Contract Outputs
Location: Prey Veng \ Prey Veaeng Budget Year: 2006
Ba Phnum
Kamchay Mear
Kampong Trabaek
Kanhchriech
Me Sang
Peam Chor
Peam Ro
Pea Reang
Preah Sdach
Prey Veaeng
Kampong Leav
Sithor Kandal
Prey Veaeng, Angkor Tret
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141001/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
9,100,000 |
| Angkor Tret |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,950,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,900,000 |
| Trabaek Lech |
2 |
212 |
Double pipe culvert |
1.00 [ 2.00 ] |
Place |
1,550,000 |
0.800 Diameter (m) |
5.000 Length (m) |
3,100,000 |
| Boeng Rach |
3 |
201 |
Earth road |
3.00 [ 3.00 ] |
Km |
700,000 |
4.000 Width (m) |
260.000 Earth fill m3 |
2,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,100,000 |
| Contract ID |
141001/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
82,305,000 |
| Angkor Tret |
1 |
420 |
Canal |
1.25 [ 1.25 ] |
Km |
17,700,000 |
2.020 Depth (m) |
23,356.000 Volume (m3) |
22,125,000 |
| Sraloung Muoy |
2 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
17,700,000 |
2.020 Depth (m) |
0.000 Volume (m3) |
17,700,000 |
| Trabaek Lech |
3 |
420 |
Canal |
1.00 [ 1.40 ] |
Km |
17,700,000 |
2.020 Depth (m) |
0.000 Volume (m3) |
24,780,000 |
| Trabaek Kaeut |
4 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
17,700,000 |
2.020 Depth (m) |
1.000 Volume (m3) |
17,700,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
82,305,000 |
Prey Veaeng, Chea Khlang
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141002/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
4,980,000 |
| Chhkae Koun |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
1.000 Diameter (m) |
4.000 Length (m) |
1,800,000 |
| Khla Pear |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,800,000 |
1.000 Diameter (m) |
4.000 Length (m) |
1,800,000 |
| Thnong |
3 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
1,150,000 |
5.000 Width (m) |
250.000 Earth fill m3 |
1,150,000 |
| Chres |
4 |
201 |
Earth road |
0.20 [ 0.20 ] |
Km |
1,150,000 |
5.000 Width (m) |
0.000 Earth fill m3 |
230,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
4,980,000 |
| Contract ID |
141002/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
84,280,000 |
| Chhkae Koun |
2 |
420 |
Canal |
0.80 [ 2.90 ] |
Km |
8,600,000 |
1.870 Depth (m) |
23,576.000 Volume (m3) |
24,940,000 |
| Thnong |
3 |
420 |
Canal |
2.80 [ 4.50 ] |
Km |
8,600,000 |
1.870 Depth (m) |
0.000 Volume (m3) |
38,700,000 |
| Chea Khlang |
3 |
420 |
Canal |
1.00 [ 2.40 ] |
Km |
8,600,000 |
1.870 Depth (m) |
0.000 Volume (m3) |
20,640,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
84,280,000 |
Prey Veaeng, Chrey
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141003/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
9,250,000 |
| Ruessei Slab |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,000,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,000,000 |
| Doun Yuk |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Prohear |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Chrey Veal |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Prey Phsar |
5 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
1,250,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
1,250,000 |
| Doun Yuk |
6 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
1,250,000 |
4.000 Width (m) |
300.000 Earth fill m3 |
1,000,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
9,250,000 |
| Contract ID |
141003/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
86,327,100 |
| Svay at |
1 |
420 |
Canal |
1.05 [ 1.05 ] |
Km |
7,993,250 |
1.430 Depth (m) |
23,943.000 Volume (m3) |
8,392,913 |
| Krasang Koy |
2 |
420 |
Canal |
0.95 [ 3.35 ] |
Km |
7,993,250 |
1.430 Depth (m) |
0.000 Volume (m3) |
26,777,388 |
| Prohear |
3 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
7,993,250 |
1.430 Depth (m) |
0.000 Volume (m3) |
7,993,250 |
| Menong Leu |
4 |
420 |
Canal |
1.50 [ 4.50 ] |
Km |
7,993,250 |
1.430 Depth (m) |
0.000 Volume (m3) |
35,969,625 |
| Menong Kraom |
5 |
420 |
Canal |
0.90 [ 0.90 ] |
Km |
7,993,250 |
1.430 Depth (m) |
0.000 Volume (m3) |
7,193,925 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
86,327,100 |
Prey Veaeng, Damrei Puon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141004/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
8,230,000 |
| Prey Phleang |
1 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
500,000 |
0.600 Diameter (m) |
5.000 Length (m) |
500,000 |
| Koam Pradaeus |
2 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
600,000 |
0.600 Diameter (m) |
5.000 Length (m) |
600,000 |
| Prey Phleang |
3 |
201 |
Earth road |
1.90 [ 1.90 ] |
Km |
2,300,000 |
5.000 Width (m) |
980.000 Earth fill m3 |
4,370,000 |
| Koam Pradaeus |
4 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
2,300,000 |
5.000 Width (m) |
0.000 Earth fill m3 |
2,760,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,230,000 |
| Contract ID |
141004/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
67,580,000 |
| Chamkar Kuoy Lech |
1 |
420 |
Canal |
0.80 [ 0.80 ] |
Km |
21,800,000 |
1.990 Depth (m) |
19,046.000 Volume (m3) |
17,440,000 |
| Ou Kandaol Tboung |
2 |
420 |
Canal |
1.90 [ 2.30 ] |
Km |
21,800,000 |
1.990 Depth (m) |
0.000 Volume (m3) |
50,140,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
67,580,000 |
Prey Veaeng, Me Bon
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141005/06/01 |
TSO |
Lonh Saran |
Project Type |
Rural Transport |
70,985,000 |
| Chachak Ti Pir |
1 |
201 |
Earth road |
0.68 [ 0.68 ] |
Km |
21,500,000 |
5.000 Width (m) |
11,002.000 Earth fill m3 |
14,512,500 |
| Ha Bour |
2 |
201 |
Earth road |
1.25 [ 1.25 ] |
Km |
21,500,000 |
5.000 Width (m) |
0.000 Earth fill m3 |
26,875,000 |
| Thkov |
3 |
201 |
Earth road |
0.90 [ 0.90 ] |
Km |
21,500,000 |
5.000 Width (m) |
0.000 Earth fill m3 |
19,350,000 |
| Thkov |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Thkov |
5 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Roka Khsok |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,400,000 |
0.800 Diameter (m) |
5.000 Length (m) |
1,400,000 |
| Me Bon |
7 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,200,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,200,000 |
| Me Bon |
8 |
201 |
Earth road |
1.00 [ 1.00 ] |
Km |
1,000,000 |
4.000 Width (m) |
62.000 Earth fill m3 |
1,000,000 |
| Chachak Ti Muoy |
9 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
500,000 |
0.000 |
0.000 |
500,000 |
| Me Bon |
10 |
201 |
Earth road |
0.00 [ 0.17 ] |
Km |
21,500,000 |
5.000 Width (m) |
474.000 Earth fill m3 |
3,547,500 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
70,985,000 |
Prey Veaeng, Pean Roung
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141006/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
8,000,000 |
| Andoung Thma |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,300,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,600,000 |
| Prey Voa |
2 |
201 |
Earth road |
0.70 [ 0.70 ] |
Km |
2,400,000 |
4.000 Width (m) |
675.000 Earth fill m3 |
1,680,000 |
| Prey Nokor Knong |
3 |
201 |
Earth road |
0.95 [ 0.95 ] |
Km |
2,400,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
2,280,000 |
| Chhnoeng Pos |
4 |
201 |
Earth road |
0.60 [ 0.60 ] |
Km |
2,400,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
1,440,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
8,000,000 |
| Contract ID |
141006/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
113,400,000 |
| Prey Chreang |
1 |
420 |
Canal |
2.70 [ 2.70 ] |
Km |
21,000,000 |
1.800 Depth (m) |
31,708.000 Volume (m3) |
56,700,000 |
| Krang Chambak |
2 |
420 |
Canal |
0.50 [ 0.50 ] |
Km |
21,000,000 |
1.800 Depth (m) |
0.000 Volume (m3) |
10,500,000 |
| Pean Roung |
3 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
21,000,000 |
1.800 Depth (m) |
0.000 Volume (m3) |
21,000,000 |
| Andoung Thma |
4 |
420 |
Canal |
0.55 [ 1.20 ] |
Km |
21,000,000 |
1.800 Depth (m) |
0.000 Volume (m3) |
25,200,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
113,400,000 |
Prey Veaeng, Popueus
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141007/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
16,010,000 |
| Khsaok Cheung |
1 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,400,000 |
1.000 Diameter (m) |
4.000 Length (m) |
4,200,000 |
| Khsaok Kandal |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,400,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,800,000 |
| Khsaok Tboung |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,400,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,800,000 |
| Khsaok Cheung |
4 |
201 |
Earth road |
1.40 [ 1.40 ] |
Km |
2,300,000 |
4.000 Width (m) |
300.000 Earth fill m3 |
3,220,000 |
| Thnal Chey |
5 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
2,300,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
2,990,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
16,010,000 |
| Contract ID |
141007/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
57,886,500 |
| Khsaok Kandal |
2 |
420 |
Canal |
1.10 [ 1.30 ] |
Km |
16,539,000 |
1.380 Depth (m) |
0.000 Volume (m3) |
21,500,700 |
| Khsaok Cheung |
3 |
420 |
Canal |
1.00 [ 1.00 ] |
Km |
16,539,000 |
1.380 Depth (m) |
15,967.000 Volume (m3) |
16,539,000 |
| Khsaok Tboung |
3 |
420 |
Canal |
1.20 [ 1.20 ] |
Km |
16,539,000 |
1.380 Depth (m) |
0.000 Volume (m3) |
19,846,800 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
57,886,500 |
Prey Veaeng, Prey Khla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141008/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
27,500,000 |
| Soben |
1 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
11,700,000 |
5.000 Width (m) |
2,419.000 Earth fill m3 |
5,850,000 |
| Krachab Ti Muoy |
2 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
11,700,000 |
5.000 Width (m) |
0.000 Earth fill m3 |
5,850,000 |
| Soben |
3 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Kong Lang Ti Muoy |
4 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Sangvan |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
4.000 Length (m) |
4,000,000 |
| Krachab Ti Bei |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
2,000,000 |
1.000 Diameter (m) |
4.000 Length (m) |
2,000,000 |
| Prey Khla Ti Muoy |
7 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
3,000,000 |
4.000 Width (m) |
500.000 Earth fill m3 |
1,500,000 |
| Veal |
8 |
201 |
Earth road |
0.80 [ 0.80 ] |
Km |
3,000,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
2,400,000 |
| Krachab Ti Muoy |
9 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
3,000,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
1,500,000 |
| Sangvan |
10 |
281 |
Width restriction posts |
1.00 [ 1.00 ] |
Place |
400,000 |
0.000 |
0.000 |
400,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
27,500,000 |
| Contract ID |
141008/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
31,153,100 |
| Kong Lang Ti Muoy |
1 |
420 |
Canal |
0.40 [ 0.40 ] |
Km |
5,769,100 |
2.030 Depth (m) |
17,181.000 Volume (m3) |
2,307,640 |
| Krachab Ti Muoy |
2 |
420 |
Canal |
1.65 [ 1.65 ] |
Km |
5,769,100 |
2.030 Depth (m) |
0.000 Volume (m3) |
9,519,015 |
| Krachab Ti Pir |
3 |
420 |
Canal |
0.15 [ 0.15 ] |
Km |
5,769,100 |
2.030 Depth (m) |
0.000 Volume (m3) |
865,365 |
| Sangvan |
4 |
420 |
Canal |
2.00 [ 2.00 ] |
Km |
5,769,100 |
2.030 Depth (m) |
0.000 Volume (m3) |
11,538,200 |
| Krachab Ti Bei |
5 |
420 |
Canal |
1.20 [ 1.20 ] |
Km |
5,769,100 |
2.030 Depth (m) |
0.000 Volume (m3) |
6,922,920 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
31,153,140 |
Prey Veaeng, Samraong
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141009/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
13,875,000 |
| Trach |
1 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,850,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,700,000 |
| Traok |
2 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,850,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,700,000 |
| Prohut |
3 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,850,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,700,000 |
| Sangkae |
4 |
201 |
Earth road |
1.50 [ 1.50 ] |
Km |
1,850,000 |
4.000 Width (m) |
330.000 Earth fill m3 |
2,775,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
13,875,000 |
| Contract ID |
141009/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
71,300,000 |
| Trach |
1 |
420 |
Canal |
2.30 [ 4.60 ] |
Km |
15,500,000 |
2.270 Depth (m) |
21,050.000 Volume (m3) |
71,300,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
71,300,000 |
Prey Veaeng, Svay Antor
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141010/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
43,987,500 |
| Boeng |
1 |
240 |
Concrete bridge (general) |
1.00 [ 1.00 ] |
Place |
17,900,000 |
4.000 |
4.000 |
17,900,000 |
| Pou Chrey |
2 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,880,000 |
1.000 Diameter (m) |
4.000 Length (m) |
5,640,000 |
| Pou Chentam |
3 |
211 |
Single pipe culvert |
3.00 [ 3.00 ] |
Place |
1,880,000 |
1.000 Diameter (m) |
4.000 Length (m) |
5,640,000 |
| Svay Antor Ti Muoy |
4 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,880,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,760,000 |
| Svay Antor Ti Pir |
5 |
211 |
Single pipe culvert |
2.00 [ 2.00 ] |
Place |
1,880,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,760,000 |
| Prey Khvaek |
6 |
211 |
Single pipe culvert |
1.00 [ 1.00 ] |
Place |
1,880,000 |
1.000 Diameter (m) |
4.000 Length (m) |
1,880,000 |
| Boeng |
7 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
1,050,000 |
4.000 Width (m) |
800.000 Earth fill m3 |
1,260,000 |
| Prey Khvaek |
8 |
201 |
Earth road |
2.25 [ 2.25 ] |
Km |
1,050,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
2,362,500 |
| Pou Chentam |
9 |
201 |
Earth road |
0.50 [ 0.50 ] |
Km |
1,050,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
525,000 |
| Thlav |
10 |
201 |
Earth road |
1.20 [ 1.20 ] |
Km |
1,050,000 |
4.000 Width (m) |
0.000 Earth fill m3 |
1,260,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
43,987,500 |
| Contract ID |
141010/06/02 |
TSO |
Ly Sethy |
Project Type |
Irrigation |
70,138,700 |
| Pou Chentam |
1 |
420 |
Canal |
1.00 [ 5.20 ] |
Km |
6,405,364 |
1.640 Depth (m) |
19,630.000 Volume (m3) |
33,307,893 |
| Pou Chrey |
2 |
420 |
Canal |
3.40 [ 3.85 ] |
Km |
6,405,364 |
1.640 Depth (m) |
0.000 Volume (m3) |
24,660,651 |
| Svay Antor Ti Muoy |
3 |
420 |
Canal |
1.05 [ 1.05 ] |
Km |
6,405,364 |
1.640 Depth (m) |
0.000 Volume (m3) |
6,725,632 |
| Svay Antor Ti Pir |
4 |
420 |
Canal |
0.85 [ 0.85 ] |
Km |
6,405,364 |
1.640 Depth (m) |
0.000 Volume (m3) |
5,444,559 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
70,138,736 |
Prey Veaeng, Tuek Thla
| Village |
No. |
Code |
Description |
Qty [Contracted] |
Unit |
Dimension #1 |
Dimension #2 |
Total |
| Contract ID |
141011/06/01 |
TSO |
Ly Sethy |
Project Type |
Rural Transport |
93,758,400 |
| Pra'uol Tuek |
1 |
203 |
Gravel road |
2.20 [ 2.20 ] |
Km |
11,096,000 |
4.500 Width (m) |
3,004.000 Earth fill m3 |
24,411,200 |
| Poun |
2 |
203 |
Gravel road |
0.80 [ 0.80 ] |
Km |
11,096,000 |
4.500 Width (m) |
0.000 Earth fill m3 |
8,876,800 |
| Traok |
3 |
203 |
Gravel road |
1.30 [ 1.30 ] |
Km |
11,096,000 |
4.500 Width (m) |
0.000 Earth fill m3 |
14,424,800 |
| Tuol Ampil |
4 |
203 |
Gravel road |
0.15 [ 2.35 ] |
Km |
11,096,000 |
4.500 Width (m) |
0.000 Earth fill m3 |
26,075,600 |
| Pra'uol Tuek |
5 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
3,500,000 |
1.000 Diameter (m) |
4.000 Length (m) |
3,500,000 |
| Pra'uol Tuek |
6 |
212 |
Double pipe culvert |
2.00 [ 2.00 ] |
Place |
1,050,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,100,000 |
| Sangkae Chrum |
7 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,050,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,050,000 |
| Poun |
8 |
212 |
Double pipe culvert |
1.00 [ 1.00 ] |
Place |
1,050,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,050,000 |
| Prey Lveay |
9 |
201 |
Earth road |
2.50 [ 2.50 ] |
Km |
1,520,000 |
5.000 Width (m) |
150.000 Earth fill m3 |
3,800,000 |
| Kanlaong |
10 |
201 |
Earth road |
2.20 [ 2.20 ] |
Km |
1,520,000 |
5.000 Width (m) |
0.000 Earth fill m3 |
3,344,000 |
| Tuol Ampil |
11 |
201 |
Earth road |
1.30 [ 1.30 ] |
Km |
1,520,000 |
5.000 Width (m) |
0.000 Earth fill m3 |
1,976,000 |
| Tuol Ampil |
12 |
212 |
Double pipe culvert |
0.00 [ 1.00 ] |
Place |
1,050,000 |
0.600 Diameter (m) |
5.000 Length (m) |
1,050,000 |
| Kanlaong |
13 |
212 |
Double pipe culvert |
0.00 [ 2.00 ] |
Place |
1,050,000 |
0.600 Diameter (m) |
5.000 Length (m) |
2,100,000 |
| Note: Qty [Contract] : Planned qty [ qty in contract signed ] |
Grand Total: |
93,758,400 |