Contract Outputs

Location: Kampong Cham \ Dambae Budget Year: 2005

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Dambae, Chong Cheach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030401/05/01 TSO Him huon Project Type Rural Transport 33,127,779
Cheach Thum 1 201 Earth road 1.00 [ 1.00 ] Km 14,060,222 4.000 Width (m) 0.450 Earth fill m3 14,060,222
Ta Meakh Chas 2 201 Earth road 0.52 [ 0.52 ] Km 14,060,223 4.000 Width (m) 0.350 Earth fill m3 7,367,557
Cheach Thum 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Cheach Thum 4 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,500,000 0.800 Diameter (m) 5.000 Length (m) 4,500,000
Cheach Thum 5 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,800,000 1.000 Diameter (m) 5.000 Length (m) 1,800,000
Cheach Thum 6 213 Triple pipe culvert 1.00 [ 1.00 ] Place 1,800,000 1.000 Diameter (m) 5.000 Length (m) 1,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,127,779

Dambae, Dambae

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030402/05/01 TSO Him huon Project Type Rural Transport 24,999,000
Dambae 1 202 Laterite road 1.72 [ 1.72 ] Km 9,130,387 3.500 Width (m) 0.150 Earth fill m3 15,658,613
Thnal 2 202 Laterite road 1.02 [ 1.02 ] Km 9,130,387 3.500 Width (m) 0.150 Earth fill m3 9,340,386
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  24,998,999

Dambae, Kouk Srok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030403/05/01 TSO Him huon Project Type Rural Transport 29,240,000
Kouk Char 1 202 Laterite road 1.30 [ 1.30 ] Km 16,000,000 3.500 Width (m) 0.150 Earth fill m3 20,800,000
Kouk Char 2 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,360,000 0.600 Diameter (m) 5.000 Length (m) 5,440,000
Kouk Char 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 0.800 Diameter (m) 5.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  29,240,000

Dambae, Neang Teut

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030404/05/01 TSO Him huon Project Type Rural Transport 26,476,100
Neang Teut 1 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,242,800 0.600 Diameter (m) 5.000 Length (m) 2,485,600
Neang Teut 2 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,784,500 0.800 Diameter (m) 5.000 Length (m) 3,569,000
Neang Teut 3 222 Double cell box culvert 1.00 [ 1.00 ] Place 8,798,200 1.500 Total Span (m) 5.000 Width(m) 8,798,200
Neang Teut 4 222 Double cell box culvert 1.00 [ 1.00 ] Place 11,623,300 1.500 Total Span (m) 5.000 Width(m) 11,623,300
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  26,476,100

Dambae, Seda

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030405/05/01 TSO Him huon Project Type Rural Transport 37,098,180
BreakChorChomren 1 201 Earth road 2.36 [ 2.36 ] Km 15,116,000 4.000 Width (m) 0.500 Earth fill m3 35,598,180
BreakChorChomren 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 1,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,098,180

Dambae, Tuek Chrov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030406/05/01 TSO Him huon Project Type Irrigation 25,948,800
Choam Trakuon 1 410 Earth dam 0.10 [ 0.10 ] Km 118,422,000 1.900 Max. height (m) 2,038.000 Volume (m3) 11,842,200
Choam Trakuon 2 433 Concrete spillway 1.00 [ 1.00 ] Place 14,106,600 12.000 Length (m) 1.000 14,106,600
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,948,800
Contract ID 030406/05/02 TSO Him huon Project Type Irrigation 9,499,900
Choam Trakuon 2 420 Canal 0.14 [ 0.14 ] Km 21,794,871 0.430 Depth (m) 487.990 Volume (m3) 3,051,282
Me Sar 3 420 Canal 0.25 [ 0.25 ] Km 21,794,868 0.560 Depth (m) 262.960 Volume (m3) 5,448,717
Choam Trakuon 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 1.000 Diameter (m) 5.000 Length (m) 1,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  9,499,999

Dambae, Trapeang Pring

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 030407/05/01 TSO Him huon Project Type Rural Transport 27,200,000
Srae Kak 1 201 Earth road 1.70 [ 1.70 ] Km 16,000,000 4.000 Width (m) 4,178.000 Earth fill m3 27,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,200,000