Contract Outputs

Location: Kampong Cham \ Srei Santhor Budget Year: 2005

Batheay    Chamkar Leu    Cheung Prey    Dambae    Kampong Cham    Kampong Siem    Kang Meas    Kaoh Soutin    Krouch Chhmar    Memot    Ou Reang Ov    Ponhea Kraek    Prey Chhor    Srei Santhor    Stueng Trang    Tboung Khmum   

Srei Santhor, Baray

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031401/05/01 TSO Tep That Project Type Rural Transport 22,000,000
Banteay 2 201 Earth road 0.26 [ 0.26 ] Km 38,461,538 4.000 Width (m) 1,270.000 Earth fill m3 10,000,000
Sya Boeng Veaeng 3 201 Earth road 0.23 [ 0.23 ] Km 34,782,609 3.500 Width (m) 1,437.000 Earth fill m3 8,000,000
Banteay 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Sya Boeng Veaeng 5 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.800 Diameter (m) 6.000 Length (m) 3,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,000,000
Contract ID 031401/05/02 TSO Tep That Project Type Irrigation 10,500,000
Kamphlak 2 420 Canal 0.30 [ 0.30 ] Km 35,000,000 1.900 Depth (m) 2,255.000 Volume (m3) 10,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  10,500,000

Srei Santhor, Chi Bal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031402/05/01 TSO Tep That Project Type Rural Transport 27,600,000
Chi Bal 1 201 Earth road 0.68 [ 0.68 ] Km 20,588,235 4.000 Width (m) 111.000 Earth fill m3 14,000,000
Khyaong 2 201 Earth road 0.63 [ 0.63 ] Km 21,760,000 4.000 Width (m) 111.000 Earth fill m3 13,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,600,000

Srei Santhor, Khnar Sa

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031403/05/01 TSO Tep That Project Type Irrigation 25,500,000
Khnar Sa 1 420 Canal 1.35 [ 1.35 ] Km 18,888,889 1.500 Depth (m) 5,942.550 Volume (m3) 25,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  25,500,000

Srei Santhor, Kaoh Andaet

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031404/05/01 TSO Tep That Project Type Rural Transport 35,000,000
Kbal Kaoh 1 201 Earth road 0.59 [ 0.59 ] Km 23,931,624 4.000 Width (m) 111.000 Earth fill m3 14,000,000
Krouch Saeuch 2 201 Earth road 2.44 [ 2.44 ] Km 7,802,875 4.000 Width (m) 111.000 Earth fill m3 19,000,000
Krouch Saeuch 3 212 Double pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.600 Diameter (m) 7.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  35,000,000

Srei Santhor, Mean Chey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031405/05/01 TSO Tep That Project Type Rural Transport 30,226,600
Kaoh Kou 1 201 Earth road 0.43 [ 0.43 ] Km 41,124,760 4.000 Width (m) 111.000 Earth fill m3 17,683,647
Chey 2 201 Earth road 0.31 [ 0.31 ] Km 41,124,761 4.000 Width (m) 111.000 Earth fill m3 12,543,052
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,226,699

Srei Santhor, Pteah Kandal

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031406/05/01 TSO Tep That Project Type Irrigation 33,000,000
Ou Leav 1 420 Canal 0.15 [ 0.15 ] Km 132,000,000 1.800 Depth (m) 3,536.880 Volume (m3) 19,800,000
Phteah Kandal Kraom 2 420 Canal 0.05 [ 0.05 ] Km 264,000,000 2.000 Depth (m) 3,931.000 Volume (m3) 13,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,000,000

Srei Santhor, Pram Yam

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031407/05/01 TSO Tep That Project Type Irrigation 30,900,000
Kdei Thkar 1 420 Canal 1.60 [ 1.60 ] Km 19,312,500 1.300 Depth (m) 6,425.480 Volume (m3) 30,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  30,900,000

Srei Santhor, Preaek Dambouk

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031408/05/01 TSO Tep That Project Type Irrigation 50,000,000
Ta Meun 1 421 Concrete canal 0.34 [ 0.34 ] Km 53,779,070 0.500 Depth (m) 0.500 18,500,000
Preaek Dambouk Leu 2 421 Concrete canal 0.59 [ 0.59 ] Km 53,299,492 0.500 Depth (m) 0.500 31,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  50,000,000

Srei Santhor, Preaek Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031409/05/01 TSO Tep That Project Type Rural Transport 21,800,000
Preaek Pou Kraom 2 201 Earth road 0.90 [ 0.90 ] Km 22,346,369 4.000 Width (m) 3,263.000 Earth fill m3 20,000,000
Preaek Pou Kraom 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.800 Diameter (m) 6.000 Length (m) 1,000,000
Preaek Pou Kraom 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 800,000 0.600 Diameter (m) 6.000 Length (m) 800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  21,800,000
Contract ID 031409/05/02 TSO Tep That Project Type Irrigation 19,900,000
Roka Tvear 2 420 Canal 1.16 [ 1.16 ] Km 17,155,172 0.800 Depth (m) 4,709.000 Volume (m3) 19,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  19,900,000

Srei Santhor, Preaek Rumdeng

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031410/05/01 TSO Tep That Project Type Rural Transport 39,200,000
Tnaot Kha 1 201 Earth road 0.60 [ 0.60 ] Km 33,333,333 5.000 Width (m) 111.000 Earth fill m3 20,000,000
Tnaot Ka 2 201 Earth road 0.60 [ 0.60 ] Km 25,000,000 4.000 Width (m) 111.000 Earth fill m3 15,000,000
Tnaot Kha 3 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,500,000 0.600 Diameter (m) 6.000 Length (m) 3,000,000
Tnaot Ka 4 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,200,000 0.600 Diameter (m) 6.000 Length (m) 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  39,200,000

Srei Santhor, Ruessei Srok

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031411/05/01 TSO Tep That Project Type Irrigation 16,800,000
Prey Totueng 1 451 Small water gate 1.00 [ 1.00 ] Place 16,800,000 3.600 Length (m) 2.500 Height (m) 16,800,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  16,800,000
Contract ID 031411/05/02 TSO Tep That Project Type Irrigation 13,500,000
Tnaot Kraom 1 420 Canal 0.07 [ 0.07 ] Km 192,857,143 1.800 Depth (m) 3,185.000 Volume (m3) 13,500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,500,000

Srei Santhor, Svay Pou

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031412/05/01 TSO Tep That Project Type Irrigation 22,148,000
Svay 1 420 Canal 0.65 [ 0.65 ] Km 34,073,846 2.500 Depth (m) 5,096.000 Volume (m3) 22,148,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  22,148,000
Contract ID 031412/05/02 TSO Tep That Project Type Rural Transport 8,050,000
Pou 1 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 1.000 Diameter (m) 5.000 Length (m) 2,600,000
Pou 2 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,850,000 1.000 Diameter (m) 6.000 Length (m) 2,850,000
Khvet 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,600,000 1.000 Diameter (m) 5.000 Length (m) 2,600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  8,050,000

Srei Santhor, Svay Sach Phnum

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031413/05/01 TSO Tep That Project Type Irrigation 27,900,000
Svay Tboung 1 420 Canal 0.95 [ 0.95 ] Km 29,368,421 2.000 Depth (m) 6,640.000 Volume (m3) 27,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  27,900,000

Srei Santhor, Tong Tralach

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 031414/05/01 TSO Tep That Project Type Irrigation 23,000,000
Chonloat Dai 1 410 Earth dam 0.46 [ 0.46 ] Km 32,751,092 0.800 Max. height (m) 2,183.000 Volume (m3) 15,000,000
Chonloat Dai 2 452 Single pipe Culvert with gate 2.00 [ 2.00 ] Place 4,000,000 0.800 Diameter (m) 5.000 Width (m) 8,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  23,000,000