Contract Outputs

Location: Kampong Cham \ Kampong Cham Budget Year: 2005

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Kampong Cham, Boeng Kok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030501/05/01 TSO Va Kimheng Project Type Urban transport 38,663,200
La Edth 2 201 Earth road 0.42 [ 0.42 ] Km 34,640,802 4.000 Width (m) 1,782.000 Earth fill m3 14,687,700
Boeng Kok Pir 3 201 Earth road 0.54 [ 0.54 ] Km 34,641,144 4.000 Width (m) 2,277.000 Earth fill m3 18,775,500
Boeng Kok Pir 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 4,150,000 1.000 Diameter (m) 7.000 Length (m) 4,150,000
La Edth 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,050,000 0.600 Diameter (m) 5.000 Length (m) 1,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  38,663,200

Kampong Cham, Kampong Cham

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030502/05/01 TSO Va Kimheng Project Type Urban Drainage and Flood Protection 33,000,000
Phum Prambuon 1 542 Foul water sewer 1.00 [ 1.00 ] Line 4,645,200 0.400 0.700 4,645,200
Phum Dabmuoy 2 542 Foul water sewer 1.00 [ 1.00 ] Line 5,237,300 0.400 0.700 5,237,300
Phum Prambuon 3 542 Foul water sewer 1.00 [ 1.00 ] Line 4,401,700 0.600 100.000 4,401,700
Phum Dabmuoy 4 542 Foul water sewer 1.00 [ 1.00 ] Line 5,377,000 0.600 80.000 5,377,000
Phum Prambuon 5 542 Foul water sewer 1.00 [ 1.00 ] Line 4,867,800 1.500 219.000 4,867,800
Phum Dabmuoy 6 542 Foul water sewer 1.00 [ 1.00 ] Line 8,471,000 1.500 120.000 8,471,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,000,000
Contract ID 030502/05/02 TSO Va Kimheng Project Type Urban transport 7,931,600
Phum Dabpram 2 201 Earth road 0.08 [ 0.08 ] Km 79,542,857 8.500 Width (m) 833.000 Earth fill m3 6,681,600
Phum Dabpram 3 541 Drain pipe for flood water 1.00 [ 1.00 ] Line 1,250,000 0.600 Length (m) 11.000 Diameter (m) 1,250,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  7,931,600

Kampong Cham, Sambuor Meas

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030503/05/01 TSO Va Kimheng Project Type Urban transport 43,281,800
Boeng Snay 2 201 Earth road 0.55 [ 0.55 ] Km 27,201,091 6.500 Width (m) 1,894.000 Earth fill m3 14,960,600
Boeng Basak 3 201 Earth road 0.98 [ 0.98 ] Km 27,201,231 6.500 Width (m) 3,374.000 Earth fill m3 26,521,200
Boeng Basak 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 0.800 Diameter (m) 7.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  43,281,800

Kampong Cham, Veal Vong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030504/05/01 TSO Va Kimheng Project Type Urban transport 48,833,600
Phum Pram 2 201 Earth road 0.14 [ 0.14 ] Km 63,142,754 8.500 Width (m) 1,106.000 Earth fill m3 8,713,700
Phum Muoy 3 201 Earth road 0.61 [ 0.61 ] Km 63,143,160 8.500 Width (m) 4,925.000 Earth fill m3 38,769,900
Phum Muoy 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,350,000 0.600 Diameter (m) 9.000 Length (m) 1,350,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  48,833,600