Contract Outputs

Location: Prey Veng \ Kampong Trabaek Budget Year: 2006

Ba Phnum    Kamchay Mear    Kampong Trabaek    Kanhchriech    Me Sang    Peam Chor    Peam Ro    Pea Reang    Preah Sdach    Prey Veaeng    Kampong Leav    Sithor Kandal   

Kampong Trabaek, Ansaong

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140301/06/01 TSO Lonh Saran Project Type Rural Transport 37,130,000
Ta Aong 1 201 Earth road 1.40 [ 1.48 ] Km 24,750,000 4.000 Width (m) 7,568.000 Earth fill m3 36,630,000
Banteab Bos 2 281 Width restriction posts 1.00 [ 1.00 ] Place 500,000 0.000 0.000 500,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  37,130,000

Kampong Trabaek, Cham

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140302/06/01 TSO Lonh Saran Project Type Rural Transport 79,400,000
Prasdach 1 201 Earth road 1.30 [ 1.30 ] Km 20,000,000 4.000 Width (m) 14,382.000 Earth fill m3 26,000,000
Chipeay 2 201 Earth road 0.59 [ 0.59 ] Km 20,000,000 4.000 Width (m) 0.000 Earth fill m3 11,800,000
Roluos 3 201 Earth road 1.76 [ 1.76 ] Km 20,000,000 4.000 Width (m) 0.000 Earth fill m3 35,200,000
Roluos 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 950,000 0.600 Diameter (m) 5.000 Length (m) 1,900,000
Krang Leav 5 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.000 0.000 700,000
Chipeay 6 211 Single pipe culvert 0.00 [ 2.00 ] Place 950,000 0.600 Diameter (m) 5.000 Length (m) 1,900,000
Prasdach 7 211 Single pipe culvert 0.00 [ 2.00 ] Place 950,000 0.600 Diameter (m) 5.000 Length (m) 1,900,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  79,400,000

Kampong Trabaek, Cheang Daek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140303/06/01 TSO Lonh Saran Project Type Irrigation 74,354,800
Krang Veaeng 1 420 Canal 0.20 [ 0.28 ] Km 47,060,000 3.000 Depth (m) 22,318.000 Volume (m3) 13,176,800
Angkrong 2 420 Canal 1.30 [ 1.30 ] Km 47,060,000 3.000 Depth (m) 0.000 Volume (m3) 61,178,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  74,354,800
Contract ID 140303/06/02 TSO Lonh Saran Project Type Rural Transport 13,729,800
Ta Meas 1 201 Earth road 0.55 [ 0.55 ] Km 22,236,000 4.000 Width (m) 1,959.000 Earth fill m3 12,229,800
Ta Meas 2 281 Width restriction posts 1.00 [ 1.00 ] Place 750,000 0.000 0.000 750,000
Boeng Kratueb 3 281 Width restriction posts 1.00 [ 1.00 ] Place 750,000 0.000 0.000 750,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  13,729,800

Kampong Trabaek, Chrey

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140304/06/01 TSO Lonh Saran Project Type Rural Transport 65,202,500
Chrey 1 201 Earth road 1.00 [ 1.00 ] Km 19,150,000 4.000 Width (m) 5,932.000 Earth fill m3 19,150,000
Pnov 2 201 Earth road 1.35 [ 1.35 ] Km 19,150,000 4.000 Width (m) 0.000 Earth fill m3 25,852,500
Traok 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Pnov 4 211 Single pipe culvert 5.00 [ 5.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 5,000,000
Chrey 5 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Svay Pak 7 211 Single pipe culvert 2.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Doung 8 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Dak Por 9 211 Single pipe culvert 1.00 [ 1.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 1,000,000
Samraong 10 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Trapeang Re 11 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Samraong 11 281 Width restriction posts 2.00 [ 2.00 ] Place 600,000 0.000 0.000 1,200,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  65,202,500

Kampong Trabaek, Kansaom Ak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140305/06/01 TSO Vong Kim An Project Type Rural Transport 63,296,800
Trapeang Run 1 201 Earth road 2.16 [ 2.16 ] Km 23,290,000 4.000 Width (m) 8,392.000 Earth fill m3 50,259,820
Trapeang Run 2 211 Single pipe culvert 5.00 [ 7.00 ] Place 1,500,000 0.600 Diameter (m) 5.000 Length (m) 10,500,000
Kansaom Ak 3 201 Earth road 0.92 [ 0.92 ] Km 500,000 3.500 Width (m) 750.000 Earth fill m3 462,000
Toap Siem 4 201 Earth road 2.85 [ 2.85 ] Km 500,000 3.500 Width (m) 0.000 Earth fill m3 1,425,000
Trapeang Run 5 201 Earth road 1.30 [ 1.30 ] Km 500,000 3.500 Width (m) 0.000 Earth fill m3 650,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  63,296,820

Kampong Trabaek, Kou Khchak

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140306/06/01 TSO Vong Kim An Project Type Rural Transport 98,568,000
Chamreh 3 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 3,600,000
Trav 4 211 Single pipe culvert 2.00 [ 2.00 ] Place 1,200,000 0.600 Diameter (m) 5.000 Length (m) 2,400,000
Kou Khchak 5 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.000 0.000 700,000
Trav 6 201 Earth road 1.10 [ 1.10 ] Km 25,395,000 4.000 Width (m) 15,153.000 Earth fill m3 27,934,500
Chamreh 6 201 Earth road 2.30 [ 2.49 ] Km 25,395,000 4.000 Width (m) 0.000 Earth fill m3 63,233,550
Trav 6 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.000 0.000 700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  98,568,050

Kampong Trabaek, Kampong Trabaek

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140307/06/01 TSO Vong Kim An Project Type Rural Transport 78,030,000
Preaek Phdau 1 201 Earth road 2.00 [ 2.00 ] Km 19,980,000 4.000 Width (m) 11,745.000 Earth fill m3 39,960,000
Kampong Svay Kaeut 2 201 Earth road 1.50 [ 1.50 ] Km 19,980,000 4.000 Width (m) 0.000 Earth fill m3 29,970,000
Kampong Svay Kaeut 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 5.000 Length (m) 3,000,000
Anlong Reach 4 212 Double pipe culvert 1.00 [ 1.00 ] Place 3,000,000 1.000 Diameter (m) 4.000 Length (m) 3,000,000
Anlong Reach 5 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.000 0.000 700,000
Preaek Phdau 6 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.000 0.000 700,000
Kampong Svay Kaeut 7 281 Width restriction posts 1.00 [ 1.00 ] Place 700,000 0.000 0.000 700,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  78,030,000

Kampong Trabaek, Peam Montear

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140308/06/01 TSO Vong Kim An Project Type Rural Transport 40,886,800
Ta Kaev 2 201 Earth road 1.55 [ 1.63 ] Km 24,372,300 4.000 Width (m) 5,734.000 Earth fill m3 39,726,849
Ta Kaev 2 201 Earth road 1.55 [ 1.63 ] Km 24,372,300 4.000 Width (m) 5,734.000 Earth fill m3 39,726,849
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  40,886,849

Kampong Trabaek, Prasat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140309/06/01 TSO Vong Kim An Project Type Rural Transport 41,516,100
Chrolong 1 201 Earth road 0.90 [ 0.90 ] Km 16,670,000 3.000 Width (m) 5,697.000 Earth fill m3 15,003,000
Prasat 2 201 Earth road 1.07 [ 1.07 ] Km 18,330,000 5.000 Width (m) 0.000 Earth fill m3 19,613,100
Chrolong 3 211 Single pipe culvert 4.00 [ 4.00 ] Place 1,050,000 0.600 Diameter (m) 4.000 Length (m) 4,200,000
Prasat 4 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.000 0.000 600,000
Prasat 5 211 Single pipe culvert 0.00 [ 1.00 ] Place 1,050,000 0.600 Diameter (m) 4.000 Length (m) 1,050,000
Thkov 6 211 Single pipe culvert 0.00 [ 1.00 ] Place 1,050,000 0.600 Diameter (m) 4.000 Length (m) 1,050,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  41,516,100

Kampong Trabaek, Pratheat

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140310/06/01 TSO Lonh Saran Project Type Rural Transport 80,855,000
Prey Nheat 1 201 Earth road 0.39 [ 0.39 ] Km 17,000,000 4.000 Width (m) 12,093.000 Earth fill m3 6,630,000
Traok 2 201 Earth road 0.65 [ 0.65 ] Km 17,000,000 4.000 Width (m) 0.000 Earth fill m3 11,050,000
Pratheat 3 201 Earth road 0.48 [ 0.48 ] Km 17,000,000 4.000 Width (m) 0.000 Earth fill m3 8,075,000
Angkanh 4 201 Earth road 3.10 [ 3.10 ] Km 17,000,000 4.000 Width (m) 0.000 Earth fill m3 52,700,000
Angkanh 5 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.000 0.000 600,000
Prey Nheat 6 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.000 0.000 600,000
Tramot 7 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.000 0.000 600,000
Traok 8 281 Width restriction posts 1.00 [ 1.00 ] Place 600,000 0.000 0.000 600,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  80,855,000

Kampong Trabaek, Prey Chhor

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140311/06/01 TSO Vong Kim An Project Type Rural Transport 63,996,900
Doung 1 201 Earth road 1.90 [ 1.90 ] Km 30,308,900 4.000 Width (m) 9,370.000 Earth fill m3 57,586,910
Doung 2 211 Single pipe culvert 3.00 [ 3.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 3,000,000
Doung 3 211 Single pipe culvert 1.00 [ 1.00 ] Place 2,000,000 0.800 Diameter (m) 5.000 Length (m) 2,000,000
A Kreach 4 201 Earth road 2.35 [ 2.35 ] Km 600,000 4.000 Width (m) 500.000 Earth fill m3 1,410,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  63,996,910

Kampong Trabaek, Prey Poun

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140312/06/01 TSO Lonh Saran Project Type Rural Transport 33,138,700
Chi Ak 1 201 Earth road 2.35 [ 2.35 ] Km 13,250,500 4.000 Width (m) 5,244.000 Earth fill m3 31,138,675
Chi Ak 2 211 Single pipe culvert 1.00 [ 2.00 ] Place 1,000,000 0.600 Diameter (m) 5.000 Length (m) 2,000,000
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  33,138,675

Kampong Trabaek, Thkov

Village No. Code Description Qty [Contracted] Unit Dimension #1 Dimension #2 Total
Contract ID 140313/06/01 TSO Lonh Saran Project Type Rural Transport 32,382,000
Pouthi Vongs 1 201 Earth road 0.80 [ 0.80 ] Km 18,079,000 4.000 Width (m) 5,416.000 Earth fill m3 14,463,200
Ta Ho 2 201 Earth road 1.44 [ 1.44 ] Km 12,487,000 3.000 Width (m) 0.000 Earth fill m3 17,918,845
Note: Qty [Contract] : Planned qty [ qty in contract signed ] Grand Total:  32,382,045