Contract Outputs
Location: Kampong Cham \ Prey Chhor Budget Year: 2005
Batheay
Chamkar Leu
Cheung Prey
Dambae
Kampong Cham
Kampong Siem
Kang Meas
Kaoh Soutin
Krouch Chhmar
Memot
Ou Reang Ov
Ponhea Kraek
Prey Chhor
Srei Santhor
Stueng Trang
Tboung Khmum
Prey Chhor, Baray
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031301/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
37,000,000 |
| Roul Chruk |
1 |
201 |
Earth road |
1.70 [ 1.70 ] |
Km |
12,516,400 |
4.000 Width (m) |
3,217.000 Earth fill m3 |
21,277,880 |
| Samnak Cheung |
2 |
201 |
Earth road |
0.52 [ 0.52 ] |
Km |
12,516,400 |
3.000 Width (m) |
1,195.000 Earth fill m3 |
6,496,012 |
| Prey Khchay |
3 |
201 |
Earth road |
0.53 [ 0.53 ] |
Km |
12,516,400 |
3.000 Width (m) |
1,316.000 Earth fill m3 |
6,646,208 |
| Roul Chruk |
4 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
1,289,950 |
0.600 Diameter (m) |
5.000 Length (m) |
1,289,950 |
| Samnak Cheung |
5 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
1,289,950 |
0.600 Width (m) |
5.000 Earth fill m3 |
1,289,950 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
37,000,000 |
Prey Chhor, Boeng Nay
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031302/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
23,300,000 |
| Komar Reach |
1 |
202 |
Laterite road |
2.64 [ 2.64 ] |
Km |
7,448,201 |
2.500 Width (m) |
396.000 Earth fill m3 |
19,670,700 |
| Boeng Nay |
2 |
202 |
Laterite road |
0.40 [ 0.40 ] |
Km |
7,448,250 |
2.500 Width (m) |
60.000 Earth fill m3 |
2,979,300 |
| Komar Reach |
3 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
23,300,000 |
| Contract ID |
031302/05/02 |
TSO |
Im Koy |
Project Type |
Rural Transport |
21,000,000 |
| Voat Chas |
2 |
202 |
Laterite road |
0.95 [ 0.95 ] |
Km |
7,017,263 |
2.500 Width (m) |
356.250 Earth fill m3 |
6,666,400 |
| Thma Koul |
3 |
202 |
Laterite road |
1.20 [ 1.20 ] |
Km |
7,017,250 |
2.500 Width (m) |
450.000 Earth fill m3 |
8,420,700 |
| Trapeang Thum |
4 |
202 |
Laterite road |
0.75 [ 0.75 ] |
Km |
7,017,200 |
2.500 Width (m) |
498.750 Earth fill m3 |
5,262,900 |
| Voat Chas |
5 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,000,000 |
Prey Chhor, Chrey Vien
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031303/05/01 |
TSO |
Im Koy |
Project Type |
Irrigation |
28,396,800 |
| Trapeang Ampil |
1 |
420 |
Canal |
0.55 [ 0.55 ] |
Km |
12,240,000 |
1.320 Depth (m) |
2,222.120 Volume (m3) |
6,732,000 |
| Tuek Nuem |
2 |
420 |
Canal |
0.60 [ 0.60 ] |
Km |
12,240,000 |
2.320 Depth (m) |
1,856.750 Volume (m3) |
7,344,000 |
| Trapeang Sangkae |
3 |
420 |
Canal |
1.17 [ 1.17 ] |
Km |
12,240,000 |
2.780 Depth (m) |
4,674.990 Volume (m3) |
14,320,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
28,396,800 |
| Contract ID |
031303/05/02 |
TSO |
Im Koy |
Project Type |
Rural Transport |
15,500,000 |
| Ou Kambot |
1 |
201 |
Earth road |
1.35 [ 1.35 ] |
Km |
9,850,000 |
3.500 Width (m) |
2,461.000 Earth fill m3 |
13,297,500 |
| Ou Kambot |
2 |
210 |
Pipe culvert (general) |
2.00 [ 2.00 ] |
Place |
1,101,250 |
0.600 Diameter (m) |
5.000 Length (m) |
2,202,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
15,500,000 |
Prey Chhor, Khvet Thum
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031304/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
29,785,000 |
| Pratheat |
2 |
202 |
Laterite road |
0.54 [ 0.54 ] |
Km |
9,778,118 |
2.500 Width (m) |
202.000 Earth fill m3 |
5,260,627 |
| Dangkao |
3 |
202 |
Laterite road |
0.65 [ 0.65 ] |
Km |
9,778,118 |
2.500 Width (m) |
241.000 Earth fill m3 |
6,306,886 |
| Dangkao |
5 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
2,925,000 |
1.000 Diameter (m) |
6.000 Length (m) |
2,925,000 |
| Ampil Thum |
6 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Khvet Thum |
7 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Khvet Thum |
8 |
202 |
Laterite road |
0.80 [ 0.80 ] |
Km |
9,778,125 |
3.000 Width (m) |
360.000 Earth fill m3 |
7,822,500 |
| Ampil Thum |
8 |
202 |
Laterite road |
0.63 [ 0.63 ] |
Km |
9,778,118 |
2.500 Width (m) |
237.000 Earth fill m3 |
6,169,992 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
29,785,006 |
Prey Chhor, Kor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031305/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
41,650,000 |
| Rumduol |
1 |
201 |
Earth road |
0.96 [ 0.96 ] |
Km |
12,846,250 |
3.000 Width (m) |
1,554.000 Earth fill m3 |
12,332,400 |
| Trapeang Poun |
2 |
201 |
Earth road |
0.88 [ 0.88 ] |
Km |
12,846,311 |
3.000 Width (m) |
1,677.000 Earth fill m3 |
11,317,600 |
| Svay Pen |
3 |
201 |
Earth road |
0.23 [ 0.23 ] |
Km |
12,846,256 |
3.000 Width (m) |
626.000 Earth fill m3 |
2,916,100 |
| Ta Meas |
4 |
201 |
Earth road |
0.40 [ 0.40 ] |
Km |
12,846,135 |
3.000 Width (m) |
899.000 Earth fill m3 |
5,151,300 |
| Ta Kaev |
5 |
201 |
Earth road |
0.22 [ 0.22 ] |
Km |
12,846,429 |
3.000 Width (m) |
606.000 Earth fill m3 |
2,877,600 |
| Trapeang Poun |
6 |
210 |
Pipe culvert (general) |
2.00 [ 2.00 ] |
Place |
1,495,000 |
0.600 Diameter (m) |
6.000 Length (m) |
2,990,000 |
| Ta Meas |
7 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
1,325,000 |
0.600 Diameter (m) |
4.000 Length (m) |
1,325,000 |
| Ta Kaev |
8 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
2,740,000 |
1.000 Diameter (m) |
6.000 Length (m) |
2,740,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,650,000 |
Prey Chhor, Krouch
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031306/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
13,500,000 |
| Tuol Khpos |
1 |
202 |
Laterite road |
0.71 [ 0.71 ] |
Km |
9,311,641 |
2.500 Width (m) |
146.000 Earth fill m3 |
6,639,200 |
| Krouch |
3 |
202 |
Laterite road |
0.67 [ 0.67 ] |
Km |
9,311,544 |
2.500 Width (m) |
136.000 Earth fill m3 |
6,210,800 |
| Tuol Khpos |
3 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,500,000 |
| Contract ID |
031306/05/02 |
TSO |
Im Koy |
Project Type |
Irrigation |
14,012,800 |
| Thmei |
1 |
420 |
Canal |
0.38 [ 0.38 ] |
Km |
26,700,800 |
1.560 Depth (m) |
1,660.000 Volume (m3) |
10,012,800 |
| Thmei |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
5.000 Width (m) |
2,000,000 |
| Thmei |
3 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
2,000,000 |
0.800 Diameter (m) |
5.000 Width (m) |
2,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
14,012,800 |
Prey Chhor, Lvea
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031307/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
34,516,800 |
| Me Meang |
1 |
202 |
Laterite road |
2.45 [ 2.45 ] |
Km |
8,264,000 |
2.500 Width (m) |
919.000 Earth fill m3 |
20,246,800 |
| Trapeang Chi Neang |
2 |
202 |
Laterite road |
0.28 [ 0.28 ] |
Km |
8,263,929 |
2.500 Width (m) |
105.000 Earth fill m3 |
2,313,900 |
| Lvea |
3 |
202 |
Laterite road |
0.60 [ 0.97 ] |
Km |
8,264,021 |
2.500 Width (m) |
225.000 Earth fill m3 |
8,016,100 |
| Trapeang Chi Neang |
4 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
2,640,000 |
1.000 Diameter (m) |
5.000 Length (m) |
2,640,000 |
| Me Meang |
5 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Lvea |
6 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
34,516,800 |
Prey Chhor, Mien
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031308/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
41,499,000 |
| Ou Ta Nov |
1 |
201 |
Earth road |
2.00 [ 2.00 ] |
Km |
9,135,995 |
3.000 Width (m) |
2,010.000 Earth fill m3 |
18,271,990 |
| Nam Ken |
2 |
201 |
Earth road |
1.27 [ 1.27 ] |
Km |
9,135,995 |
3.000 Width (m) |
1,532.000 Earth fill m3 |
11,602,714 |
| Ou Sangkae |
3 |
201 |
Earth road |
0.56 [ 0.56 ] |
Km |
9,135,995 |
3.000 Width (m) |
1,549.000 Earth fill m3 |
5,125,293 |
| Ou Ta Nov |
4 |
210 |
Pipe culvert (general) |
3.00 [ 3.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
3,900,000 |
| Nam Ken |
5 |
210 |
Pipe culvert (general) |
2.00 [ 2.00 ] |
Place |
1,300,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,600,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
41,499,997 |
Prey Chhor, Prey Chhor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031309/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
26,314,200 |
| Prey Chhor |
1 |
202 |
Laterite road |
1.76 [ 1.76 ] |
Km |
10,291,667 |
3.000 Width (m) |
926.000 Earth fill m3 |
18,154,500 |
| Sek Yum |
2 |
202 |
Laterite road |
0.28 [ 0.28 ] |
Km |
10,291,519 |
2.500 Width (m) |
106.000 Earth fill m3 |
2,912,500 |
| Prey Chhor |
3 |
202 |
Laterite road |
0.38 [ 0.38 ] |
Km |
10,279,167 |
2.500 Width (m) |
144.000 Earth fill m3 |
3,947,200 |
| Prey Chhor |
4 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Sek Yum |
5 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
26,314,200 |
Prey Chhor, Sour Saen
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031310/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
30,099,200 |
| Sour Saen |
1 |
202 |
Laterite road |
0.66 [ 0.66 ] |
Km |
8,758,000 |
3.000 Width (m) |
298.000 Earth fill m3 |
5,797,796 |
| Chambak Thma |
2 |
202 |
Laterite road |
1.04 [ 1.04 ] |
Km |
8,758,000 |
3.000 Width (m) |
468.000 Earth fill m3 |
9,099,562 |
| Trapeang Reang |
3 |
202 |
Laterite road |
0.70 [ 0.70 ] |
Km |
8,758,000 |
3.000 Width (m) |
314.000 Earth fill m3 |
6,121,842 |
| Sour Saen |
4 |
210 |
Pipe culvert (general) |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Chambak Thma |
5 |
210 |
Pipe culvert (general) |
2.00 [ 2.00 ] |
Place |
1,920,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,840,000 |
| Trapeang Reang |
6 |
210 |
Pipe culvert (general) |
2.00 [ 2.00 ] |
Place |
1,920,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,840,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,099,200 |
Prey Chhor, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031311/05/01 |
TSO |
Im Koy |
Project Type |
Irrigation |
32,300,000 |
| Smer |
1 |
420 |
Canal |
0.36 [ 0.36 ] |
Km |
14,731,181 |
1.920 Depth (m) |
2,924.000 Volume (m3) |
5,303,225 |
| Smer |
2 |
420 |
Canal |
0.50 [ 0.50 ] |
Km |
14,731,182 |
0.630 Depth (m) |
313.000 Volume (m3) |
7,365,591 |
| Kandaol Kaong |
3 |
420 |
Canal |
0.60 [ 0.60 ] |
Km |
14,731,182 |
0.370 Depth (m) |
376.000 Volume (m3) |
8,838,709 |
| Svay Prey |
4 |
420 |
Canal |
0.40 [ 0.40 ] |
Km |
14,731,180 |
0.190 Depth (m) |
251.000 Volume (m3) |
5,892,472 |
| Smer |
5 |
421 |
Concrete canal |
0.01 [ 0.01 ] |
Km |
612,500,000 |
0.700 Depth (m) |
2.000 |
4,900,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
32,299,997 |
Prey Chhor, Srangae
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031312/05/01 |
TSO |
Im Koy |
Project Type |
Irrigation |
31,284,400 |
| Trapeang Rung |
1 |
420 |
Canal |
0.60 [ 0.60 ] |
Km |
17,584,485 |
1.810 Depth (m) |
1,709.000 Volume (m3) |
10,550,691 |
| Senson Cheung |
2 |
420 |
Canal |
0.70 [ 1.18 ] |
Km |
17,584,344 |
1.810 Depth (m) |
5,114.250 Volume (m3) |
20,733,700 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,284,391 |
Prey Chhor, Thma Pun
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031313/05/01 |
TSO |
Im Koy |
Project Type |
Irrigation |
30,675,700 |
| Trang |
1 |
410 |
Earth dam |
0.23 [ 0.23 ] |
Km |
120,780,889 |
2.190 Max. height (m) |
4,735.000 Volume (m3) |
27,175,700 |
| Trang |
2 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
3,500,000 |
0.600 Diameter (m) |
5.000 Width (m) |
3,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
30,675,700 |
| Contract ID |
031313/05/02 |
TSO |
Im Koy |
Project Type |
Irrigation |
9,500,000 |
| Andoung Phdau |
1 |
420 |
Canal |
0.10 [ 0.10 ] |
Km |
95,000,000 |
1.000 Depth (m) |
2,100.000 Volume (m3) |
9,500,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,500,000 |
Prey Chhor, Tong Rong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031314/05/01 |
TSO |
Im Koy |
Project Type |
Rural Transport |
31,561,800 |
| Tong Rong |
1 |
202 |
Laterite road |
0.55 [ 0.55 ] |
Km |
11,115,455 |
2.500 Width (m) |
206.250 Earth fill m3 |
6,113,500 |
| Samraong |
2 |
202 |
Laterite road |
1.11 [ 1.11 ] |
Km |
11,115,530 |
2.500 Width (m) |
542.750 Earth fill m3 |
12,382,700 |
| Tro Mukh Ti Muoy |
3 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
11,115,600 |
2.500 Width (m) |
225.000 Earth fill m3 |
5,557,800 |
| Kok Kandal |
4 |
202 |
Laterite road |
0.50 [ 0.50 ] |
Km |
11,115,600 |
2.500 Width (m) |
225.000 Earth fill m3 |
5,557,800 |
| Tong Rong |
5 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Samraong |
6 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Kok Kandal |
7 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
650,000 |
0.400 |
1.500 |
650,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,561,800 |
Prey Chhor, Trapeang Preah
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
031315/05/01 |
TSO |
Im Koy |
Project Type |
Irrigation |
21,880,000 |
| Kaoh Svay |
1 |
410 |
Earth dam |
0.23 [ 0.23 ] |
Km |
39,466,667 |
1.810 Max. height (m) |
1,948.000 Volume (m3) |
8,880,000 |
| Kaoh Svay |
2 |
455 |
Single cell box culvert with gate |
1.00 [ 1.00 ] |
Place |
13,000,000 |
3.000 Total span (m) |
5.000 Width (m) |
13,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
21,880,000 |
| Contract ID |
031315/05/02 |
TSO |
Im Koy |
Project Type |
Irrigation |
22,192,400 |
| Kaoh Svay |
2 |
420 |
Canal |
0.40 [ 0.40 ] |
Km |
9,444,000 |
1.660 Depth (m) |
915.000 Volume (m3) |
3,777,600 |
| Kaoh Svay |
3 |
452 |
Single pipe Culvert with gate |
1.00 [ 1.00 ] |
Place |
7,200,000 |
1.000 Diameter (m) |
4.000 Width (m) |
7,200,000 |
| Trapeang Reang |
4 |
420 |
Canal |
0.60 [ 1.19 ] |
Km |
9,448,020 |
0.970 Depth (m) |
2,428.000 Volume (m3) |
11,214,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
22,192,400 |