Contract Outputs

Location: Kampong Cham \ Prey Chhor Budget Year: 2005

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Prey Chhor, Baray

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031301/05/01 TSO Im Koy Project Type Rural Transport 37,000,000
Roul Chruk 1 201 Earth road 1.70 [ 1.70 ] Km 12,516,400 4.000 Width (m) 3,217.000 Earth fill m3 21,277,880
Samnak Cheung 2 201 Earth road 0.52 [ 0.52 ] Km 12,516,400 3.000 Width (m) 1,195.000 Earth fill m3 6,496,012
Prey Khchay 3 201 Earth road 0.53 [ 0.53 ] Km 12,516,400 3.000 Width (m) 1,316.000 Earth fill m3 6,646,208
Roul Chruk 4 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 1,289,950 0.600 Diameter (m) 5.000 Length (m) 1,289,950
Samnak Cheung 5 201 Earth road 1.00 [ 1.00 ] Km 1,289,950 0.600 Width (m) 5.000 Earth fill m3 1,289,950
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,000,000

Prey Chhor, Boeng Nay

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031302/05/01 TSO Im Koy Project Type Rural Transport 23,300,000
Komar Reach 1 202 Laterite road 2.64 [ 2.64 ] Km 7,448,201 2.500 Width (m) 396.000 Earth fill m3 19,670,700
Boeng Nay 2 202 Laterite road 0.40 [ 0.40 ] Km 7,448,250 2.500 Width (m) 60.000 Earth fill m3 2,979,300
Komar Reach 3 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,300,000
Contract ID 031302/05/02 TSO Im Koy Project Type Rural Transport 21,000,000
Voat Chas 2 202 Laterite road 0.95 [ 0.95 ] Km 7,017,263 2.500 Width (m) 356.250 Earth fill m3 6,666,400
Thma Koul 3 202 Laterite road 1.20 [ 1.20 ] Km 7,017,250 2.500 Width (m) 450.000 Earth fill m3 8,420,700
Trapeang Thum 4 202 Laterite road 0.75 [ 0.75 ] Km 7,017,200 2.500 Width (m) 498.750 Earth fill m3 5,262,900
Voat Chas 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,000,000

Prey Chhor, Chrey Vien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031303/05/01 TSO Im Koy Project Type Irrigation 28,396,800
Trapeang Ampil 1 420 Canal 0.55 [ 0.55 ] Km 12,240,000 1.320 Depth (m) 2,222.120 Volume (m3) 6,732,000
Tuek Nuem 2 420 Canal 0.60 [ 0.60 ] Km 12,240,000 2.320 Depth (m) 1,856.750 Volume (m3) 7,344,000
Trapeang Sangkae 3 420 Canal 1.17 [ 1.17 ] Km 12,240,000 2.780 Depth (m) 4,674.990 Volume (m3) 14,320,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  28,396,800
Contract ID 031303/05/02 TSO Im Koy Project Type Rural Transport 15,500,000
Ou Kambot 1 201 Earth road 1.35 [ 1.35 ] Km 9,850,000 3.500 Width (m) 2,461.000 Earth fill m3 13,297,500
Ou Kambot 2 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,101,250 0.600 Diameter (m) 5.000 Length (m) 2,202,500
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  15,500,000

Prey Chhor, Khvet Thum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031304/05/01 TSO Im Koy Project Type Rural Transport 29,785,000
Pratheat 2 202 Laterite road 0.54 [ 0.54 ] Km 9,778,118 2.500 Width (m) 202.000 Earth fill m3 5,260,627
Dangkao 3 202 Laterite road 0.65 [ 0.65 ] Km 9,778,118 2.500 Width (m) 241.000 Earth fill m3 6,306,886
Dangkao 5 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,925,000 1.000 Diameter (m) 6.000 Length (m) 2,925,000
Ampil Thum 6 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Khvet Thum 7 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Khvet Thum 8 202 Laterite road 0.80 [ 0.80 ] Km 9,778,125 3.000 Width (m) 360.000 Earth fill m3 7,822,500
Ampil Thum 8 202 Laterite road 0.63 [ 0.63 ] Km 9,778,118 2.500 Width (m) 237.000 Earth fill m3 6,169,992
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,785,006

Prey Chhor, Kor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031305/05/01 TSO Im Koy Project Type Rural Transport 41,650,000
Rumduol 1 201 Earth road 0.96 [ 0.96 ] Km 12,846,250 3.000 Width (m) 1,554.000 Earth fill m3 12,332,400
Trapeang Poun 2 201 Earth road 0.88 [ 0.88 ] Km 12,846,311 3.000 Width (m) 1,677.000 Earth fill m3 11,317,600
Svay Pen 3 201 Earth road 0.23 [ 0.23 ] Km 12,846,256 3.000 Width (m) 626.000 Earth fill m3 2,916,100
Ta Meas 4 201 Earth road 0.40 [ 0.40 ] Km 12,846,135 3.000 Width (m) 899.000 Earth fill m3 5,151,300
Ta Kaev 5 201 Earth road 0.22 [ 0.22 ] Km 12,846,429 3.000 Width (m) 606.000 Earth fill m3 2,877,600
Trapeang Poun 6 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,495,000 0.600 Diameter (m) 6.000 Length (m) 2,990,000
Ta Meas 7 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 1,325,000 0.600 Diameter (m) 4.000 Length (m) 1,325,000
Ta Kaev 8 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,740,000 1.000 Diameter (m) 6.000 Length (m) 2,740,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,650,000

Prey Chhor, Krouch

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031306/05/01 TSO Im Koy Project Type Rural Transport 13,500,000
Tuol Khpos 1 202 Laterite road 0.71 [ 0.71 ] Km 9,311,641 2.500 Width (m) 146.000 Earth fill m3 6,639,200
Krouch 3 202 Laterite road 0.67 [ 0.67 ] Km 9,311,544 2.500 Width (m) 136.000 Earth fill m3 6,210,800
Tuol Khpos 3 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,500,000
Contract ID 031306/05/02 TSO Im Koy Project Type Irrigation 14,012,800
Thmei 1 420 Canal 0.38 [ 0.38 ] Km 26,700,800 1.560 Depth (m) 1,660.000 Volume (m3) 10,012,800
Thmei 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Width (m) 2,000,000
Thmei 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Width (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  14,012,800

Prey Chhor, Lvea

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031307/05/01 TSO Im Koy Project Type Rural Transport 34,516,800
Me Meang 1 202 Laterite road 2.45 [ 2.45 ] Km 8,264,000 2.500 Width (m) 919.000 Earth fill m3 20,246,800
Trapeang Chi Neang 2 202 Laterite road 0.28 [ 0.28 ] Km 8,263,929 2.500 Width (m) 105.000 Earth fill m3 2,313,900
Lvea 3 202 Laterite road 0.60 [ 0.97 ] Km 8,264,021 2.500 Width (m) 225.000 Earth fill m3 8,016,100
Trapeang Chi Neang 4 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 2,640,000 1.000 Diameter (m) 5.000 Length (m) 2,640,000
Me Meang 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Lvea 6 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  34,516,800

Prey Chhor, Mien

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031308/05/01 TSO Im Koy Project Type Rural Transport 41,499,000
Ou Ta Nov 1 201 Earth road 2.00 [ 2.00 ] Km 9,135,995 3.000 Width (m) 2,010.000 Earth fill m3 18,271,990
Nam Ken 2 201 Earth road 1.27 [ 1.27 ] Km 9,135,995 3.000 Width (m) 1,532.000 Earth fill m3 11,602,714
Ou Sangkae 3 201 Earth road 0.56 [ 0.56 ] Km 9,135,995 3.000 Width (m) 1,549.000 Earth fill m3 5,125,293
Ou Ta Nov 4 210 Pipe culvert (general) 3.00 [ 3.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 3,900,000
Nam Ken 5 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,300,000 0.600 Diameter (m) 5.000 Length (m) 2,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,499,997

Prey Chhor, Prey Chhor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031309/05/01 TSO Im Koy Project Type Rural Transport 26,314,200
Prey Chhor 1 202 Laterite road 1.76 [ 1.76 ] Km 10,291,667 3.000 Width (m) 926.000 Earth fill m3 18,154,500
Sek Yum 2 202 Laterite road 0.28 [ 0.28 ] Km 10,291,519 2.500 Width (m) 106.000 Earth fill m3 2,912,500
Prey Chhor 3 202 Laterite road 0.38 [ 0.38 ] Km 10,279,167 2.500 Width (m) 144.000 Earth fill m3 3,947,200
Prey Chhor 4 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Sek Yum 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,314,200

Prey Chhor, Sour Saen

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031310/05/01 TSO Im Koy Project Type Rural Transport 30,099,200
Sour Saen 1 202 Laterite road 0.66 [ 0.66 ] Km 8,758,000 3.000 Width (m) 298.000 Earth fill m3 5,797,796
Chambak Thma 2 202 Laterite road 1.04 [ 1.04 ] Km 8,758,000 3.000 Width (m) 468.000 Earth fill m3 9,099,562
Trapeang Reang 3 202 Laterite road 0.70 [ 0.70 ] Km 8,758,000 3.000 Width (m) 314.000 Earth fill m3 6,121,842
Sour Saen 4 210 Pipe culvert (general) 1.00 [ 1.00 ] Place 1,400,000 0.600 Diameter (m) 5.000 Length (m) 1,400,000
Chambak Thma 5 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,920,000 0.800 Diameter (m) 5.000 Length (m) 3,840,000
Trapeang Reang 6 210 Pipe culvert (general) 2.00 [ 2.00 ] Place 1,920,000 0.800 Diameter (m) 5.000 Length (m) 3,840,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,099,200

Prey Chhor, Samraong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031311/05/01 TSO Im Koy Project Type Irrigation 32,300,000
Smer 1 420 Canal 0.36 [ 0.36 ] Km 14,731,181 1.920 Depth (m) 2,924.000 Volume (m3) 5,303,225
Smer 2 420 Canal 0.50 [ 0.50 ] Km 14,731,182 0.630 Depth (m) 313.000 Volume (m3) 7,365,591
Kandaol Kaong 3 420 Canal 0.60 [ 0.60 ] Km 14,731,182 0.370 Depth (m) 376.000 Volume (m3) 8,838,709
Svay Prey 4 420 Canal 0.40 [ 0.40 ] Km 14,731,180 0.190 Depth (m) 251.000 Volume (m3) 5,892,472
Smer 5 421 Concrete canal 0.01 [ 0.01 ] Km 612,500,000 0.700 Depth (m) 2.000 4,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,299,997

Prey Chhor, Srangae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031312/05/01 TSO Im Koy Project Type Irrigation 31,284,400
Trapeang Rung 1 420 Canal 0.60 [ 0.60 ] Km 17,584,485 1.810 Depth (m) 1,709.000 Volume (m3) 10,550,691
Senson Cheung 2 420 Canal 0.70 [ 1.18 ] Km 17,584,344 1.810 Depth (m) 5,114.250 Volume (m3) 20,733,700
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,284,391

Prey Chhor, Thma Pun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031313/05/01 TSO Im Koy Project Type Irrigation 30,675,700
Trang 1 410 Earth dam 0.23 [ 0.23 ] Km 120,780,889 2.190 Max. height (m) 4,735.000 Volume (m3) 27,175,700
Trang 2 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 3,500,000 0.600 Diameter (m) 5.000 Width (m) 3,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,675,700
Contract ID 031313/05/02 TSO Im Koy Project Type Irrigation 9,500,000
Andoung Phdau 1 420 Canal 0.10 [ 0.10 ] Km 95,000,000 1.000 Depth (m) 2,100.000 Volume (m3) 9,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,500,000

Prey Chhor, Tong Rong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031314/05/01 TSO Im Koy Project Type Rural Transport 31,561,800
Tong Rong 1 202 Laterite road 0.55 [ 0.55 ] Km 11,115,455 2.500 Width (m) 206.250 Earth fill m3 6,113,500
Samraong 2 202 Laterite road 1.11 [ 1.11 ] Km 11,115,530 2.500 Width (m) 542.750 Earth fill m3 12,382,700
Tro Mukh Ti Muoy 3 202 Laterite road 0.50 [ 0.50 ] Km 11,115,600 2.500 Width (m) 225.000 Earth fill m3 5,557,800
Kok Kandal 4 202 Laterite road 0.50 [ 0.50 ] Km 11,115,600 2.500 Width (m) 225.000 Earth fill m3 5,557,800
Tong Rong 5 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Samraong 6 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Kok Kandal 7 281 Width restriction posts 1.00 [ 1.00 ] Place 650,000 0.400 1.500 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  31,561,800

Prey Chhor, Trapeang Preah

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031315/05/01 TSO Im Koy Project Type Irrigation 21,880,000
Kaoh Svay 1 410 Earth dam 0.23 [ 0.23 ] Km 39,466,667 1.810 Max. height (m) 1,948.000 Volume (m3) 8,880,000
Kaoh Svay 2 455 Single cell box culvert with gate 1.00 [ 1.00 ] Place 13,000,000 3.000 Total span (m) 5.000 Width (m) 13,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,880,000
Contract ID 031315/05/02 TSO Im Koy Project Type Irrigation 22,192,400
Kaoh Svay 2 420 Canal 0.40 [ 0.40 ] Km 9,444,000 1.660 Depth (m) 915.000 Volume (m3) 3,777,600
Kaoh Svay 3 452 Single pipe Culvert with gate 1.00 [ 1.00 ] Place 7,200,000 1.000 Diameter (m) 4.000 Width (m) 7,200,000
Trapeang Reang 4 420 Canal 0.60 [ 1.19 ] Km 9,448,020 0.970 Depth (m) 2,428.000 Volume (m3) 11,214,800
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,192,400