 ] Km 12,750,600 4.000 Width (m) 1,937.000 Earth fill m3 12,750,600
Khtuoy Muoy 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 361,333 0.600 Diameter (m) 5.000 Length (m) 722,667
Khtuoy Pir 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 361,333 0.600 Diameter (m) 5.000 Length (m) 361,333
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,585,200

Stueng Trang, Peam Kaoh Sna

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031507/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 32,400,000
Peam Knong 1 201 Earth road 1.00 [ 1.00 ] Km 12,000,000 4.000 Width (m) 1,601.000 Earth fill m3 12,000,000
Dei Leu 2 201 Earth road 1.50 [ 1.50 ] Km 12,000,000 4.000 Width (m) 2,403.000 Earth fill m3 18,000,000
Dei Leu 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,400,000

Stueng Trang, Preah Andoung

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031508/05/01 TSO Ten Chan Thuoen Project Type Irrigation 18,928,000
Preah Andoung Muoy 1 420 Canal 0.30 [ 0.30 ] Km 63,093,333 3.000 Depth (m) 5,408.000 Volume (m3) 18,928,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  18,928,000

Stueng Trang, Preaek Bak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031509/05/01 TSO Ten Chan Thuoen Project Type Irrigation 6,104,000
Preaek Bak 1 410 Earth dam 0.03 [ 0.03 ] Km 218,000,000 5.000 Max. height (m) 1,097.000 Volume (m3) 6,104,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,104,000
Contract ID 031509/05/02 TSO Ten Chan Thuoen Project Type Irrigation 26,086,300
Preaek Bak 1 420 Canal 0.48 [ 0.48 ] Km 54,346,458 2.800 Depth (m) 6,851.000 Volume (m3) 26,086,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,086,300

Stueng Trang, Preaek Kak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031510/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 44,376,800
Meakh Muoy 1 201 Earth road 0.50 [ 0.50 ] Km 17,615,300 4.000 Width (m) 1,457.000 Earth fill m3 8,807,650
Ou Prampir 2 201 Earth road 0.60 [ 0.60 ] Km 17,615,300 4.000 Width (m) 1,748.000 Earth fill m3 10,569,180
Meakh Muoy 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 6,000,000
Ou Prampir 4 212 Double pipe culvert 2.00 [ 2.00 ] Place 3,500,000 0.800 Diameter (m) 5.000 Length (m) 7,000,000
Ou Prampir 5 223 Triple cell box culvert 1.00 [ 1.00 ] Place 12,000,000 4.500 Total Span (m) 4.000 Width(m) 12,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,376,830
Contract ID 031510/05/02 TSO Ten Chan Thuoen Project Type Irrigation 23,492,400
Phnum Montir 1 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 8,036,000 2.500 Total span (m) 4.000 Width (m) 8,036,000
Preaek Barang 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 15,456,400 2.000 Total span (m) 4.000 Width (m) 15,456,400
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,492,400

Stueng Trang, Soupheas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031512/05/01 TSO Ten Chan Thuoen Project Type Irrigation 13,665,275
Soupheas 1 420 Canal 0.59 [ 0.59 ] Km 23,161,483 2.000 Depth (m) 3,020.000 Volume (m3) 13,665,275
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,665,275
Contract ID 031512/05/02 TSO Ten Chan Thuoen Project Type Irrigation 10,620,000
Soupheas 1 410 Earth dam 0.43 [ 0.43 ] Km 24,526,559 1.000 Max. height (m) 3,572.000 Volume (m3) 10,620,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,620,000

Stueng Trang, Tuol Preah Khleang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031513/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 20,428,655
Doun Tor 1 201 Earth road 0.70 [ 0.70 ] Km 9,780,562 4.000 Width (m) 0.340 Earth fill m3 6,846,393
Doun Tor 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,638,400 0.600 Diameter (m) 5.000 Length (m) 1,638,400
Ta Meung 3 201 Earth road 0.57 [ 0.57 ] Km 9,780,562 4.000 Width (m) 0.340 Earth fill m3 5,574,920
Thum 4 201 Earth road 0.43 [ 0.43 ] Km 9,780,562 4.000 Width (m) 0.340 Earth fill m3 4,205,642
Thum 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,163,300 0.800 Diameter (m) 5.000 Length (m) 2,163,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  20,428,655

Stueng Trang, Tuol Sambuor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031514/05/01 TSO Ten Chan Thuoen Project Type Rural Transport 24,984,600
Tuol Sambuor 1 201 Earth road 1.40 [ 1.40 ] Km 12,623,474 4.000 Width (m) 2,242.000 Earth fill m3 17,672,864
Veal Preah 2 201 Earth road 0.50 [ 0.50 ] Km 12,623,472 4.000 Width (m) 801.000 Earth fill m3 6,311,736
Veal Preah 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,984,600

Tboung Khmum, Anhchaeum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031601/05/01 TSO Ven Vorn Project Type Rural Transport 38,106,900
Prey Chongruk 1 201 Earth road 1.00 [ 1.00 ] Km 10,887,714 4.000 Width (m) 1,305.000 Earth fill m3 10,887,714
Doung Preah 2 201 Earth road 1.75 [ 1.75 ] Km 10,887,714 4.000 Width (m) 2,283.000 Earth fill m3 19,053,500
Eisant Mean Chey 3 201 Earth road 0.75 [ 0.75 ] Km 10,887,582 3.500 Width (m) 734.000 Earth fill m3 8,165,687
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,106,900

Tboung Khmum, Chikor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031604/05/01 TSO Chea Theng Project Type Irrigation 31,136,500
Stueng Penh 1 420 Canal 1.00 [ 1.00 ] Km 31,136,500 1.000 Depth (m) 200.000 Volume (m3) 31,136,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,136,500
Contract ID 031604/05/02 TSO Chea Theng Project Type Rural Transport 6,999,900
Chan Tum 1 202 Laterite road 0.83 [ 0.83 ] Km 5,903,494 2.500 Width (m) 150.000 Earth fill m3 4,899,900
Chan Tum 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Chan Tum 3 281 Width restriction posts 1.00 [ 1.00 ] Place 100,000 0.400 1.500 100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,999,900

Tboung Khmum, Chirou Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031605/05/01 TSO Ven Vorn Project Type Rural Transport 31,999,900
Chirou Kandal 2 201 Earth road 0.80 [ 0.80 ] Km 12,484,898 4.000 Width (m) 1,499.000 Earth fill m3 9,987,918
Chirou Leu 3 201 Earth road 1.68 [ 1.68 ] Km 12,484,838 4.000 Width (m) 3,602.000 Earth fill m3 21,011,982
Chirou Kandal 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,999,900

Tboung Khmum, Chirou Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031606/05/01 TSO Ven Vorn Project Type Rural Transport 42,412,800
Andoung Chea 2 201 Earth road 0.70 [ 0.70 ] Km 19,200,000 4.000 Width (m) 2,806.000 Earth fill m3 13,440,000
Andoung Chea 3 201 Earth road 0.95 [ 0.95 ] Km 19,200,000 4.000 Width (m) 2,196.000 Earth fill m3 18,163,200
Ta Trav 4 201 Earth road 0.44 [ 0.44 ] Km 19,200,000 4.000 Width (m) 1,026.000 Earth fill m3 8,409,600
Andoung Chea 5 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,412,800

Tboung Khmum, Chob

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031608/05/01 TSO Chea Theng Project Type Irrigation 31,000,000
Chrak Chambak 1 420 Canal 0.20 [ 0.20 ] Km 26,495,726 1.000 Depth (m) 200.000 Volume (m3) 5,299,145
Chob Krau 2 420 Canal 0.30 [ 0.30 ] Km 26,495,726 1.000 Depth (m) 200.000 Volume (m3) 7,948,718
Chob Ti Muoy 3 420 Canal 0.30 [ 0.30 ] Km 26,495,726 1.000 Depth (m) 200.000 Volume (m3) 7,948,718
Chob Ti Pir 4 420 Canal 0.37 [ 0.37 ] Km 26,495,726 1.000 Depth (m) 200.000 Volume (m3) 9,803,419
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,999,999
Contract ID 031608/05/02 TSO Chea Theng Project Type Irrigation 17,000,000
Tuol Trea Tboung 3 420 Canal 1.00 [ 1.00 ] Km 17,000,000 1.000 Depth (m) 4,290.000 Volume (m3) 17,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,000,000

Tboung Khmum, Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031612/05/01 TSO Ven Vorn Project Type Irrigation 46,600,000
sambuor 2 420 Canal 0.60 [ 0.60 ] Km 20,729,537 1.180 Depth (m) 2,280.000 Volume (m3) 12,520,641
Thnong 3 420 Canal 1.35 [ 1.35 ] Km 20,729,537 1.070 Depth (m) 4,314.000 Volume (m3) 27,901,957
Kbal Ou 4 420 Canal 0.30 [ 0.30 ] Km 20,729,537 1.170 Depth (m) 1,336.000 Volume (m3) 6,177,402
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  46,600,000

Tboung Khmum, Lngieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031613/05/01 TSO Ven Vorn Project Type Rural Transport 32,895,600
Smaonh 1 201 Earth road 0.05 [ 0.05 ] Km 15,850,000 5.000 Width (m) 318.000 Earth fill m3 729,100
Lvea Thum 2 201 Earth road 0.49 [ 0.49 ] Km 15,850,000 4.000 Width (m) 1,141.000 Earth fill m3 7,766,500
Smaonh 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 6.000 Length (m) 3,000,000
Kokir 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 6.000 Length (m) 2,400,000
Kokir 5 212 Double pipe culvert 2.00 [ 2.00 ] Place 3,250,000 0.800 Diameter (m) 6.000 Length (m) 6,500,000
Lngieng 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,700,000 1.000 Diameter (m) 6.000 Length (m) 2,700,000
Kokir 7 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,300,000 1.000 Diameter (m) 6.000 Length (m) 4,300,000
Kokir 8 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,500,000 1.000 Diameter (m) 6.000 Length (m) 5,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,895,600

Tboung Khmum, Moung Riev

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031614/05/01 TSO Chea Theng Project Type Rural Transport 37,546,900
Poun 1 201 Earth road 0.58 [ 0.58 ] Km 5,399,495 4.000 Width (m) 472.000 Earth fill m3 3,115,509
Poun 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,299,125 0.600 Diameter (m) 5.000 Length (m) 2,598,250
Poun 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,820,300 0.800 Diameter (m) 5.000 Length (m) 1,820,300
Poun 4 222 Double cell box culvert 1.00 [ 1.00 ] Place 9,624,000 2.000 Total Span (m) 4.500 Width(m) 9,624,000
Poun 5 213 Triple pipe culvert 1.00 [ 1.00 ] Place 3,000,800 0.600 Diameter (m) 6.000 Length (m) 3,000,800
Cheung Khal 6 201 Earth road 0.20 [ 0.20 ] Km 5,399,495 4.000 Width (m) 482.000 Earth fill m3 1,079,899
Cheung Khal 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,299,125 0.600 Diameter (m) 5.000 Length (m) 1,299,125
Mong Ti Prammuoy 8 201 Earth road 0.39 [ 0.39 ] Km 5,399,495 4.000 Width (m) 602.000 Earth fill m3 2,084,205
Mong Ti Prammuoy 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,820,300 0.800 Diameter (m) 5.000 Length (m) 1,820,300
Chrouy Changhar 10 201 Earth road 0.25 [ 0.25 ] Km 5,399,495 4.000 Width (m) 67.000 Earth fill m3 1,349,874
Chrouy Changhar 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,299,125 0.600 Diameter (m) 5.000 Length (m) 1,299,125
Trapeang Krapeu 12 201 Earth road 1.57 [ 1.57 ] Km 5,399,495 4.000 Width (m) 1,808.000 Earth fill m3 8,455,609
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,546,996

Tboung Khmum, Peam Chileang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031615/05/01 TSO Ven Vorn Project Type Rural Transport 36,000,000
Preaek Phdau 2 202 Laterite road 1.73 [ 1.73 ] Km 13,362,296 3.500 Width (m) 1,177.000 Earth fill m3 23,076,685
Preaek Phdau 3 202 Laterite road 0.92 [ 0.92 ] Km 13,362,299 3.500 Width (m) 2,680.000 Earth fill m3 12,293,315
Preaek Phdau 4 281 Width restriction posts 1.00 [ 1.00 ] Place 630,000 0.400 1.500 630,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,000,000

Tboung Khmum, Roka Po Pram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031616/05/02 TSO Ven Vorn Project Type Rural Transport 68,925,000
Pong Tuek 5 201 Earth road 0.77 [ 0.77 ] Km 9,322,600 4.000 Width (m) 1,392.000 Earth fill m3 7,197,047
Veal Vong 6 201 Earth road 1.40 [ 1.40 ] Km 9,322,600 4.000 Width (m) 2,602.000 Earth fill m3 13,051,640
Praphat 7 201 Earth road 0.76 [ 0.76 ] Km 9,322,600 4.000 Width (m) 1,293.000 Earth fill m3 7,085,176
Ta Pav Bampenh Tes 8 201 Earth road 0.86 [ 0.86 ] Km 9,322,600 4.000 Width (m) 1,377.000 Earth fill m3 8,017,436
Ta Pav Bampenh Tes 9 201 Earth road 0.45 [ 0.45 ] Km 9,322,600 4.000 Width (m) 721.000 Earth fill m3 4,195,170
Trapeang Ruessei 10 201 Earth road 1.45 [ 1.45 ] Km 9,322,601 4.000 Width (m) 3,153.000 Earth fill m3 13,517,771
Ta Pav Bampenh Tes 11 201 Earth road 0.30 [ 0.30 ] Km 9,322,600 4.000 Width (m) 519.000 Earth fill m3 2,796,780
Trapeang Khla 12 201 Earth road 0.56 [ 0.56 ] Km 9,322,600 4.000 Width (m) 999.000 Earth fill m3 5,174,043
Trapeang Khla 13 201 Earth road 0.31 [ 0.31 ] Km 9,322,381 4.000 Width (m) 428.000 Earth fill m3 2,889,938
Trapeang Ruessei 14 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,666,667 0.600 Diameter (m) 5.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  68,925,001

Tboung Khmum, Sralab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031618/05/01 TSO Ven Vorn Project Type Irrigation 44,899,900
Chan Toung 1 420 Canal 0.77 [ 0.77 ] Km 17,831,510 0.900 Depth (m) 1,527.000 Volume (m3) 13,694,600
Chan Toung 2 420 Canal 1.27 [ 1.27 ] Km 17,831,612 1.180 Depth (m) 5,676.000 Volume (m3) 22,717,474
Angkor Chea 3 420 Canal 0.48 [ 0.48 ] Km 17,831,609 1.180 Depth (m) 2,121.000 Volume (m3) 8,487,846
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,899,920

Tboung Khmum, Suong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031619/05/01 TSO Ven Vorn Project Type Irrigation 58,716,000
Ponnareay 1 420 Canal 0.93 [ 0.93 ] Km 63,000,000 1.000 Depth (m) 7,821.000 Volume (m3) 58,716,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  58,716,000

Tboung Khmum, Thma Pechr

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031621/05/01 TSO Ven Vorn Project Type Rural Transport 48,192,600
Thma Pech Ti Muoy 2 201 Earth road 0.62 [ 0.62 ] Km 12,635,761 4.000 Width (m) 2,202.000 Earth fill m3 7,808,900
Doung 3 201 Earth road 0.78 [ 0.78 ] Km 12,635,696 4.000 Width (m) 1,329.000 Earth fill m3 9,805,300
Chies Ti Muoy 4 201 Earth road 1.00 [ 1.00 ] Km 12,635,700 4.000 Width (m) 1,660.000 Earth fill m3 12,635,700
Chies Ti Pir 5 201 Earth road 1.42 [ 1.42 ] Km 12,635,704 4.000 Width (m) 2,321.000 Earth fill m3 17,942,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,192,600

Tboung Khmum, Tonle Bet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031622/05/01 TSO Ven Vorn Project Type Irrigation 44,999,000
Preaek Chik 1 420 Canal 0.30 [ 0.30 ] Km 20,929,767 1.000 Depth (m) 1,329.000 Volume (m3) 6,278,930
Tuol Khsach 2 420 Canal 0.82 [ 0.82 ] Km 20,929,767 0.720 Depth (m) 2,175.000 Volume (m3) 17,099,620
Tuol Kor 3 420 Canal 1.03 [ 1.03 ] Km 20,929,768 1.000 Depth (m) 4,604.000 Volume (m3) 21,620,450
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,999,000

Tboung Khmum, Vihear Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031623/05/01 TSO Ven Vorn Project Type Irrigation 36,952,000
Kandal 1 420 Canal 0.30 [ 0.30 ] Km 24,800,000 1.450 Depth (m) 1,815.000 Volume (m3) 7,440,000
Chi Kae 2 420 Canal 0.99 [ 0.99 ] Km 24,800,000 1.250 Depth (m) 4,606.000 Volume (m3) 24,552,000
Pnov 3 420 Canal 0.20 [ 0.20 ] Km 24,800,000 1.410 Depth (m) 989.000 Volume (m3) 4,960,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,952,000