Location: Kampong Cham \ Tboung Khmum Budget Year: 2005

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Tboung Khmum, Anhchaeum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031601/05/01 TSO Ven Vorn Project Type Rural Transport 38,106,900
Prey Chongruk 1 201 Earth road 1.00 [ 1.00 ] Km 10,887,714 4.000 Width (m) 1,305.000 Earth fill m3 10,887,714
Doung Preah 2 201 Earth road 1.75 [ 1.75 ] Km 10,887,714 4.000 Width (m) 2,283.000 Earth fill m3 19,053,500
Eisant Mean Chey 3 201 Earth road 0.75 [ 0.75 ] Km 10,887,582 3.500 Width (m) 734.000 Earth fill m3 8,165,687
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,106,900

Tboung Khmum, Chikor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031604/05/01 TSO Chea Theng Project Type Irrigation 31,136,500
Stueng Penh 1 420 Canal 1.00 [ 1.00 ] Km 31,136,500 1.000 Depth (m) 200.000 Volume (m3) 31,136,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,136,500
Contract ID 031604/05/02 TSO Chea Theng Project Type Rural Transport 6,999,900
Chan Tum 1 202 Laterite road 0.83 [ 0.83 ] Km 5,903,494 2.500 Width (m) 150.000 Earth fill m3 4,899,900
Chan Tum 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Chan Tum 3 281 Width restriction posts 1.00 [ 1.00 ] Place 100,000 0.400 1.500 100,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  6,999,900

Tboung Khmum, Chirou Muoy

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031605/05/01 TSO Ven Vorn Project Type Rural Transport 31,999,900
Chirou Kandal 2 201 Earth road 0.80 [ 0.80 ] Km 12,484,898 4.000 Width (m) 1,499.000 Earth fill m3 9,987,918
Chirou Leu 3 201 Earth road 1.68 [ 1.68 ] Km 12,484,838 4.000 Width (m) 3,602.000 Earth fill m3 21,011,982
Chirou Kandal 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,999,900

Tboung Khmum, Chirou Pir

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031606/05/01 TSO Ven Vorn Project Type Rural Transport 42,412,800
Andoung Chea 2 201 Earth road 0.70 [ 0.70 ] Km 19,200,000 4.000 Width (m) 2,806.000 Earth fill m3 13,440,000
Andoung Chea 3 201 Earth road 0.95 [ 0.95 ] Km 19,200,000 4.000 Width (m) 2,196.000 Earth fill m3 18,163,200
Ta Trav 4 201 Earth road 0.44 [ 0.44 ] Km 19,200,000 4.000 Width (m) 1,026.000 Earth fill m3 8,409,600
Andoung Chea 5 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  42,412,800

Tboung Khmum, Chob

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031608/05/01 TSO Chea Theng Project Type Irrigation 31,000,000
Chrak Chambak 1 420 Canal 0.20 [ 0.20 ] Km 26,495,726 1.000 Depth (m) 200.000 Volume (m3) 5,299,145
Chob Krau 2 420 Canal 0.30 [ 0.30 ] Km 26,495,726 1.000 Depth (m) 200.000 Volume (m3) 7,948,718
Chob Ti Muoy 3 420 Canal 0.30 [ 0.30 ] Km 26,495,726 1.000 Depth (m) 200.000 Volume (m3) 7,948,718
Chob Ti Pir 4 420 Canal 0.37 [ 0.37 ] Km 26,495,726 1.000 Depth (m) 200.000 Volume (m3) 9,803,419
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,999,999
Contract ID 031608/05/02 TSO Chea Theng Project Type Irrigation 17,000,000
Tuol Trea Tboung 3 420 Canal 1.00 [ 1.00 ] Km 17,000,000 1.000 Depth (m) 4,290.000 Volume (m3) 17,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  17,000,000

Tboung Khmum, Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031612/05/01 TSO Ven Vorn Project Type Irrigation 46,600,000
sambuor 2 420 Canal 0.60 [ 0.60 ] Km 20,729,537 1.180 Depth (m) 2,280.000 Volume (m3) 12,520,641
Thnong 3 420 Canal 1.35 [ 1.35 ] Km 20,729,537 1.070 Depth (m) 4,314.000 Volume (m3) 27,901,957
Kbal Ou 4 420 Canal 0.30 [ 0.30 ] Km 20,729,537 1.170 Depth (m) 1,336.000 Volume (m3) 6,177,402
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  46,600,000

Tboung Khmum, Lngieng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031613/05/01 TSO Ven Vorn Project Type Rural Transport 32,895,600
Smaonh 1 201 Earth road 0.05 [ 0.05 ] Km 15,850,000 5.000 Width (m) 318.000 Earth fill m3 729,100
Lvea Thum 2 201 Earth road 0.49 [ 0.49 ] Km 15,850,000 4.000 Width (m) 1,141.000 Earth fill m3 7,766,500
Smaonh 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 6.000 Length (m) 3,000,000
Kokir 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,400,000 0.600 Diameter (m) 6.000 Length (m) 2,400,000
Kokir 5 212 Double pipe culvert 2.00 [ 2.00 ] Place 3,250,000 0.800 Diameter (m) 6.000 Length (m) 6,500,000
Lngieng 6 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,700,000 1.000 Diameter (m) 6.000 Length (m) 2,700,000
Kokir 7 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,300,000 1.000 Diameter (m) 6.000 Length (m) 4,300,000
Kokir 8 213 Triple pipe culvert 1.00 [ 1.00 ] Place 5,500,000 1.000 Diameter (m) 6.000 Length (m) 5,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,895,600

Tboung Khmum, Moung Riev

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031614/05/01 TSO Chea Theng Project Type Rural Transport 37,546,900
Poun 1 201 Earth road 0.58 [ 0.58 ] Km 5,399,495 4.000 Width (m) 472.000 Earth fill m3 3,115,509
Poun 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,299,125 0.600 Diameter (m) 5.000 Length (m) 2,598,250
Poun 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,820,300 0.800 Diameter (m) 5.000 Length (m) 1,820,300
Poun 4 222 Double cell box culvert 1.00 [ 1.00 ] Place 9,624,000 2.000 Total Span (m) 4.500 Width(m) 9,624,000
Poun 5 213 Triple pipe culvert 1.00 [ 1.00 ] Place 3,000,800 0.600 Diameter (m) 6.000 Length (m) 3,000,800
Cheung Khal 6 201 Earth road 0.20 [ 0.20 ] Km 5,399,495 4.000 Width (m) 482.000 Earth fill m3 1,079,899
Cheung Khal 7 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,299,125 0.600 Diameter (m) 5.000 Length (m) 1,299,125
Mong Ti Prammuoy 8 201 Earth road 0.39 [ 0.39 ] Km 5,399,495 4.000 Width (m) 602.000 Earth fill m3 2,084,205
Mong Ti Prammuoy 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,820,300 0.800 Diameter (m) 5.000 Length (m) 1,820,300
Chrouy Changhar 10 201 Earth road 0.25 [ 0.25 ] Km 5,399,495 4.000 Width (m) 67.000 Earth fill m3 1,349,874
Chrouy Changhar 11 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,299,125 0.600 Diameter (m) 5.000 Length (m) 1,299,125
Trapeang Krapeu 12 201 Earth road 1.57 [ 1.57 ] Km 5,399,495 4.000 Width (m) 1,808.000 Earth fill m3 8,455,609
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,546,996

Tboung Khmum, Peam Chileang

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031615/05/01 TSO Ven Vorn Project Type Rural Transport 36,000,000
Preaek Phdau 2 202 Laterite road 1.73 [ 1.73 ] Km 13,362,296 3.500 Width (m) 1,177.000 Earth fill m3 23,076,685
Preaek Phdau 3 202 Laterite road 0.92 [ 0.92 ] Km 13,362,299 3.500 Width (m) 2,680.000 Earth fill m3 12,293,315
Preaek Phdau 4 281 Width restriction posts 1.00 [ 1.00 ] Place 630,000 0.400 1.500 630,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,000,000

Tboung Khmum, Roka Po Pram

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031616/05/02 TSO Ven Vorn Project Type Rural Transport 68,925,000
Pong Tuek 5 201 Earth road 0.77 [ 0.77 ] Km 9,322,600 4.000 Width (m) 1,392.000 Earth fill m3 7,197,047
Veal Vong 6 201 Earth road 1.40 [ 1.40 ] Km 9,322,600 4.000 Width (m) 2,602.000 Earth fill m3 13,051,640
Praphat 7 201 Earth road 0.76 [ 0.76 ] Km 9,322,600 4.000 Width (m) 1,293.000 Earth fill m3 7,085,176
Ta Pav Bampenh Tes 8 201 Earth road 0.86 [ 0.86 ] Km 9,322,600 4.000 Width (m) 1,377.000 Earth fill m3 8,017,436
Ta Pav Bampenh Tes 9 201 Earth road 0.45 [ 0.45 ] Km 9,322,600 4.000 Width (m) 721.000 Earth fill m3 4,195,170
Trapeang Ruessei 10 201 Earth road 1.45 [ 1.45 ] Km 9,322,601 4.000 Width (m) 3,153.000 Earth fill m3 13,517,771
Ta Pav Bampenh Tes 11 201 Earth road 0.30 [ 0.30 ] Km 9,322,600 4.000 Width (m) 519.000 Earth fill m3 2,796,780
Trapeang Khla 12 201 Earth road 0.56 [ 0.56 ] Km 9,322,600 4.000 Width (m) 999.000 Earth fill m3 5,174,043
Trapeang Khla 13 201 Earth road 0.31 [ 0.31 ] Km 9,322,381 4.000 Width (m) 428.000 Earth fill m3 2,889,938
Trapeang Ruessei 14 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,666,667 0.600 Diameter (m) 5.000 Length (m) 5,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  68,925,001

Tboung Khmum, Sralab

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031618/05/01 TSO Ven Vorn Project Type Irrigation 44,899,900
Chan Toung 1 420 Canal 0.77 [ 0.77 ] Km 17,831,510 0.900 Depth (m) 1,527.000 Volume (m3) 13,694,600
Chan Toung 2 420 Canal 1.27 [ 1.27 ] Km 17,831,612 1.180 Depth (m) 5,676.000 Volume (m3) 22,717,474
Angkor Chea 3 420 Canal 0.48 [ 0.48 ] Km 17,831,609 1.180 Depth (m) 2,121.000 Volume (m3) 8,487,846
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,899,920

Tboung Khmum, Suong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031619/05/01 TSO Ven Vorn Project Type Irrigation 58,716,000
Ponnareay 1 420 Canal 0.93 [ 0.93 ] Km 63,000,000 1.000 Depth (m) 7,821.000 Volume (m3) 58,716,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  58,716,000

Tboung Khmum, Thma Pechr

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031621/05/01 TSO Ven Vorn Project Type Rural Transport 48,192,600
Thma Pech Ti Muoy 2 201 Earth road 0.62 [ 0.62 ] Km 12,635,761 4.000 Width (m) 2,202.000 Earth fill m3 7,808,900
Doung 3 201 Earth road 0.78 [ 0.78 ] Km 12,635,696 4.000 Width (m) 1,329.000 Earth fill m3 9,805,300
Chies Ti Muoy 4 201 Earth road 1.00 [ 1.00 ] Km 12,635,700 4.000 Width (m) 1,660.000 Earth fill m3 12,635,700
Chies Ti Pir 5 201 Earth road 1.42 [ 1.42 ] Km 12,635,704 4.000 Width (m) 2,321.000 Earth fill m3 17,942,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,192,600

Tboung Khmum, Tonle Bet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031622/05/01 TSO Ven Vorn Project Type Irrigation 44,999,000
Preaek Chik 1 420 Canal 0.30 [ 0.30 ] Km 20,929,767 1.000 Depth (m) 1,329.000 Volume (m3) 6,278,930
Tuol Khsach 2 420 Canal 0.82 [ 0.82 ] Km 20,929,767 0.720 Depth (m) 2,175.000 Volume (m3) 17,099,620
Tuol Kor 3 420 Canal 1.03 [ 1.03 ] Km 20,929,768 1.000 Depth (m) 4,604.000 Volume (m3) 21,620,450
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  44,999,000

Tboung Khmum, Vihear Luong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031623/05/01 TSO Ven Vorn Project Type Irrigation 36,952,000
Kandal 1 420 Canal 0.30 [ 0.30 ] Km 24,800,000 1.450 Depth (m) 1,815.000 Volume (m3) 7,440,000
Chi Kae 2 420 Canal 0.99 [ 0.99 ] Km 24,800,000 1.250 Depth (m) 4,606.000 Volume (m3) 24,552,000
Pnov 3 420 Canal 0.20 [ 0.20 ] Km 24,800,000 1.410 Depth (m) 989.000 Volume (m3) 4,960,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  36,952,000